| 1 | PART A ROAD WORK :- Construction of embankment with approved material obtained from available land as permitted and approved by Engineer-in-Charge and as per Technical Specification Clause 301.3.3.4.1, with all lifts and and leads, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 as per Technical Specification clause 301.5 PWD SOR S.I.No. 253/2020-21 |
| 2 | Catage of earth from5 Km distance including loading unloading excluding Royalty all complete. S.I. No. 231(a)/2020-21 |
| 3 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :5.1.2 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone.(Analyses Attached)) |
| 4 | Mild steel or Iron in plain work such as reinforced concrete or reinforcement brick work (When not wrought to included in an overall rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorised overlapping shall be measured upto floor two level.UPPWD S.O.R. S.I. No.504/2020-21 |
| 5 | PART B DRAINWORK :-Dismantling brick work or stone work in lime or cement mortar and including stacking of materials as directed by Engineer-in-charge within a distance of 60 meters (200 feet).(PWD SOR S.I.No.692/2020-21) |
| 6 | Deduct Bricks for to be used (CH. 1 item No. 1 /2020-21) |
| 7 | Deduct Brick Bats for to be used (CH. 1 item No. 2 c/2020-21) |
| 8 | Dismantling reinforcement cement concrete or reinforcement brick work including stacking of materials as directed by Engineer-in-charge within a distance of 60 meters (200 feet).PWD SOR S.I. No. 694/2020-21 |
| 9 | Earth work in excavation for Structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 50 m, dressing of sides and bottom and back filling in trenches with excavated suitable material. PWD SOR S.I.No. 251/2020-21 |
| 10 | P/L cement concrete1 :6 :12 (1 cement: 6 F sand: 12 graded brick ballast 40 mm nominal size) including supply of all materials, labour & T&P etc. reqd. for proper completion of work as per direction of E/I. (PWD SI No.273/2020-21 |
| 11 | First Class brick work in 1:4 cement & and coarse sand Mortar in foundation and plinth including supply of all materials, labour and tools & plants etc reqd for proper completion of the work. (PWD SI No.305b/ 2020-21 |
| 12 | 12 mm. thick plaster With 1:3 cement & and coarse sand Mortar.. UPPWD S.O.R. S.I. No.583/2020-21 |
| 13 | R.C.C. works with cement approved coarse sand and 2 cm. (3/4\") gauge approved stone ballast in the proportion 1:1.5:3 (1 cement:4.5 aggregate) inSlab excluding supply of reinforcement and its bending the same with 24 B WG binding wire and necessary centering and shuttering etc, and also including supply of all materials labour and tools and plants etc required for proper completion of the works. Strength of the concrete shall not be less than M-200.SOR s.I. No. 284/2020-21 {Add diff. of Cement {(8.29-6.66)x260=423.80+8190.00=8613.80} |
| 14 | Mild steel or Iron in plain work such as reinforced concrete or reinforcement brick work (When not wrought to included in an overall rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorised overlapping shall be measured upto floor two level.UPPWD S.O.R. S.I. No.504/2020-21 |
| 15 | Providing and laying in cement concrete 4:2:1 of not less than strength of M150 stone ballast (20 mm. nominal size) :2 approved coarse sand:1 cement and curing complete, including cost of formwork in foundation and floors.UPPWD S.O.R. S.I. No.279(b)/2020-21 |