| 1 | Clearing and grubbing Canal land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth upto 300 mm,removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 meters including removal and disposal of top organic soil not exceeding 150 mm in thickness including cost, carriage, royality, taxes of all materials, labour, cess and T&P required for the work etc. complete as per direction of the Engineer-in-Charge. |
| 2 | Providing stone Rip-Rap to the slopes of earth dam & dyke with quarried and blasted granite stone boulder of size 0.30M and above including dumping on slopes filling intrestices with small stones and wadges and packing surface to proper line and levels including fixing wave breakers complete with all leads & lifts including all cost, carriage, lead, lift, delift, T & P, cess, taxes and royalty etc. complete as directed by Engineer-In-Charge.(No deduction towards voids in finished section.) |
| 3 | Collecting,Supplying and Dumping armoury stones in rip-rap in launching appron,nose of spur including surface packing and fixing wave breakers using hard granite stone not less than 1.00MT placing in position by crane etc. complete including cost,carriage,royalty,T&P, labour cess and all other taxes withall leads, lifts and delifts etc. complete as per direction of Engineering-In-Charge. (1/6 th volume will be deducted towards voids) |
| 4 | Excavation of any approved type of soils inapproved borrow areas by mechanical means loading into and transportation by mechanical means and unloading the soils with all leads, lifts & delifts on properly prepared and scientifically approved surface, including spreading and leveling the earth in 22.5 cm layers to make ready for watering and compaction with Vibro Road Roller and dozers but excluding watering and compaction in dams and dykes for all heights including construction, maintenance, watering and lighting of haul road and borrow area and including all cost, Royalty, conveyance, taxes of all materials, machineary, labour & labour cess, T&P etc. complete as per the direction of Engineer-in-Charge. (Measurement of the fill to be taken on the finished compacted level section under OMC condition.) |
| 5 | Providing and watering earth work up to OMC condition and compaction by sheep foot rollers / vibratory roller and dozers in layers not exceeding 22.5cm to 95% dry density including mobilization, demobilization and hire and running charges of all the machineries, T&P, taxes, royality, cess, labourfor all heights of embankment etc. complete as per specification anddirection of Engineer-in-Charge. (Measurement to be taken on the finished compacted section of the fill under OMC condition) |
| 6 | Providing and placing in position Cement Concrete M20 grade with 20mm down graded crushed granite coarse aggregate of approved quality mixed in batching and mixing plant/ concrete mixer, transporting the mixed concrete manually or by mechanical means for laying in proper level and grade on approved surface with cost of all materials, royalties, taxes, labour and hire & running charges of all machineries, T&P and cess etc. including vibrating, finishing, curing, and clearing the site with all leads, lifts and delifts, mobilization and demobilization, site illumination for all materials and dewatering if necessary to complete the work as per approved drawings and specifications and as directed by the Engineer-in-charge. |
| 7 | Providing, straightening, cutting, bending, binding and tying the grills, laying and placing in position the uncoated HYSD (Fe-415 or 500) grade reinforcement bars including lapping (or welding for higher diameter) of bars where necessary with cost, conveyance, royalty, taxes, labour cess of all reinforcement bars, binding wire 18 to 20 gauge, hire and running charges of equipments required for the work with all leads, lifts and delifts, handling & rehandling to complete as per approved drawings and specifications and dewatering where necessary and as directed by the Engineer-in-charge. |
| 8 | Rigid and smooth centering & shuttering for R.C.C works including false works and dismentalling them after casting including cost, conveyance, royalty, cess and taxes of all materials with cost of conveyance of all dismentalling and disposing debries clear of work site complete as per drawing, specification and direction of Engineer-in-Charge. |