| 1 | fo|qr forj.k [k.M&f}rh;] vkuUnuxj ds vUrxZr tek ;kstuk esa Lohd`r izkDdyu la[;k 38@2020&21 ¼eYVh ijit gky] xzke&x.ks\"kiqj] Cykd&Qjsank] egjktxat dks 06 fdok0 la;kstu nsus gsrq ykbZu fuekZ.k dk dk;Z½ ds dk;ksZ dks djk;s tkus gsrq fooj.k%& |
| 2 | Loading, unloading and Carriage of following material from Store Centre, Maharajganj to work site:- PCC Pole 8.5 Mtr. long- 05 Nos., ACSR Weasel Conductor- 0.824 Km., Stay Complete- 04 Nos., ST Clamp with Nuts & Bolts- 20 Nos., ST Shackle Insulator with Nuts & Bolts- 20 Nos., Bolts & Nuts for Shackle Insulator- 07 Kg., LT PVC Cable (4x25mm²- 40 Mtrs. |
| 3 | Erection of Single PCC Pole with all fitting |
| 4 | Grouting of Pole |
| 5 | Stringing and sagging of ACSR Weasel Conductor |
| 6 | Erection of Stay |
| 7 | Cutting of Tree Branches |
| 8 | fo|qr forj.k [k.M&f}rh;] vkuUnuxj ds vUrxZr tek ;kstuk esa Lohd`r izkDdyu la[;k 33@2020&21 ¼is;ty ;kstuk xke& lgtuoka ckcw] Cykd&c`teuxat] egjktxat dks 20 ,p0ih0 $ 02 fdok0 la;kstu nsus gsrq ykbZu fuekZ.k dk dk;Z½ ds dk;ksZ dks djk;s tkus gsrq fooj.k%& |
| 9 | Loading, unloading and Carriage of following material from Store Centre, Maharajganj to work site:- PCC Pole 8.5 Mtr. long- 09 Nos., ACSR Weasel Conductor- 1.081 Km., 11 KV Pin Insulator with Pin- 24 Nos., 11 KV Disc Insulator with disc fitting- 18 Nos., 11 KV \"V\" Type X-Arm- 05 Nos, 25 KVA T/F- 01 No., Top Channel- 01 No., Tee-off Channel- 05 Nos., Dropper Angle- 01 No., Stay complere- 07 Nos., Earthing complere- 09 Nos., 11 KV X-arm holding Clamp- 05 Nos., Top Channel & Dropper Clamp with Nuts & Bolts- 04 Nos., Tee of Channel clamp with Nuts & Bolts- 05 Nos., F-bracket with Nuts & Bolts- 06 Nos, LT PVC Cable 4x25 mm²- 20 Mtrs., MS Angle 75x75x6x2028 (T/F Base)- 02 Nos. |
| 10 | Erection of Single PCC Pole with all fitting |
| 11 | Erection of Double PCC Pole with all fitting |
| 12 | Grouting of Pole |
| 13 | Earthing of Pole |
| 14 | Stringing and sagging of ACSR Weasel Conductor |
| 15 | Erection of Stay |
| 16 | Mounting of 25 KVA T/F on Double Pole and its connection |
| 17 | Cutting of Tree Branches |
| 18 | fo|qr forj.k [k.M&f}rh;] vkuUnuxj ds vUrxZr tek ;kstuk esa Lohd`r izkDdyu la[;k 04@2021&22 ¼lkeqnkf;d LokLF; dsUnz cudVh] Qjsank] egjktxat dks 32 dsoh,0 ls c<+kdj 69 dsoh,0 Hkkj c`f) gsrq ykbZu ykbZu fuekZ.k dk dk;Z½ ds dk;ksZ dks djk;s tkus gsrq fooj.k%& |
| 19 | Loading, unloading and Carriage of following material from Store Centre, Maharajganj to work site:- ACSR Weasel Conductor- 0.015 Km., 11 KV Pin Insulator with Pin- 03 Nos., 100 KVA T/F- 01 No., Stay complete- 02 Nos., Earthing Complete- 02 Nos., XLPE Cable (3x70 mm²)- 20 Mtrs., Jointing Kit O/D & I/D Cable suitable for 70 mm XLPE Cable- 04 Nos, Droper Angle- 01 No., MS Angle 75x75x6x2028 (T/F Base)- 02 Nos., 3 Phase 4 Wire Electronic Meter 11 KV TVM- 02 Nos., 11 KV PPMC 5/5 Amp.- 01 No., 11 KV CT/PT combined unit CTR 5/5 Amp.- 01 No., 11 KV S/s Base- 02 Nos., Nuts & Bolts- 05 Kg. |
| 20 | Erection of Stay |
| 21 | Earthing of Pole |
| 22 | Stringing and sagging of ACSR Weasel Conductor |
| 23 | Mounting of 100 KVA T/F on Double Pole and its connection |
| 24 | Laying of XLPE Cable |
| 25 | Erection of CT/PT combined unit on double pole |
| 26 | Jointing of Cable Jointing Kit |
| 27 | Erection of PPMC |
| 28 | Erection of TVM |
| 29 | Loading unloading and carriage of old 63 KVA T/F from work site to JE dump store/store centre, Maharajganj |