Periodic Maintenance Of Indra Gandhi Stadium And Binwa Public School At Baijnath Drrp No Hp0403vr0142 (Amp 2021-22 )Other Than Pmgsy Providing And Laying Built Up Spray Grout Single Layer, Tack Coat And 25 Mm Thick Bituminous Concrete At Km 0/000 To 0/40
Tender Overview
Project Description
Periodic Maintenance Of Indra Gandhi Stadium And Binwa Public School At Baijnath Drrp No Hp0403vr0142 (Amp 2021-22 )Other Than Pmgsy Providing And Laying Built Up Spray Grout Single Layer, Tack Coat And 25 Mm Thick Bituminous Concrete At Km 0/000 To 0/400
BOQ
| Sl. No. | Item Description |
| 1 | Providing laying spreading and compacting stone aggregateof size 63mm to 45mm (sixty three millimetre to forty five millimetre) Grading-II towater bound Macadam specification including spreading in uniform thickness using template,hand packing, rolling with three wheel 80-100 K.N. static roller in stages to proper grade andcamber, applying and brooming, stone screening type-B of size 11.2mm (eleven decimal point two millimetre) nominal size at the rate of 0.20 cubic metre (zero point two zero cubic metre) per ten square metre and binding material at the rate of 0.06 cubic metre (zero decimal zero six) cubic metre per ten square metreto fill up the intersitices ofcoarseaggregate, watering andcompacting to the requireddensity as per M.O.R.D. technical specifications clause No. 405 and to the entire satisfaction and direction ofEngineer - in- Chargeincluding hauling /carriage of materials to various location through all modes of transportationin all leads, lifts and other incidental complete in all respect. The rate is including octroi, royality, GST, toll tax, Sale Tax or other taxes imposed by the government. |
| 2 | Providing and applying primer coat with BITUMEN emulsion (SS-1) on the prepared surface of granular base including cleaning of road surface and spraying primer @0.85 Kg. per Sqm.( zero point eighty five kilograme) persquare metre using mechanical means as perM.O.R.D. technical specifications clause No. 502 and as per directions ofEngineer - in- Charge including carriage of materials within all leads and liftsand other incidential . The rateincludes octroi,royality, Malkana, toll tax, sale tax orother taxesimposed by the Government. |
| 3 | Providing laying and rolling built-up-spray grout layer over prepared base consisting of a single layer composite construction of compacted crushed stone agg. Using motor grader for aggregates key stone chips spreader may be used with application of bituminous binder after each layer, and with key aggregates placed on top of the second layer to serve as a base, conforming to the line, grades and cross-section specified, the compacted layer thickness being 75mm (seventy five millimetre) as per technical specification clause 505 ( Bitumen VG-10) and as per direction of Engineer with in all leads and lifts and other incidental. |
| 4 | Providing and applying tack coat with Bitument emulsion (RS-I) using emulsion pressure distributor at the rate of 0.275 kg. (zero point two two five kilograms) per/ Square metre on the prepared bituminous cleaned with hydraulic broom as per M.O.R.D. technical specifications section No. 503 as per the entire satisfaction and direction of Engineer-In-Charge including carriage of materials within all leads and lifts and other incidentals. The rate including of octroi, royality, Malkana, toll tax, sale tax or other taxes imposed by the government. |
| 5 | Providing and applying tack coat with Bitument emulsion (RS-I) using emulsion pressure distributor at the rate of 0.20 to 0.25kg. (zero point two two five kilograms) per/ Square metre on the prepared bituminous cleaned with hydraulic broom as per M.O.R.D. technical specifications section No. 503 as per the entire satisfaction and direction of Engineer-In-Charge including carriage of materials within all leads and lifts and other incidentals. The rate including of octroi, royality, Malkana, toll tax, sale tax or other taxes imposed by the government. |
| 6 | Providing and laying bituminous cocrete 25mm (twenty five milimetre) thick with 100-120(one hundred - one hundred twenty )TPH batch type hot mix plant producing an average output of 75 (seventy five) tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG-10 @ 5.5(five pointfive point ) per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tendem rollers to achive the desired compaction as per MORTH specification clause509and as per the directions of Engineer-in-Chargeincluding carriage of materialwithin all leads and lifts and other incidentals and to the entire satisfaction of the Engineer-in-Charge .The rate is including octroi, royality, GST, toll tax, Sale Tax or other taxes imposed by the government. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents