Provision Of 4 Nos. Tubewells With Delivery Line At Gurunanak Park, Opposite Councilor Office, Tigaon Road Park And Shivaji Park Hbc Sector-3, Ballabgarh, Ward No.35. Provision Of 4 Nos. Tubewells With Delivery Line At Gurunanak Park, Opposite Counci
Tender Overview
Project Description
Provision Of 4 Nos. Tubewells With Delivery Line At Gurunanak Park, Opposite Councilor Office, Tigaon Road Park And Shivaji Park Hbc Sector-3, Ballabgarh, Ward No.35. Provision Of 4 Nos. Tubewells With Delivery Line At Gurunanak Park, Opposite Councilor Office, Tigaon Road Park And Shivaji Park Hbc Sector-3, Ballabgarh, Ward No.35.
BOQ
| Sl. No. | Item Description |
| 1 | Boring of 10” diameter bore by manual Operated Complete in all respect0 to 30.49 = 30.49 mtr |
| 2 | Boring of 10” diameter bore by manual Operated Complete in all respect30.79 to 76.22= 45.43 mtr |
| 3 | Supply of 8” PVC pipe 6 kg/ cm² work progress. |
| 4 | Lowering of 8” PVC pipe. |
| 5 | Making of PVC 8” pipe filter including Binding by rope/filter cloth. |
| 6 | P / fixing of screw. |
| 7 | P / Fixing of cement solvent. |
| 8 | Supply and fixing of 10 H.P submersible Motor Pump 10 stage KSB / CRI make. |
| 9 | -S/ Fixing of M.S supporting clamp 2”. |
| 10 | -Providing and fixing of Panel Board 10 HP CRI/KSB/ LT/LK/ C&S with 63 amp main switch , Amp meter 0-100 amp Havells , volt meterHavells , Power capacitor ISI Mark, Single phase preventer & automation system with hut MS hut 4’x4’x1’ with 2mm thick MS sheet 50mmx50mmx6mm Angle total height 6’ grouted in ground with CC). |
| 11 | -S / Fixing C.I Tee flanged 3”x3”x3” |
| 12 | -S / fixing of CI duck foot bend 4”x3\" A/F |
| 13 | -S/ Fixing 3” C.I Bend AF3x10kg |
| 14 | -S/Fixing of MS Bore cap 8”with wall and plate thickness 6 mm. |
| 15 | -Supply of PVC Tee 6”x6”x4” |
| 16 | -P/F of 100 mm CI tail piece (14 kg wt.) |
| 17 | -P/F 7.5KW electric metre connection with 3 phase energy metre from DHBVN at site in favour of MCF including i.e. Connection Security, File Process Charges, Connection Charges, Inspection Fee, Test Report Fee, Other Expenses and installation of 1 Nos.approved energy metre with 2KVAR Capacitor & required Cable. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender