| 1 | Loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 2 | Loading HT \"A\" type pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 3 | Loading LT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 4 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading. |
| 5 | Dismantling (without damage) one 11kV PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. |
| 6 | Drilling hole of various sizes on existing Channel/Cross Arm. |
| 7 | Fitting and erecting one HT PSC Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads. |
| 8 | Fitting and erecting one HT \"A\" type Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads. |
| 9 | Additional rate for providing one disc set on any type of HT pole for making cut point. |
| 10 | Fitting and erecting one HT DP using PSC pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads. |
| 11 | Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit. |
| 12 | Fitting and providing one Strut using HT PSC pole incl. digging & back filling pit. |
| 13 | Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole incl. digging & back filling pits. |
| 14 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite. |
| 15 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Soft Rock. |
| 16 | Stringing of one km 11kV line with ACSR Raccoon (3 conductors) incl. cutting and removing tree branches wherever necessary. |
| 17 | Fitting 5 channel cross arms, AB switch, DO fuse, LA, HT & LT connections on existing DP, 3 LT fuses. |
| 18 | Providing one Earth using earth pipe incl. digging separate pit at standard distance away from the pole/structure & backfilling. |
| 19 | Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling. |
| 20 | Fitting one set AB switch and giving connection |
| 21 | Conveyance of one km 11kV line materials from section store/stacking place to the work site (excluding poles). |
| 22 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole incl. conveyance of materials. |
| 23 | Fitting one Additional 2.4m/3m Channel cross arm (75x40x6mm), in existing 11kV DP incl. conveyance of materials. |
| 24 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. |
| 25 | Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. |
| 26 | Dismantling one section fuse |
| 27 | Reshackling one span LT Sph 2 wire OH line, replacing insulators, tightening stay, cutting tree branches incl. conveyance. |
| 28 | Reshackling one span LT 3ph 4 wire OH line, replacing insulators, tightening stay, cutting tree branches incl. conveyance. |
| 29 | Transferring LT Sph 2/3 wire OH line to newly erected HT/LT pole and refitting all items to the new pole. |
| 30 | Transferring LT 3ph 4/5 wire OH line to newly erected HT/LT pole and refitting all items to the new pole. |
| 31 | Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion. |
| 32 | Dismantling and reconnecting 3ph service connection from the OH line incl. lowering down the WP portion. |
| 33 | Erecting one LT PSC Pole in position incl. digging & back filling pit. |
| 34 | Providing Stay for LT poles incl. digging & back filling pit. |
| 35 | Additional rate for excavation of one Pit for LT Pole/LT Stay in Laterite. |
| 36 | Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt&nut etc. |
| 37 | Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole and reconnecting. |
| 38 | Cutting trees beyond 30cm but upto and incl. 60cm girth, cutting branches, removing root completely and stacking (where space for falling trees is not enough). |
| 39 | Cutting trees beyond 60cm but upto and incl. 120cm girth, cutting branches, removing root completely and stacking (where space for falling trees is not enough). |
| 40 | Providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of all material (as per specification). |
| 41 | Providing Transformer fencing , using 50x50x6mm Angle iron, 40 x 6 mm MS flat and 8 mm MS rod as specified, incl cost of transportation & foundation |
| 42 | Providing yard metalling with 6mm & 40mm thick blue metal as specified after constructing a curb wall. |
| 43 | Plastering with CM 1:6, 12mm thick including cost of all materials,conveyance,labour excludedand measured charges etc.complete |