| 1 | Earth work in excavation for foundation of bridge structures (Abutments) in all depths as per drawingand MORTH specification clause 304 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal in all lead and lift including dressing of sides and bottom and back filling in trenches with excavated Suitable materials. All work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion damage to hill side water pollution etc. and to protect stability of hill side rock shall be excavated with chiseling and wedging out rock(where blasting is prohibited). All type of classifications of soil bymanual / mechinical means comprising of ordinary rock, soft rock, / Hard rock as per drawing and technical specfication and as per direction of Engineer -In - Charge including carriage of materials with in all leads and lifts and other incidential.Hauling and stacking ofuseful materialsfor construction at suitable sites and safe disposal of unsuitable cut materials in specified manner triming filling of unevenness blindage and finishing of the brigde siteto specified dimension or as directed by the Engineer-in-Charge.If the foundation of the structure is in an area with stagnant water or water is met with in the excavation due to spring seepage rain and other causes it shall be remove by suitable diversion bailing out or pumping as directed and the area of the foundationshall be kept dry. Any loss to the public or private property during the course of excavation shall be the sole responsibility of the contractor which shall have to be dulycompensated by him in all cases. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST , Labour cess, or other taxes imposed by the Government. |
| 2 | Providing and laying mechanically mixed and vibrated concrete for plain/reinforced concrete inopen foundation for all type of structures complete of plain cement concrete Grade M-10 (ten) nominal mix 1:3:6 (One cement : three sand : six graded crushed stone aggregate) on ground or under water and curing complete including pumping or bailing out water, dewatering removal of slush as required at site which may arise at the time of laying under water complete for all heights/depths including the cost of form work as per drawings and technical specification clause 802, 803, 1202 and 1203 as per direction of Engineer-in-Charge including entire carriage of material within all leads and lifts and other incidentals. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GSTor other taxes imposed by the Government. |
| 3 | Providing and laying Plain / reinforced cement concreteMechanically mixed and vibrated cement concrete M-30 (Thirty)grade design mix using graded/ crushed stone aggregateminimum cement contents not less than 406.67 ( Fourhundred six point six seven) Killogramme per Cubic metre as specfied in the design mixin substructure complete as per drawing and MORTHtechnical specificationsclause 1500,1700 & 2200including the cost of form work, curing completein abutment/dirt wall and bed block of abutment/pier and including entire carriageof material in all leads, lifts and heights as per the entire satisfaction and direction of Engineer-in-charge. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST, Labour cess or other taxes imposed by the Government. |
| 4 | Supplying, fitting and placing HYSD bar reinforcement made ofTATA SAIL, TISCO. in foundation & substructure of bridge complete as per drawings and technical specifications clause 1600 & 2200including the cost of bending, binding, cutting and placing in postion of bars complete and including the cost of winding wire including entire carriageof material in all leads, lifts as per the entire satisfaction and direction of Engineer-in-charge. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST, Labour cess or other taxes imposed by the Government. |
| 5 | Back filling behind abutment , wing walls andreturn walls complete as per drawings and technical specification Clause 1204.3.8. with Granular Materialand as per direction of Engineer-in-Chargeincluding entire carriageof material in all leads, lifts as per the entire satisfaction and direction of Engineer-in-charge and MORTH spection 2100. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. |
| 6 | Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing walls, return walls with 100mm (One hundredmillimeter) diameter AC Pipemade of implet/ supreme extending through the full width of structures with slope of 1(Vertical) : 20 (Horizontal) towards drawing face complete as per drawing and technical specifications clauses 614, 709, 1206.6 including entire carriageof material in all leads, lifts as per the entire satisfaction and direction of Engineer-in-charge . The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. |
| 7 | Providing and laying reinforced Cement concrete gradeM-30 (Thirty)design mixMechanically mixed and vibratedminimum cement contents not less than406.67( Fourhundred six point six seven)Killogramme as per design mix minium cement in Approach slab including reinforcement complete as per drawing and MORTH technical specifications clause 1500,1600,1700, & 2704including the cost of form work and curing completeand entire carriageof material in all leads, lifts as per the entire satisfaction and direction of Engineer-in-charge. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST,labour cessor other taxes imposed by the Government. |
| 8 | Steel work welded in built up section including cutting hoisting fixing in position and applying a priming coat of red oxide paint in trussed steel bridges completeand entire carriageof material in all leads, lifts as per the entire satisfaction and direction of Engineer-in-charge. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST,labour cessor other taxes imposed by the Government. |
| 9 | Special rates on the merit of the individual case shall be worked out for bridge exceeding 45m Hosting stiffing trusses completeand entire carriageof material in all leads, lifts as per the entire satisfaction and direction of Engineer-in-charge. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST,labour cessor other taxes imposed by the Government. |
| 10 | Supplying fitting and fixing in position true to the line and level cast steel rocker roller bearing complete as per the direction of Engineer - in Charge as per drawing No.PW-CE(N) bridge standred 98/133-6confirming to IRC :83 (Pt-I) section IX and Clause 2003 ofMORTH specfication including all incidential charges(unit each = One rocker )completeand entire carriageof material in all leads, lifts as per the entire satisfaction and direction of Engineer-in-charge. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST,labour cessor other taxes imposed by the Government. |
| 11 | Supplyingfitting and fixingin postion true to line and level forged steel roller bearing conforming to IRC:83 (Pt-1) section IX and clause 2003 of MORTH specfications completeand entire carriageof material in all leads, lifts as per the entire satisfaction and direction of Engineer-in-charge. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST,labour cessor other taxes imposed by the Government. |
| 12 | Providing and fixing G.I. pipe 40 mm ( forty millimetre) dia completeand entire carriageof material in all leads, lifts as per the entire satisfaction and direction of Engineer-in-charge. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST,labour cessor other taxes imposed by the Government. |