| 1 | Construction ofCoffer dam by sand bags with sewing &laying in position including allcharges,labour, cost,conveyance & royalty of all materials etc. complete as per direction of Engineer-in-Charge. |
| 2 | Dewatering of waste water from drain inlet to outlet by deploying 5 HP diesel pumpset including all charges etc complete. |
| 3 | Dismantallingof damaged condition of Cement Concrete of road including all charges and remvoving these within initial lead of 50.00 mtr etc complete. |
| 4 | Removal of excavated earth away from work site to out site by mechanical means including loading & unloading and dumping within 5 Km lead etc complete as per direction of Engineer -in- charge. |
| 5 | Providing & laying cement concrete of prop (1:4:8)) in foundation bed and floors using 40mm nominal size down graded, screened, washed hard black crusher broken granite metal of approved quality & from approved quarry including laying in the layers not exceeding 150mm thick hoisting, lowering, laying,watering and curing etc. Complete. To the required levels including cost, conveyance, royality and taxes of all materials, cost of all labour, T&P etc. as required for the work complete and as per direction of Engineer in charge. |
| 6 | Providingcement concrete for unreinforced cement concrete works of ( 1:2:4 )using 12mm20 mm size crusher broken hard granite (CBHG) stone chips of approved quality and from approved quarry on the road surface including cost of labour, materials (inclusive of cost, conveyance, royalties, taxes, loading and unloading) & equipments for handing, transportation, batching, mixing, placing in position / layers, vibrating, curing for7dayscomplete as per specification drawing and direction of theEngineer-in-charge. |
| 7 | Supplying all materials , Labour T & P for constructing the following sizes RCC Drain including earth work in excavation in all kinds of soil, slushy soil, dismantling the damaged masonry walls, damaged bed concrete, filling in foundation and plingth and cavities with sand with well waterd and rammed, providing Plain Cement Concrete (PCC) with CC 1:4:8 in foundation bed, providing RCC work using M20 grade concrete in base slab and vertical walls including rigid and smooth centering and shuttering with dismantling the same after the casting work is over and providinf reinforcement @ 0.50Qtl /Cum of M20 concrete and removal of excavated and dismanteled material by mechanical means up to 5.00Km distance and providing weep holes at suitable locations,including all costs, all conveyances, royalities, taxes etc all complete as per the relavant specifications and direction of Engineer in charge.0.45 x x0.45 Mtr |
| 8 | Additional depth |
| 9 | Supplying all materials , Labour T & P for constructing and providing the following sizes RCC pre cast Cover slab for Drain includingusing M20 grade concrete including rigid and smooth centering and shuttering with dismantling the same after the casting work is over and providing reinforcement @ 0.63Qtl /Cum of M20 concrete andproviding weep holes at suitable locations,including all costs, all conveyances, royalities, taxes etc all complete as per the relavant specifications and direction of Engineer in charge.0.45 x x0.45 Mtr |
| 10 | Additional depth |
| 11 | Making signage board at site & unforseen items i.eslab removal, slab side planks etc at site |