To Design And Build All Components Of The Drinking Water Supply Systems Includingwater Treatment Plants Atghattian Wali Bodla Of 34 Mld Capacity And At Sohangarh Urf Ratte Wala Of 12 Mld Capacity, Storage Tanks, Raw Water And Clear Water Pumping Station, as per bid document-Punjab

Water Supply And Sanitation Department-WSSD has published To Design And Build All Components Of The Drinking Water Supply Systems Includingwater Treatment Plants Atghattian Wali Bodla Of 34 Mld Capacity And At Sohangarh Urf Ratte Wala Of 12 Mld Capacity, Storage Tanks, Raw Water And Clear Water Pumping Station. Submission Date for this Tender is 21-12-2021. Tanks and Cylinders Tenders in as per bid document Punjab. Bidders can get complete Tender details and download the document.




Tender Notice

29413448
Corrigendum : To Design And Build All Components Of The Drinking Water Supply Systems Includingwater Treatment Plants Atghattian Wali Bodla Of 34 Mld Capacity And At Sohangarh Urf Ratte Wala Of 12 Mld Capacity, Storage Tanks, Raw Water And Clear Water Pumping Station
Open Tender
Indian
Punjab
as per bid document
21-12-2021

Tender Details

To Design And Build All Components Of The Drinking Water Supply Systems Includingwater Treatment Plants Atghattian Wali Bodla Of 34 Mld Capacity And At Sohangarh Urf Ratte Wala Of 12 Mld Capacity, Storage Tanks, Raw Water And Clear Water Pumping Stations Along With Pumping Electro Mechanical Machinery, Clear Water Transmission Mains Up To Inlet Of Existing / Proposed Ohsr’S / Esr’S In Various Villages With Adequate Head, Installation Ofbulk Water Meters, Generators, Transformers, Scada / Plc Etc. For Providing Bulk Supply Of Treated Water To Large Group Of Villages In Block Jalalabad, Arniwala & Fazilka District Fazilka & Block Guruharsahai, District Ferozepur ( Punjab ) On Dbot Basisii ) Operation & Maintenance Of The Same And Supply Of Treated Water To Various Villages In Block Jalalabad, Arniwala & Fazilka District Fazilka & Block Guruharsahai, District Ferozepur ( Punjab ) For A Period Of 120 Months After Commissioning

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 16-Oct-2021 Pre-Bid Meeting Other 16-11-2021
2 30-Oct-2021 Date Extend Date 24-11-2021
3 15-Nov-2021 Corrigendum3 Technical Bid 24-11-2021
4 24-Nov-2021 Corrigendum Date 02-12-2021
5 01-Dec-2021 Corrigendum1 Date 17-12-2021
6 03-Dec-2021 Technical Technical Bid 17-12-2021
7 17-Dec-2021 Corrigendum 17-12-2021 Date 21-12-2021

Key Value

Document Fees
INR 1 /-
EMD
INR 40500000.0 /-
Tender Value
INR 404.95 Crore /-

BOQ Items

Name of Work: I) TO DESIGN AND BUILD ALL COMPONENTS OF THE DRINKING WATER SUPPLY SYSTEMS INCLUDINGWATER TREATMENT PLANTS ATGHATTIAN WALI BODLA OF 34 MLD CAPACITY AND AT SOHANGARH URF RATTE WALA OF 12 MLD CAPACITY, STORAGE TANKS, RAW WATER AND CLEAR WATER PUMPING STATIONS ALONG WITH PUMPING ELECTRO MECHANICAL MACHINERY, CLEAR WATER TRANSMISSION MAINS UP TO INLET OF EXISTING/PROPOSED OHSR’s/ESR’s IN VARIOUS VILLAGES WITH ADEQUATE HEAD, INSTALLATION OFBULK WATER METERS,GENERATORS, TRANSFORMERS, SCADA/PLC ETC. FOR PROVIDING BULK SUPPLY OF TREATED WATER TO LARGE GROUP OF VILLAGES IN BLOCK JALALABAD, ARNIWALA & FAZILKA DISTRICT FAZILKA & BLOCK GURUHARSAHAI, DISTRICT FEROZEPUR (PUNJAB) ON DBOT BASIS II) OPERATION & MAINTENANCE OF THE SAME AND SUPPLY OF TREATED WATER TO VARIOUS VILLAGES IN BLOCK JALALABAD, ARNIWALA & FAZILKA DISTRICT FAZILKA & BLOCK GURUHARSAHAI, DISTRICT FEROZEPUR (PUNJAB)FOR A PERIOD OF 120 MONTHS AFTER COMMISSIONING
Sl. No. Item Description
1Activity:- 1- Design Services
2GPS ground control survey for verifying the authenticity of AutoCAD based maps / information provided by DWSS, sub-soil investigations for design and estimation and chemical testing of raw water quality
3WTP Ghattian Wali Bodla
4WTP Sohangarh urf Ratte Wala
5Preparation of design report for all works specified for the complete Water Supply System
6WTP Ghattian Wali Bodla
7WTP Sohangarh urf Ratte Wala
8Preparation of detailed design and drawings including technical specification of all works according to approved design .
9WTP Ghattian Wali Bodla
10WTP Sohangarh urf Ratte Wala
11Provisional sum for establishment of Project Office of Contractor at WTP with complete office amenities to support project execution, drinking water and sanitation facilities,material stacking area, equipment holding area, vehicle parking lot, repair shed for entire duration of contract as per specifications of Labour Department and ESMP. The locations and design shall be submitted to and approved by Employer"s Representative.
12WTP Ghattian Wali Bodla
13WTP Sohangarh urf Ratte Wala
14Provisional sum for establishment of Labour Camp for scheme (with each location having separate camps for male and female labour) with living arrangement, drinking water facilities, cooking arrangement, mosquito net, waste bin etc., for entire duration of construction period as per specifications of Labour Department and ESMP. Each camp shall have separate provisions for male and female labour. The locations and design shall be submitted to and approved by the Employer"s Representative
15WTP Ghattian Wali Bodla
16WTP Sohangarh urf Ratte Wala
17Provisional sum for establishment of temporary labour camps along transmission linenetwork, with living arrangement, drinking water and sanitation facilities, cooking arrangement, mosquito net, waste bin, material stacking, etc., for duration of work at respective sites as per specifications of Labour Department and ESMP. Each camp shall have separate provisions for male and female labour. The locations and design shall be submitted to and approved by Employer"s Representative
18WTP Ghattian Wali Bodla
19WTP Sohangarh urf Ratte Wala
20Provisional sum for implementation and updation of EIA, ESHS-MSIP and development and implementation of Communication Plan for IEC of communities affected due to project activities (construction, disruption of services, traffic regulations, etc.) in accordance with Code of Conduct as submitted to and approved by the Employer"s Representative
21WTP Ghattian Wali Bodla
22WTP Sohangarh urf Ratte Wala
23Establish baseline for Ambient Air Quality Monitoring for PM10, PM2.5, NO2, SO2, CO as per the method defined in Section VII – ESHS-MSIP. Air Quality monitoring at each WTP/Head work (2 locations i.e. at windward side and leeward side), raw water tapping point (1 nos. each Cluster), transmission line (2 nos each Cluster, locations mutually agreed by contractor and Employer"s Representative). Monitoring is to be done as per CPCB guidelines and from CPCB accredited labs. The locations and design shall be submitted to and approved by the Employer"s Representative.
24WTP Ghattian Wali Bodla
25WTP Sohangarh urf Ratte Wala
26Establish baseline for Noise Quality Monitoring at each WTP/Head works (1 no.), raw water each tapping point (1 nos.), transmission line (2 nos each cluster, locations mutually agreed by contractor and Employer"s Representative). Monitoring done as per CPCB guidelines and from CPCB accredited labs. The locations and design shall be submitted to and approved by the Employer"s Representative.
27WTP Ghattian Wali Bodla
28WTP Sohangarh urf Ratte Wala
29Provisional sumfor payment towards which areto be taken by contractor Statutory permits/clearances as per Section VII- ESHS-MSIP
30WTP Ghattian Wali Bodla
31WTP Sohangarh urf Ratte Wala
32Any additional items of work, goods and services to implement as per the ESHS-MSIP, except the items already covered above.
33WTP Ghattian Wali Bodla
34WTP Sohangarh urf Ratte Wala
35Activity:- 2- RAW WATER SYSTEM: Construction and commissioning of Raw Water intake Systems, including lifting of water from canal by suitable action, Raw Water pumping station,Rising Main upto WTP from source. Construction of S&S Tank and RCC Sump at WTP etc for Raw Water at WTP, Gravity main for S&S Tank.
36Construction of Storage & Sedimentation Tank (S/S Tank)in conformity with relevant BIS Code of Practices with latest amendments,Raw water Rising main of required size from Canal to S/S Tank complete in all respect, inconformity withrelevant BISCode of Practices withlatestamendments ¤tatthetimeof execution and following the norms etc. as prescribed by theDepartment of Water Resources,Punjab/CompetentAuthority,all complete.
37WTP Ghattian Wali Bodla (Capacity 102000 CUM)
38WTP Sohangarh urf Ratte Wala (Capacity 36000 CUM)
39Construction of Raw Water Pumping Stations RCC framed suitable sizes minimum 70 Sqm area including accessaries complete in all respect, including lifting of water from canal by suitable action as prescribed by theDepartment of Water Resources,Punjab/CompetentAuthority,all complete.and Providing Raw water pumping machinery with Variable frequency drive panel of appropriate capacity horizontal split casing type electrically operated centrifugal pump set or any other suitable typewith matching drive motor,ofreputed makeand conforming to BIS specification & other regulatory norms, ( with minimum 50% machinery as standby extra than required capacity) with variable frequency drive where required, for raw water pumping including foundation works, electrical and other installation works, providing all necessary suction/delivery piping arrangement with control valves & specials, arrangement for priming pumps with standby provision, priming water tank with staging & required Pipes & specials etc.(common priming arrangement for all the pumps for different route). Furnishing the Manufacturer"s test certificate & characteristic performance curve of the pumps, all complete, All pumps, electrical drive motors & other appurtenances shall be of reputed make & conforming to BIS Specification and other regulatory norms, current at the time of design and execution at Canal.
40WTP Ghattian Wali Bodla
41WTP Sohangarh urf Ratte Wala
42Providing Raw water pumping machinery with Variable frequency drive panel of appropriate capacity horizontal split casing type electrically operated centrifugal pump set or any other suitable type with matching drive motor,ofreputed makeand conforming to BIS specification & other regulatory norms, ( with minimum 50% machinery as standby extra than required capacity) with variable frequency drive where required, for raw water pumping including foundation works, electrical and other installation works, providing all necessary suction/delivery piping arrangement with control valves & specials, arrangement for priming pumps with standby provision, priming water tank with staging & required Pipes & specials etc.(common priming arrangement for all the pumps for different route). Furnishing the Manufacturer"s test certificate & characteristic performance curve of the pumps, all complete, All pumps, electrical drive motors & other appurtenances shall be of reputed make & conforming to BIS Specification and other regulatory norms, current at the time of design and execution at WTP site.
43WTP Ghattian Wali Bodla
44WTP Sohangarh urf Ratte Wala
45Construction of RCC Sump for Raw Water at WTPappropriate capacity including all necessary earthwork in conformity with relevant BIS Code of Practiceswith latest amendments& current at the timeof execution complete in all respects.
46WTP Ghattian Wali Bodla
47WTP Sohangarh urf Ratte Wala
48Supplying, laying, jointing, testing and completion ofDI pipeline of appropriate size and length (as per all relevantBIS specification) for raw water pumping main including allnecessary earthwork, valves&specials, valve chamber, supporting structures, crossing of canals/drains, anchor / thrust block etc. compete in all respect including dismantling, restoration/ reconditioning of all kinds of roads, road berms, culverts, or any other structure to be dismantled during laying of pipe line (as per norms of the concerned department) to its original condition. (S&S Tank to Raw Water Sumpto WTP)
49WTP Ghattian Wali Bodla
50WTP Sohangarh urf Ratte Wala
51Provisional sum for MS Barricading along construction site, of at least 3.05 m. height where deep excavation is required and at least 1.52 m. height other wise, 3 m in front to fully secure the construction site and restricting entry of unauthorized personnel. Barricading to be retained till completion of activity 6.
52WTP Ghattian Wali Bodla
53WTP Sohangarh urf Ratte Wala
54Provisional Sum for Occupational Health and Safety practices including, but not limited to, signage"s at and along construction sites, personal protection equipment and to be retained till completion of activity 6.
55WTP Ghattian Wali Bodla
56WTP Sohangarh urf Ratte Wala
57Dust suppression measures by water spraying 3 times site a day throughout the construction period till completion of works, in and around the works site, uncovered aggregates and loose materials such as stockpiles of the sands, excavated earth etc. daily or as per requirements. Activity to be carried out till completion of activity 6.
58WTP Ghattian Wali Bodla
59WTP Sohangarh urf Ratte Wala
60Provisional Sum for Disposal of waste - silt, C&D, Hazardous waste, vegetation waste as per GoI/ PPCB guidelines and ESIA/ESMP of scheme andECoPs of PRWSSIP ESMF, including safe handling of waste onsite, hauling to authorised disposal sites, and clearances from PPCB/Employer"s Representative. All waste to be disposed within 3 days of generation. to be retained till completion of activity 6.
61WTP Ghattian Wali Bodla
62WTP Sohangarh urf Ratte Wala
63Any additional items of work, goods and services to implement as per the ESHS-MSIP, except the items already covered above.
64WTP Ghattian Wali Bodla
65WTP Sohangarh urf Ratte Wala
66Activity:- 3-WATER TREATMENT SYSTEM: Construction and commissioning of WTP using best suitable technology; probably compact in nature
67Construction of Complete Water Treatment Plants based on usage of surface water supply of minimum output capacity of Ghattian Wali Bodla 34 MLD & Sohangarh urf Ratte Wala 12 MLD with suitable designs in conformity with the relevant BIS Code of practices with latest amendments,having filtration rate not less than 4.8m/hr, provision for disinfection, including all necessary Mechanical and Electrical Installation Works suitable for automated operation of the plant, Provision for Laboratory Facility, sludge management system, all internal connections & by-pass piping system, including provision of minimum 50 sqmt area at ground floor and 1st floor each, for Office, Chemical Storage, blowers and chlorination etc. All internal and external electrification work for compound lighting etc., Electrical control panels for connecting & hooking up of the electrical switch gears of various drive motors of the Treatment Plant units etc. including 3 months trial run period., for Water Treatment Plant, the Bidder can use best, latest and proven technologies so as to have a compact system to save space and ease of management. All the valves and other controls should be DI; instruments should be of best quality; and no leakages are allowed in WTP premises.
68WTP Ghattian Wali Bodla (34 MLD)
69WTP Sohangarh urf Ratte Wala (12 MLD)
70Provisional Sum for M.S Barricading along construction site, including WTP, clear water tank and other structure at water works, of at least 10 ft height where deep excavation is required and at least 5 ft height other wise, 3 m in front to fully secure the construction site and restricting entry of unauthorized personnel Barricading to be retained till completion of activity 9.
71WTP Ghattian Wali Bodla
72WTP Sohangarh urf Ratte Wala
73Provisional Sum for Occupational Health and Safety practices including, but not limited to, signage"s at and along construction sites, personal protection equipment. To be provided till completion of activity 9.
74WTP Ghattian Wali Bodla
75WTP Sohangarh urf Ratte Wala
76Dust suppression measures by water spraying 3 times each WTP a day throughout the construction period till completion of works, in and around the works site, uncovered aggregates and loose materials such as stockpiles of the sands, excavated earth etc. daily or as per requirements. To be continued till completion of activity 9.
77WTP Ghattian Wali Bodla
78WTP Sohangarh urf Ratte Wala
79Provisional Sum for Disposal of waste - silt, C&D, Hazardous waste, vegetation waste as per GoI/ PPCB guidelines and ESIA/ESMP of scheme and ECoPs ESMF, including safe handling of waste onsite, hauling to authorised disposal sites, and clearances from PPCB/Employer. All waste to be disposed within 3 days of generation. To be continued till completion of Activity 9.
80WTP Ghattian Wali Bodla
81WTP Sohangarh urf Ratte Wala
82Air quality monitoring beyond establishing baseline during design build period done every 6 months at each WTP for PM10, PM2.5, NO2, SO2, CO as per the method defined in Section VII – ESHS-MSIP at 2 locationsWTP/Head work (windward and leeward). Monitoring done as per CPCB guidelines and from CPCB accredited labs.
83WTP Ghattian Wali Bodla
84WTP Sohangarh urf Ratte Wala
85Noise quality monitoring beyond establishing baseline during design build period done every 6 months done at each WTP/Head Work as per CPCB guidelines and from CPCB accredited labs at construction site and heavy equipment/material stacking site.
86WTP Ghattian Wali Bodla
87WTP Sohangarh urf Ratte Wala
88Any additional items of work, goods and services to implement as per the ESHS-MSIP, except the items already covered above.
89WTP Ghattian Wali Bodla
90WTP Sohangarh urf Ratte Wala
91Activity:- 4-CLEAR WATER SYSTEM: Construction of Clear Water Reservoir including pump room, machinery, Clear Water Sump at WTP for Clear Water and IPS if any.
92Construction of minimum 6.30 +0.87= 7.17 Million ltrs. Capacity RCC Under Ground Treated Water Sump in 2 (two) compartments and with a suction wells for suction of clear water machinery, having provision for all inlet, outlet & overflow arrangements; calibrated water level indicators; Air Vent Pipes; Man Holes with Covers; PVC Lugs inside the sump etc. In case, intermediate pumping is proposed by the bidder at other than WTP site, then the rate for that should be included in this item
93WTP Ghattian Wali Bodla(4.65+0.87= 5.52 Million Liter)
94WTP Sohangarh urf Ratte Wala(1.65 Million Liter)
95Clear Water Pumping Station with RCC framed structure having minimum 6 meter clear height from floor to bottom of slab, near to clear water suction well of suitable size with all necessary electrical fittings & fixtures viz. light / fan / power socket etc., arrangement of proper ventilation, firefighting, disposal of over flow water from pump sets and necessary plinth protection work. In case, intermediate pumping is proposed by the bidder at other than WTP site, then the rate for that should be included in this item
96WTP Ghattian Wali Bodla
97WTP Sohangarh urf Ratte Wala
98Construction of RCC Sump for clear water at WTPappropriate capacity including all necessary earthwork in conformity with relevant BIS Code of Practiceswith latest amendments& current at the timeof execution complete in all respects.
99WTP Ghattian Wali Bodla
100WTP Sohangarh urf Ratte Wala
101Providing and installation of clear water/ IPS pumping machinery with Variable frequency drive panel of appropriate capacity horizontal split casing type electrically operated centrifugal pump set or any other suitable type with matching drive motor,ofreputed makeand conforming to BIS specification & other regulatory norms, ( with minimum 50% machinery as standby extra than required capacity) with variable frequency drive where required, for clear water pumping including foundation works, electrical and other installation works, providing all necessary suction/delivery piping arrangement with control valves & specials, arrangement for priming pumps with standby provision, priming water tank with staging & required Pipes & specials etc.(common priming arrangement for all the pumps for different route). Furnishing the Manufacturer"s test certificate & characteristic performance curve of the pumps, all complete, All pumps, electrical drive motors & other appurtenances shall be of reputed make & conforming to BIS Specification and other regulatory norms, current at the time of design and execution. In case, intermediate pumping systems are proposed by the bidder at locations outside WTP site, then the rate for that should be included in this item.
102WTP Ghattian Wali Bodla
103WTP Sohangarh urf Ratte Wala
104Provisional Sum for payment towards for Occupational Health and Safety practices including, but not limited to, signage"s at and along construction sites, personal protection equipment. To be continued till completion of Activity 9.
105WTP Ghattian Wali Bodla
106WTP Sohangarh urf Ratte Wala
107Dust suppression measures by water spraying 3 times at each WTPa day throughout the construction period till completion of works, in and around the works site, uncovered aggregates and loose materials such as stockpiles of the sands, excavated earth etc. daily or as per requirement. To be continued till completion of Activity 9.
108WTP Ghattian Wali Bodla
109WTP Sohangarh urf Ratte Wala
110Provisional Sum for Disposal of waste - silt, C&D, Hazardous waste, vegetation waste as per GoI/ PPCB guidelines and ESIA/ESMP of scheme and ECoPs of PRWSSIP ESMF, including safe handling of waste onsite, hauling to authorised disposal sites, and clearances from PPCB/Employer"s Representative. All waste to be disposed within 3 days of generation. To be continued till completion of Activity 9.
111WTP Ghattian Wali Bodla
112WTP Sohangarh urf Ratte Wala
113Any additional items of work, goods and services to implement as per the ESHS-MSIP, except the items already covered above.
114WTP Ghattian Wali Bodla
115WTP Sohangarh urf Ratte Wala
116Activity:- 5-CLEAR WATER SYSTEM: Providing, Laying, jointing and testing of Transmission Systems connecting all villages to be covered in the scheme for defined supply conditions
117Supplying, laying, jointing, testing and commissioning of requisite dia. DITransmissionMains (as per all relevantBIS specifications) from proposed Clear Water Reservoir/ (UGSR)to the Existing/ Proposed OHSRs of the Existing/ Proposed village Water supply systems including all necessary earthwork, crossing of drains/ canals/ culverts etc., air valves, flow control valves, pressure regulating valves, necessary Specials, flow meters, valve chambers, supporting structures, anchor/ thrust block etc. including dismantling, restoration/ reconditioning of all kinds of roads, road berms, culverts, or any other structure to be dismantled during laying of pipe line (as per norms of the concerned department) to its original condition.
118WTP Ghattian Wali Bodla
119WTP Sohangarh urf Ratte Wala
120For pipe dia 500 mm and above – Provisional Sum for Installation of a steel (MS) portable barricade with horizontal rail 300 mm wide, 2.5m in length fitted on a frame made with 45x45x5 mm angle iron section, 1.5 m in height, horizontal rail painted (2 Coats) with yellow and white stripes, 150 mm in width at an angle of 450, A frame painted with 2 coats of yellow paint, complete as per IRC: SP: 55-2001 complete as per specifications till the road is made motorable.
121WTP Ghattian Wali Bodla
122WTP Sohangarh urf Ratte Wala
123For Pipes dia less than 500mm Provisional Sum for Installation of barricade made of wooden components, 1.5 m high from road level, fitted with 3 horizontal planks 200 mm wide and 3.66 m long on 100 x 100mm wooden vertical post, painted with yellow and white stirrups, 150 mm in width at an angle of 45 degree, complete as per IRC:SP:55-2001.
124WTP Ghattian Wali Bodla
125WTP Sohangarh urf Ratte Wala
126Provisional Sum for payment towards for Occupational Health and Safety practices including, but not limited to, signage"s at and along construction sites, personal protection equipment
127WTP Ghattian Wali Bodla
128WTP Sohangarh urf Ratte Wala
129Dust suppression measures by water spraying 3 times a day at each Cluster throughout the construction period till completion of works, in and around the works site, uncovered aggregates and loose materials such as stockpiles of the sands, excavated earth etc. daily or as per requirements
130WTP Ghattian Wali Bodla
131WTP Sohangarh urf Ratte Wala
132Provisional Sum for Disposal of waste - silt, C&D, Hazardous waste, vegetation waste as per GoI/ PPCB guidelines and ESIA/ESMP of scheme andECoPs of PRWSSIP ESMF, including safe handling of waste onsite, hauling to authorised disposal sites, and clearances from PPCB/Employer"s Representative. All waste to be disposed within 3 days of generation.
133WTP Ghattian Wali Bodla
134WTP Sohangarh urf Ratte Wala
135Ambient Air quality monitoring beyond establishing baseline during design build period done every 6 months at each cluster for PM10, PM2.5, NO2, SO2, CO as per the method defined in Section VII – ESHS-MSIP at 2 locations (windward and leeward). Monitoring done as per CPCB guidelines and from CPCB accredited labs.
136WTP Ghattian Wali Bodla
137WTP Sohangarh urf Ratte Wala
138Noise quality monitoring beyond establishing baseline during design build period done every 6 months done at each cluster as per CPCB guidelines and from CPCB accredited labs at construction site and heavy equipment/material stacking site.
139WTP Ghattian Wali Bodla
140WTP Sohangarh urf Ratte Wala
141Any additional items of work, goods and services to implement as per the ESHS-MSIP, except the items already covered above.
142WTP Ghattian Wali Bodla
143WTP Sohangarh urf Ratte Wala
144Activity:- 6SITE DEVELOPMENT: Development of Raw Water Pumping Station, WTP Area, clear water system and any intermediate pumping system including Boundary Walls
145Land Development & Security Brick/RCC boundary Wall, designed to withstand all weather conditions, of 1.8 mtr. height around Raw Water systems, Water Treatment plant area (including clear water systems) and any other intermediate pumping systems if any including MS gates finishedwithsuitable paint including 3.50 mtr. wide internal road suitable for appropriate loading,arboriculture,compound illuminationwith sufficientno. of Solar street lights designed for suitable luminosity to cover complete systems built under this includingnecessary labour, materials, paintings, site development for aesthetics, etc complete in all respects. In case, intermediate pumping is proposed by the bidder at other than WTP site, then the rate for that should be included in this item.
146WTP Ghattian Wali Bodla
147WTP Sohangarh urf Ratte Wala
148Plantation of trees at each WTP and approach roads. Impacted trees to be identified by Operator in consultation with Forest Department in presence of Employer"s Representative to ensure no endangered species impacted. Locations for plantation of trees to be submitted to and approved by Employer"s Representative. Plant Species to be planted as per the guidance of Forest Department. Tree plantation to be completed during defect liability period and must ensure survival of plants throughout O&M period.
149WTP Ghattian Wali Bodla
150WTP Sohangarh urf Ratte Wala
151Any additional items of work, goods and services to implement as per the ESHS-MSIP, except the items already covered above.
152WTP Ghattian Wali Bodla
153WTP Sohangarh urf Ratte Wala
154Activity:- 7Providing, Installtion and Commissioning Generator Set and Trasformer
155Providing, Installing and Commissioning ofSub Station system with necessary Transformers, capacitors etc., to meet demand of all electrical systems’ capacity to run Raw Water Pumping Machinery, Water Treatment Plant, Clear Water Pumping Machinery and other electrical accessories within the premises of Raw Water pumping station area and WTP area including meter room as per requirement of PSPCL, connecting electric cables, HT panel etc., suitable protection and all other works contingent there to complete in all respect at Canal & WTP. In case, intermediate pumping is proposed by the bidder at other than WTP site, then the rate for that should be included in this item.
156WTP Ghattian Wali Bodla
157WTP Sohangarh urf Ratte Wala
158Providing, Installing and Commissioning low noise (Silent) Generating Set of Suitable capacity to run Raw Water Pumping Machinery, Water Treatment Plant, Clear Water Pumping Machinery and other electrical accessories within the premises of Raw Water pumping station area and WTP area, connecting electric cables, HT panel etc., suitable protection and all other works contingent there to complete in all respect at Canal & WTP. In case, intermediate pumping is proposed by the bidder at other than WTP site, then the rate for that should be included in this item.
159WTP Ghattian Wali Bodla
160WTP Sohangarh urf Ratte Wala
161Activity:- 8Monitoring Systems: Implementation and operation of SCADA includes PLC and other instrumentation
162Supplying, Installing, synchronizing, testing and completion of SCADA systems. as per Section VIII Technical Specification of SCADA .
163WTP Ghattian Wali Bodla
164WTP Sohangarh urf Ratte Wala
165Supplying, installing and testing of Electro Magnetic Flow Meters (AMR)(as per all relevant BIS or ISO specification with latest amendments) of reputed make, along with dismantling joints, at required locations, complete in all respects as per Section VIII Technical Specification of SCADA
166WTP Ghattian Wali Bodla
167WTP Sohangarh urf Ratte Wala
168Activity:- 9Construction of office Building and Staff quarter
169Building for Official use for DWSS with area 70.00 sqmt having 600 mm. high plinth & 3300 mm. finished clear roof height including toilet block at treatment plant site having aluminium casement window / ventilator, 1st. class local hard Wood door frame, 1st. class local hard Wood panelled shutter (Toilet door shall be of solid moulded PVC frame & 25 mm. thick PVC shutter), internal wall finished with plastic paint & exterior surfaces finished with weather coat cement paint with RCC roof slab including all necessary internal water supply & sanitary installation work, internal electrification (with concealed copper wiring of required Cross Section area) with all necessary electrical fittings & fixturesviz., light / fan / power socket etc., necessary plinth protection work, white ant treatment, compound electrification with LED & Installation of 2 Nos. Air Conditioners of 1.5 ton capacity each.
170WTP Ghattian Wali Bodla
171WTP Sohangarh urf Ratte Wala
172Twin type accommodation at Treatment Plant Location for 1 (one) No. Plant Operator and 1 (one) No. Chowkider having total plinth area of 84.5 sqm (42.25 sqm per dwelling unit) having 600 mm. high plinth & 3300 mm. finished clear roof height comprising of 1 bed room with attached toilet, 1 living room, 1 kitchen & 1 entry veranda having aluminium casement window / ventilator, 1st. class local hard Wood door frame, 1st. class local hard Wood panelled shutter (Toilet door shall be of solid moulded PVC frame & 25 mm. thick PVC shutter), internal wall finished with plastic paint & exterior surfaces finished with weather coat cement paint with RCC roof slab including all necessary internal water supply & sanitary installation work , internal electrification (with concealed copper wiring of required Cross Section area) with all necessary electrical fittings & fixturesviz., light / fan / power socket etc., necessary plinth protection work, white ant treatment, compound electrification with LED.
173WTP Ghattian Wali Bodla
174WTP Sohangarh urf Ratte Wala
175Note
176Wherein sub activity Item Description column, it is mentioned “Provisional Sum”, no rate is to be quoted for that sub activity, but the scope of work described in that sub activity has to be executed at site. Its loading, if any, may be done by bidder in price of other related sub activities.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail