| 1 | fo|qr forj.k [k.M&f}rh;] vkuUnuxj ds vUrxZr tek ;kstuk esa Lohd`r izkDdyu la[;k 36@2020&21 ¼lj;w ugj ifj;kstuk ds vUrxZr xzke lksgjofy;k dyka] Cykd Qjsank] egjktxat esa ugj ds Åij ls 11 dsoh0 ykbZu dh f\"k¶Vax dk dk;Z½ ds dk;ksZ dks djk;s tkus gsrq fooj.k%& |
| 2 | Loading, unloading and Carriage of following material from Store Centre, Maharajganj to work site:- ST Pole 11 Mtr. long- 02 Nos., ACSR Weasel Conductor- 0.185 Km., 11 KV Pin Insulator with Pin- 06 Nos., 11 KV Disc Insulator with disc fitting- 03 Nos., 11 KV \"V\" Type X-Arm- 02 Nos, Stay complete- 02 Nos., Earthing complere- 02 Nos., Guarding Angle- 02 Nos., 11 KV X-arm holding Clamp- 02 Nos., F-bracket with Nuts & Bolts- 02 Nos., Guarding Angle Clamp with Nuts & Bolts- 02 Nos. GI Wire- 22 Kg. |
| 3 | Erection of Single ST Pole with all fitting |
| 4 | Grouting of Pole |
| 5 | Earthing of Pole |
| 6 | Erection of Stay |
| 7 | Dismentalling of old 11 KV Line |
| 8 | Sagging of 11 KV Line |
| 9 | Stringing and sagging of ACSR Weasel Conductor |
| 10 | Painting of Pole |
| 11 | fo|qr forj.k [k.M&f}rh;] vkuUnuxj ds vUrxZr tek ;kstuk esa Lohd`r izkDdyu la[;k 05@2021&22 ¼lj;w ugj ifj;kstuk ds vUrxZr xzke dEgfj;k [kqnZa] Cykd Qjsank] egjktxat esa ugj ds Åij ls 11 dsoh0 ykbZu dh f\"k¶Vax dk dk;Z½ ds dk;ksZ dks djk;s tkus gsrq fooj.k%& |
| 12 | Loading, unloading and Carriage of following material from Store Centre, Maharajganj to work site:- ST Pole 11 Mtr. long- 04 Nos., ACSR Weasel Conductor- 0.309 Km., 11 KV Pin Insulator with Pin- 12 Nos., 11 KV Disc Insulator with disc fitting- 06 Nos., 11 KV \"V\" Type X-Arm- 04 Nos, Stay complete- 04 Nos., Earthing complere- 04 Nos., Guarding Angle- 04 Nos., 11 KV X-arm holding Clamp- 04 Nos., F-bracket with Nuts & Bolts- 04 Nos., Guarding Angle Clamp with Nuts & Bolts- 04 Nos. GI Wire- 44 Kg. |
| 13 | Erection of Single ST Pole with all fitting |
| 14 | Grouting of Pole |
| 15 | Earthing of Pole |
| 16 | Erection of Stay |
| 17 | Dismentalling of old 11 KV Line |
| 18 | Sagging of 11 KV Line |
| 19 | Stringing and sagging of ACSR Weasel Conductor |
| 20 | Painting of Pole |
| 21 | fo|qr forj.k [k.M&f}rh;] vkuUnuxj ds vUrxZr tek ;kstuk esa Lohd`r izkDdyu la[;k 06@2021&22 ¼lj;w ugj ifj;kstuk ds vUrxZr xzke lsejkMkjha] Cykd Qjsank] egjktxat esa ugj ds Åij ls 11 dsoh0 ykbZu dh f\"k¶Vax dk dk;Z½ ds dk;ksZ dks djk;s tkus gsrq fooj.k%& |
| 22 | Loading, unloading and Carriage of following material from Store Centre, Maharajganj to work site:- ST Pole 11 Mtr. long- 04 Nos., ACSR Weasel Conductor- 0.247 Km., 11 KV Pin Insulator with Pin- 06 Nos., 11 KV Disc Insulator with disc fitting- 03 Nos., 11 KV \"V\" Type X-Arm- 02 Nos, Stay complete- 04 Nos., Earthing complere- 02 Nos., Guarding Angle- 02 Nos., 11 KV X-arm holding Clamp- 02 Nos., F-bracket with Nuts & Bolts- 02 Nos., Guarding Angle Clamp with Nuts & Bolts- 02 Nos. GI Wire- 22 Kg., LT Clamp with Nuts & Bolts- 02 Nos., LT Shackle Insulator with Nuts & Bolts- 02 Nos., Nuts & Bolts for Shackle Insulator- 01 Kg., |
| 23 | Erection of Single ST Pole with all fitting |
| 24 | Grouting of Pole |
| 25 | Earthing of Pole |
| 26 | Erection of Stay |
| 27 | Dismentalling of old 11 KV Line |
| 28 | Sagging of 11 KV Line |
| 29 | Stringing and sagging of ACSR Weasel Conductor |
| 30 | Painting of Pole |
| 31 | Cutting of Tree Branches |
| 32 | fo|qr forj.k [k.M&f}rh;] vkuUnuxj ds vUrxZr tek ;kstuk esa Lohd`r izkDdyu la[;k 07@2021&22 ¼lj;w ugj ifj;kstuk ds vUrxZr xzke cM+gjk nsohpju ls ijlk egUFk ds chp] Cykd Qjsank] egjktxat esa ugj ds Åij ls 11 dsoh0 ykbZu dh f\"k¶Vax dk dk;Z½ ds dk;ksZ dks djk;s tkus gsrq fooj.k%& |
| 33 | Loading, unloading and Carriage of following material from Store Centre, Maharajganj to work site:- ST Pole 11 Mtr. long- 08 Nos., ACSR Dog Conductor- 0.185 Km, ACSR Weasel Conductor- 0.927 Km., 11 KV Pin Insulator with Pin- 15 Nos., 33 KV Pin Insulator with pin- 06 Nos., 11 KV Disc Insulator with disc fitting- 06 Nos., 33 KV Disc Insulator with disc fitting- 12 Nos., 11 KV \"V\" Type X-Arm- 05 Nos, 33 KV \"V\" Type X-Arm- 02 Nos, Stay complete- 08 Nos., Earthing complere- 08 Nos., 33 KV Top Channel- 02 Nos., Guarding Angle- 06 Nos., \"V\" Type X-arm holding Clamp- 07 Nos., 33 KV F-bracket with Nuts & Bolts- 02 Nos., F-bracket with Nuts & Bolts- 05 Nos., Top Channel clamp with Nuts & Bolts- 04 Nos., Guarding Angle Clamp with Nuts & Bolts- 06 Nos. GI Wire- 110 Kg. |
| 34 | Erection of Double ST Pole with all fitting |
| 35 | Erection of Single ST Pole with all fitting |
| 36 | Grouting of Pole |
| 37 | Earthing of Pole |
| 38 | Erection of Stay |
| 39 | Guarding of 11 KV Line |
| 40 | stringing and sagging of ACSR Dog/Weasel Conductor |
| 41 | Dismentalling of old 11 KV Line |
| 42 | Sagging of 11 KV Line |
| 43 | Dismentalling of old 33 KV Line |
| 44 | Sagging of 33 KV Line |
| 45 | Painting of Pole |