Design, Supply, Installation, Commissioning, Operation & Maintenance Of Medical Gas Pipeline System ( Mgps ) At Belda Super Speciality Hospital Of West Bengal For 5 Years
Tender Overview
Project Description
Design, Supply, Installation, Commissioning, Operation & Maintenance Of Medical Gas Pipeline System ( Mgps ) At Belda Super Speciality Hospital Of West Bengal For 5 Years
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 25-Oct-2021 | Corrigendum-I | Date | 01-Nov-2021 |
BOQ
| Sl. No. | Item Description |
| 1 | Design, Supply, Installation, Testing, Commissioning of OXYGEN SYSTEM |
| 2 | 2 x 10 size Main manifold complete with middle frame with chain for individual cylinder along with Tail Pipe and Non Return Valve for every cylinder and Isolation Valve, Safety Valve, etc.as required for the complete manifold system as per standards |
| 3 | 2 x 5 size emergency manifold complete with middle frame with chain for individual cylinder along with Tail Pipe and Non Return Valve for every cylinder and Isolation Valve, Safety Valve, etc.as required for the complete manifold system as per standards |
| 4 | Fully Automatic control panel Indigenousfor Oxygen Having a constant delivery flow capacity of1500 lpm to 2000 lpm or above at 4.2 bar pressure as perStandards |
| 5 | Surface/panel/pendant mounted front loading double lock Oxygen outlets with matching Adapters (BS type) as per standards |
| 6 | Oxygen Flowmeter & Humidifier Bottle with matching adapters: Back Pressure Compensated Flow meter within a range of 0-15 LPM where 0-5 LPM should be with expanded scale. Humidifier bottle should be made of unbreakable polycarbonate materials and autoclavable at 121 degree Centigrade (to be supplied along with required low pressure tubing and face mask) as per standards |
| 7 | H.P. tubing having anti static core white color5mtrs with kit conversion for Oxygen |
| 8 | Design, Supply, Installation, Testing, Commissioning of NITROUS OXIDE SYSTEM |
| 9 | 2 x 2 size manifold (Primary & Secondary supply) complete with middle frame with chain for individual cylinder along with Non Return Valves for every cylinder, Safety Valve, etc. as required for the complete manifold system as per standards. |
| 10 | Fully Automatic control panel Indigenousfor Nitrous Oxide Having a constant delivery flow capacity of1000 lpm or above at 4.2 bar pressure as perStandards |
| 11 | 2 cylinder Emergency Nitrous oxide arrangement using a high flowdouble stage Regulator withgauges complete with middle frame with chain for individual cylinder along with Non Return Valves for every cylinder as per standards |
| 12 | Surface/panel/pendant mounted front loading double lock Nitrous Oxide outlets with matching Adapters (BS type) as per standards |
| 13 | H.P. tubing having antistatic core Blue color 5 mtrs. with Kit conversion for Nitrous Oxideas per ISO Standards |
| 14 | Design, Supply, Installation, Testing, Commissioning of COMPRESSED AIR SYSTEM |
| 15 | Compressed Air System complete with 3 nos. of non-lubricated, Reciprocating each of 15 HP Motor with 57 cfm capacity at 8.5Kg/cm2 pressure with Isolation Valve for each compressor, 2 nos. Air dryer with by-pass valve arrangement, Duplex Pressure Reducing Unit each for Air 4 bar & 7 Bar valve arrangement Flexible High pressure SS Hose for each compressor NRV for each compressor, 1 no. Air Receiver of 1500 litre capacity with Safety Valve and interconnecting pipelines, Pressure Gauge with Valve Arrangement in the Air Receiver Valve – Upstream of Air Receiver Automatic Drain Arrangement for air receivers Air Compressor By pass line Pressure Gauge with Valve arrangement in Main line Isolation Valve in the main line |
| 16 | Supply, Installation, Testing and commissioning of 4-stage air filtration system (suitable for 15 HP Compressor) as per ISO 8573.1. |
| 17 | Surface/panel/pendant mounted front loading double lock Medical Air-4 bar Outlets with matching Adapters (BS type) as per standards |
| 18 | Surface/panel/pendant mounted front loading double lock Surgical Air-7 bar Outlets with matching Adapters (BS type) as per standards |
| 19 | HP colour coded black Tubing having anti static core as per ISO Standards |
| 20 | Design, Supply, Installation, Testing, Commissioning of VACUUM SYSTEM |
| 21 | Vacuum Central System Complete with 3 nos. Vacuum Pumps each having 149 cfm PD withFilter, interconnecting pipes, NRV, auto switch gear assy., exhaust silencer And Receiver – 1 No. 2000 liters, 2 nos. Bactria Filters, oil trap filter, etc. NRV for each Vacuum Pump Isolation Valve for each Vacuum Pump Valve - Upstream of Vacuum Receiver Vacuum Drain valve with flask arrangement Filters for each vacuum pump Silencer for each vacuum pump. |
| 22 | Surface/panel/pendant mounted front loading double lock Vacuum Outlets (BS Type) with matching Adapters |
| 23 | Ward vacuum Unit : It shall include vacuum regulator along with 0-760 mm of Hg vacuum gauge,600 ml capacity reusable poly carbonatecollection bottle with overflow safety trap andautoclavable at 121 degree Centigrade with plastic slide wall mounted type (to be supplied along with required low pressure tubing with catheter). |
| 24 | Theatre Vacuum Unit: It shall be trolley mounted. The unit shall include one regulator along with 0-760 mm of Hg vacuum gauge mounted on the trolley stand, having two reusable collection bottles each of 2000 ml capacity and made of unbreakable polycarbonate materials, autoclavable at 121° Centigrade, having over flow safety trap, mounted on the base of trolley unit made of aluminium along with castor wheels and connected with regulator & low pressure tube inter-connections (along with required low pressure tubing with catheter). |
| 25 | Low Pressure Tubing having anti static core as per ISO Standards |
| 26 | High Pressure Tubing having anti static core as per ISO Standards |
| 27 | Supply, Installation, Testing and commissioning of Combined Electrical Control Panel for VacuumSystem (149 cfm each) & Compressed Air system (15HP each) with Triplex/Triplex/ Cascading/ Sequencing facilities and complete with plant Room wiring . |
| 28 | Design, Supply, Installation, Testing, Commissioning of Distribution Copper Pipe |
| 29 | 12 mm OD x 0.7 mm thick copper pipe |
| 30 | 15 mm OD x 0.9 mm thick copper pipe |
| 31 | 22 mm OD x 0.9 mm thick copper pipe |
| 32 | 28 mm OD x 0.9 mm thick copper pipe |
| 33 | 42 mm OD x 1.2 mm thick copper pipe |
| 34 | 54 mm OD x 1.2 mm thick copper pipe |
| 35 | Design, Supply, Installation, Testing, Commissioning of Isolation Valve |
| 36 | Isolation Valve 15 mm |
| 37 | Isolation Valve 22 mm |
| 38 | Isolation Valve 28 mm |
| 39 | Isolation Valve 42 mm |
| 40 | Isolation Valve 54 mm |
| 41 | Design, Supply, Installation, Testing, Commissioning of Area Valve Service Unit |
| 42 | 2gas valve box configuration with size 15 O2, 22 VAC |
| 43 | 3 gas valve box configuration with size 15 O2, 15 MA4, 22 VAC |
| 44 | 4 gas valve box configuration with size 15 O2, 15 N2O, 15 MA4, 22 VAC |
| 45 | 5 gas valve box configuration with size 15 O2, 15 N2O, 15 MA4, 15 SA7, 22 VAC |
| 46 | Design, Supply, Installation, Testing, Commissioning of Medical Gas Digital Area Alarm System as perstandards |
| 47 | 2 service alarm configuration for O2 and VAC |
| 48 | 3service alarm configuration for O2,MA4,VAC |
| 49 | 4 service alarm configuration for O2, N2O, MA4, VAC |
| 50 | 5 service alarm configuration for O2, N2O, MA4, SA7, VAC |
| 51 | Design, Supply, Installation, Testing, Commissioning of Ceiling Pendants |
| 52 | Ceiling Anesthetist Pendants for OT: Supply, Installation, Testing and commissioning of Single Arm Ceiling Pendant with8 nos. of Gas & Vacuum Outlets (2-Oxygen, 2-N2O, 2-Air 4 bar, 2-Vac) |
| 53 | Ceiling Surgeon Pendants for OT: Supply, Installation, Testing and commissioning of Single Arm Ceiling Pendant with8 nos. of Gas & Vacuum Outlets (2-Oxygen, 1-N2O, 1-Air 4 bar, 2-Air 7 bar, 2-Vac) |
| 54 | Testing, Commissioning of Distribution Copper Pipe |
| 55 | 12 mm OD x 0.7 mm thick copper pipe |
| 56 | 15 mm OD x 0.9 mm thick copper pipe |
| 57 | 22 mm OD x 0.9 mm thick copper pipe |
| 58 | 28 mm OD x 0.9 mm thick copper pipe |
| 59 | 42 mm OD x 1.2 mm thick copper pipe |
| 60 | Testing, Commissioning of Isolation Valve |
| 61 | Isolation Valve 15 mm |
| 62 | Isolation Valve 22 mm |
| 63 | Isolation Valve 28 mm |
| 64 | Testing, Commissioning of Area Valve Service Unit |
| 65 | 2gas valve box configuration with size 15 O2, 22 VAC |
| 66 | 3 gas valve box configuration with size 15 O2, 15 MA4, 22 VAC |
| 67 | 5 gas valve box configuration with size 15 O2, 15 N2O, 15 MA4, 15 SA7, 22 VAC |
| 68 | Installation, Testing, Commissioning of Distribution Copper Pipe |
| 69 | 12 mm OD x 0.7 mm thick copper pipe |
| 70 | 15 mm OD x 0.9 mm thick copper pipe |
| 71 | 22 mm OD x 0.9 mm thick copper pipe |
| 72 | 28 mm OD x 0.9 mm thick copper pipe |
| 73 | 42 mm OD x 1.2 mm thick copper pipe |
| 74 | 54 mm OD x 1.2 mm thick copper pipe |
| 75 | Installation, Testing, Commissioning of Isolation Valve |
| 76 | Isolation Valve 15 mm |
| 77 | Isolation Valve 22 mm |
| 78 | Isolation Valve 28 mm |
| 79 | Isolation Valve 42 mm |
| 80 | Isolation Valve 54 mm |
| 81 | Installation, Testing, Commissioning of Area Valve Service Unit |
| 82 | 2gas valve box configuration with size 15 O2, 22 VAC |
| 83 | 3 gas valve box configuration with size 15 O2, 15 MA4, 22 VAC |
| 84 | 4 gas valve box configuration with size 15 O2, 15 N2O, 15 MA4, 22 VAC |
| 85 | 5 gas valve box configuration with size 15 O2, 15 N2O, 15 MA4, 15 SA7, 22 VAC |
| 86 | Installation, Testing, Commissioning of Medical Gas Digital Area Alarm System as perstandards |
| 87 | 2 service alarm configuration for O2 and VAC |
| 88 | 3service alarm configuration for O2,MA4,VAC |
| 89 | 4 service alarm configuration for O2, N2O, MA4, VAC |
| 90 | 5 service alarm configuration for O2, N2O, MA4, SA7, VAC |
| 91 | Operation & Comprehensive Maintenance for entire MGPS charges |
| 92 | Operation & Comprehensive Maintenance charges for the 1st Year |
| 93 | O&M charges for Year 2 |
| 94 | O&M charges for Year 3 |
| 95 | O&M charges for Year 4 |
| 96 | O&M charges for Year 5 |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender