Rehabilitation Plantation Limited-RPL has published Rpl / Punalur / Supply And Fixing L.T Air Circuit Breakers, Ct-Pt Unit And Tod Meter In Factory Complex Replacement Of Old Lt Air Circuit Breakers Ct Pt Unit Tod Meter. Submission Date for this Tender is 13-10-2021. Air Circuit Breaker Tenders in Factory complex Kulathupuzha estate Kerala. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Supply & fixing L-T Air Circuit Breakers |
2 | Supply of L&T make 1250A 4P MDO U-Power ACB with MTX1.5 Release for KSEB incomer for MSB Panel and necessary shunt release, interlock keyswith Generator SFU etc(To be set at 800A) |
3 | Dismantling of 3P 1250A English Electricmake ACB replacing the same with L&T 1250A 4P U-Power ACB after modification and reconnecting same capacity copper flat, door modification, control wiring, testing and commissioning etc as required |
4 | Suppy of L&T make 800A 3P MDO U-Power ACB with MTX1.5 Release for Crumb Rubber Factory-Outgoing from MSB Panel (To be set at 700A) |
5 | Dismantling of 3P 630A English electric make ACB replacing the same with L&T 800A 3P U-Power ACB after modification and reconnecting same capacity copper flat, door modification, control wiring, testing and commissioning etc as required |
6 | Supply & fixing CT-PT unit and TOD meter |
7 | Dismantling of existing 11KV CT-PT unit from the existing position, Supply, testing,erecton and commissioningof new 11KV CT -PT unit of the following Specification to the 11KV Yard Structure,after getting test certificate and necessary approval from TMR Division, KSEB - 11KV Outdoor type, 20/5A, Accuracy Class- 0.2S Special Class |
8 | Dismantling of existing TOD meter from the existing position, Supply, testing,erecton and commissioningof new TOD meter DLMS type, 3 Phase 4 wire suitable for KSEB HT metering in the Metering Box, after getting test certificate and necessary approval from TMR Division, KSEB |
9 | Getting approval with necessary documentation work from KSEB Authorities for replacing the CT-PT unit and TOD meter including reduction of the Contract Demand from 400KVA to 320KVA. |
10 | Getting approval with necessary documentation work from Electrical Inspectorate for replacing the CT-PT Unit, TOD meter etc. and revising the Contract Demand from 400KVA to 320KVA. |