Supply Of Power Transformer As Per Technical Specifications For Numaligarh Refinery Limited Supply Of Power Transformer As Per Technical Specifications For Numaligarh Refinery Limited , Supply Of Power Transformers For Nrep Project , Design, Detail Engineering, Procurement, Manufacturing, Inspection, Factory Acceptance Testing (Fat), Packing, Forwarding, Supply, Site Acceptance Testing (Sat) And Commissioning Of Power Transformers Including Condition Monitoring Sensors With Its Analysers/ Modules, Partial Discharge Monitoring System & Online Moisture Removalsystem Etc. Testing & Inspecition, Transportation, Route Survey (If Required) And Supply Till Site Including Special Tools & Tackles, Commissioning Spares & Consumables & Mandatory Spares (Charges To Be Quoted Sepately At Boq Column No. 26) For Power Transformers Tag No. - 1U64-Ss-14-Tr-210A/B (2 Nos.) To Be Installed At Numaligarh Refinery Limited(Nrl), Assam As Specified In Material Requisition.Rating - 25/31.5 Mva, 33/ 6.9 Kv, Onan/Onaf, Dyn11, Z=10% (With No Negative Tol.)At 25 Mva, Octc Range ±5% In Steps Of 2.5% , Design, Detail Engineering, Procurement, Manufacturing, Inspection, Factory Acceptance Testing (Fat), Packing, Forwarding, Supply, Site Acceptance Testing (Sat) And Commissioning Of Power Transformers Including Condition Monitoring Sensors With Its Analysers/ Modules, Partial Discharge Monitoring System & Online Moisture Removalsystem Etc. Testing & Inspecition, Transportation, Route Survey (If Required) And Supply Till Site Including Special Tools & Tackles, Commissioning Spares & Consumables & Mandatory Spares (Charges To Be Quoted Sepately At Boq Column No. 26) For Power Transformers Tag No. - 1U64-Ss-14-Tr-210A/B (2 Nos.) To Be Installed At Numaligarh Refinery Limited(Nrl), Assam As Specified In Material Requisition.Rating - 31.5/40 Mva, 33/ 6.9 Kv, Onan/Onaf, Dyn11, Z=10% (With No Negative Tol.) At 31.5 Mva, Octc Range ±5% In Steps Of 2.5% , Charges For Site Supervision Of Erection / Installation Andtesting For Supply Of Power Transformers For Nrep Project , Per Diem Charges For Upto 8 Hours Work On Normal Working Days. , Overtime Rate / Hour Beyond Normal 8 Hours Work On Normal Working Days. , Overtime Rate / Hour For Work On Weekly Off Days / Holidays (As Applicable To Refinery Site).