Ministry Of Road Transport And Highways has published Consultancy Services For Authority Engineer For Supervision Of Construction Of Sungal Tunnel ( Length 2.79Km ) And Its Approaches On Nh-144A Through Bro, Project Sampark, In The Ut Of Jammu Kashmir To Be Implemented On Epc Mode Consultancy Services Fo. Submission Date for this Tender is 25-10-2021. Consultancy Service Tenders in New Delhi Delhi. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 06-Oct-2021 | Pre bid meeting Notice | Other | 25-10-2021 |
2 | 13-Oct-2021 | Corrigendum I | Other | 25-10-2021 |
3 | 20-Oct-2021 | Corrigendum2 | Other | 25-10-2021 |
4 | 22-Oct-2021 | Corrigendum 3 | Other | 25-10-2021 |
Sl. No. | Item Description |
1 | Remuneration for Professional Staff (inclusive of per Diem allowance) |
2 | Team Leader cum Senior Tunnel Expert |
3 | Resident Engineer cum Excavation Specialist |
4 | Senior Geotechnical Expert |
5 | Tunnel Designer Engineer |
6 | Tunnel Safety Expert |
7 | Senior Geologist |
8 | Senior Contract Specialist |
9 | Sub-Professional Staff |
10 | Tunnel Ventilation Cum E&M Expert |
11 | Bridge/Structure Engineer |
12 | Instrumentation & Contract Expert (SCADA) |
13 | Tunnel Engineer (2 Nos * 30) |
14 | Tunnel Excavation Expert (1 No.) |
15 | Tunnel Lining (1 No.) |
16 | Geologist (1 No.) |
17 | Quantity Surveyor (1 No.) |
18 | Assistant Highway Engineer |
19 | Assistant Bridge/Structure Engineer |
20 | Assistant Quality cum material Engineer (1 No.) |
21 | Safety Engineer |
22 | Environmental Engineer |
23 | Survey Engineer (1 No.) |
24 | CAD Expert (01 No.) |
25 | Lab Technician (01 Nos.) |
26 | Support Staff (inclusive of per diem allowance) |
27 | Office Manager |
28 | Accountant cum Cashier (01 No.) |
29 | Steno cum Computer Operator (01 No.) |
30 | Office Boy |
31 | Transportation (Fixed Costs) |
32 | Innova or equivalent not more than 2 years old) (1*36 (Construction Period) + 1*12 (DLP)) =48 Rate per month |
33 | Scorpio or equivalent 4 x 4 vehicles (not more than 2 years old) (1*36 (ConstructionPeriod)) |
34 | Bolero or equivalent 4 x 4 vehicles (not more than 2 years old) (1*36 (Construction Period) + 1*120 (DLP)) =156 months Rate per month |
35 | Duty Travel to Site(Fixed Costs): Professional and Sub-Professional Staff. |
36 | The employer may require the Key Personnel to visit the Employer’s HQ office or any other office as per direction. The quoted amount should include travel fare for 80 round trip per key personnel to Employer’s Head Office or 2 working days (including Air fare, Food, Boarding & Lodging charges, TA/DA, Taxi, etc. Complete). |
37 | Office Rent (Fixed Costs) Minimum200 sq m area of office shall be rented The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc. (Rate per Month) |
38 | During Construction period |
39 | During Maintenance /DLP period |
40 | Office Supplies, Utilities and Communication (Fixed Costs), Rate per Month |
41 | Office Supplies (1*36+1*120)=156 |
42 | Drafting Supplies (1*36+1*120)=156 |
43 | Computer Running Costs (1*36+1*120)=156 |
44 | Domestic and International Communication (1*36+1*120)=156 |
45 | The cost shall includerentalcharges toward sall such furniture and equipmentas required for proper functioning of office. Office furniture shall include executivetables, chairs, visitorchairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone(2external & 10internallines),photocopier(15ppm,12000copiesper month with A3 & A4 input) fax machine, PCs(5 No., Intel Core 2 Duo E8300, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD- 250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows Vista Business, pre-loaded antivirus etc.), laser printers (2 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc., Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc. |
46 | During Construction period |
47 | During Maintenance /DLP period |
48 | Reports and Document Printing ( rate as per copy) |
49 | Monthly reports (Design and Construction) |
50 | Half yearly Reports |
51 | Various others reports as provided in the Concession Agreement such as Completion Report |
52 | Road Survey Equipment, Rate per Km |
53 | Surface defects detection and roughness measurement using Network Survey Vehicle |
54 | Pavement strength measurement using FWD |
55 | Road signs inspection using Retro Reflectometer |
56 | Contigencies A fixed amount of Indian Rupees ONE MILLION shall be included in the Financial Proposal. (Fixed as Rs. 10,00,000) |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail