Sales : +91-777 804 8217
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 21-12-2021 | Corrigendum-VIII | Date | 31-12-2021 |
| 2 | 09-12-2021 | Corrigendum-VII | Date | 21-12-2021 |
| 3 | 30-11-2021 | Corrigendum-VI | Date | 09-12-2021 |
| 4 | 19-11-2021 | Corrigendum-V | Date | 30-11-2021 |
| 5 | 10-11-2021 | Corrigendum-IV | Date | 22-11-2021 |
| 6 | 01-11-2021 | Corrigendum-III | Date | 10-11-2021 |
| 7 | 21-10-2021 | Corrigendum-II | Date | 30-10-2021 |
| 8 | 07-10-2021 | Corrigendum-I | Date | 21-10-2021 |
| Sl. No. | Item Description |
| 1 | CSW-IPS1-SERVICE-ITC |
| 2 | 3 MECHANICAL |
| 3 | MLPU Installation(Motor Driven): Taking delivery of mainline pumping units having electrical motor, horizontal centrifugal pump (to be mounted on a common base plate ), Local control panel, Hydraulic coupling and other auxiliaries and accessories, grouting materials etcfrom designated storage lo cation within the Pump Station, shifting andplacing the equipments in the pre-constructed foundation, carrying out levelling and g routing, aligning the equipment, assembling together of all sub-assemblies, auxiliaries, mountings, fittings, interconnecting pipingetc., providing assistance for carrying out trial run of motor on no load, coupling the electrical motor with the pump, making fina l alignment, checking and testing of the complete pumping unit and completing the work in all respects in accordance with the drawin gs, manufacturer\"s installation instructions, technical specifications and as per the instruction of the Site Engineer / EIC. Note: 1. The auxiliaries and mountings shall include but not limited to pipe works etc. 2. Electrical & Instrumentation connections are not included in this item. 3. Weight of equipment is indicative only, Payment shall be done based on actual weight of equipment. 4. Grouting material shall be supplied by owner. Mainline Pumping Units Installation Note: Weight of equipment is indicative only, Payment shall be done based on actual weight of equipment Approx weight of one unit is30 Ton_A |
| 4 | Vertical Submersible type Motor Driven Water filling Pumping Unit (Q=30 KL/hr ,H= 40 MCL, Approx UnitWeight = 1 MTx1 No. = 2 MT) Taking delivery of the following pumping units with electrical motors from designated location within station premises/centralized w arehouse(details given in SCC), shifting/transporting to site, placing over Tank Nozzle, assembling together all sub-assemblies, ali gnment, grouting, levelling, checking, providing assistance for taking trial run of electrical motor on no-load, coupling the pump &motor, carrying out the trial run of the complete unit, testing, making final alignment and completework in all respects in accor dance with the relevant drawings, manufacturer\"s installation instruction, specifications and instructions of Site Engineer / EIC. Note: Weight of equipment is indicative only, Payment shall be done based on actual weight of equipment Approx weight of one unit is1 Ton_ |
| 5 | Motor Driven F/F Jockey Pump Unit Installation: Taking delivery of motor driven Fire FightingPumping unit from designated storage location within the pump station/centralized war ehouse(details given in SCC), shifting andplacing the equipments on the pre-constructed foundation, levelling, grouting and aligni ng the equipment, assembling together of all sub-assemblies, auxiliaries, mountings, fittings, interconnecting piping etc., carryingout trial run of complete unit, making final alignment, checking and testing of the complete unit and completing the work in all re spects in accordance with the specification, drawings, manufacturer\"s installation instructions, technical specifications and as perthe instruction of the Site Engineer / EIC. Note: 1. The auxiliaries and mountings shall include but not limited to pipe works etc. 2. Electrical & Instrumentation connections are not included in this item.Jockey Pump Unit with Q-10 Kls/Hr, H-88 MCLApprox. Weight 0.5MT x 2 Nos. = 1 MT_ |
| 6 | Engine Driven F/F Pumping Units Installation: Taking delivery of engine driven Fire FightingPumping unit from designated storage location within the pump station, shifting andplacing the equipments on the pre-constructed foundation, levelling, grouting and aligning the equipment, assembling together of al l sub-assemblies, auxiliaries, mountings, fittings, interconnecting piping etc., carrying out trial run of complete unit, making fin al alignment, checking and testing of the complete unit and completing the work in all respects in accordance with the specification , drawings, manufacturer\"s installation instructions, technical specifications and as per the instruction of the Site Engineer / EIC . Note: 1. The auxiliaries and mountings shall include but not limited to pipe works etc. 2. Electrical & Instrumentation connections are not included in this item. Fire fighting Pumping Unit withQ= 450 Kl/Hr.,H= 120 MCL, Approx. weight-7.5 MT x 3Nos. =22.5 MT_A |
| 7 | Diesel Unloading Pump unit Installation: Taking delivery of motor driven Diesel Unloading Pumping unit from designated storage location within the pump station, shifting and placing the equipments on the pre-constructed foundation, levelling, grouting and aligning the equipment, assembling together of a ll sub-assemblies, auxiliaries, mountings, fittings, interconnecting piping etc., carrying out trial run of complete unit, making fi nal alignment, checking and testing of the complete unit and completing the work in all respects in accordance with the specificatio n, drawings, manufacturer\"s installation instructions, technical specifications and as per the instruction of the Site Engineer / EI C. Note: 1. The auxiliaries and mountings shall include but not limited to pipe works etc. 2. Electrical & Instrumentation connections are not included in this item. Motor Driven Diesel Unloading Pump (Q=8 KL/hr ,H= 30 MCL) |
| 8 | Above Ground Equipments Installation: Taking delivery and transportation of equipments from designated storage location within the pump station/Centralized warehouse loca tion within the state (Details of warehouse given in SCC) and placing on pre-constructed foundations, assembling together all sub-as semblies, levelling, alignment, grouting, cleaning and flushing by water, draining, checking, testing, dressing and making good of t he foundation and completing the work in allrespects in accordance with the relevant drawings, manufacturer\"s installation instruc tion, specifications and instructions of Site Engineer / EIC. Note: Weight of equipment is indicative only, Payment shall be done based on actual weight of equipment |
| 9 | Single Basket Type Strainer - 18\" x 600# |
| 10 | Above Ground Equipments Installation: Taking delivery and transportation of equipments from designated storage location within the pump station/Centralized warehouse loca tion within the state (Details of warehouse given in SCC) and placing on pre-constructed foundations, assembling together all sub-as semblies, levelling, alignment, grouting, cleaning and flushing by water, draining, checking, testing, dressing and making good of t he foundation and completing the work in allrespects in accordance with the relevant drawings, manufacturer\"s installation instruc tion, specifications and instructions of Site Engineer / EIC. Note: Weight of equipment is indicative only, Payment shall be done based on actual weight of equipment |
| 11 | Y - Type Strainer - 12\" x12\"- 150# |
| 12 | Y - Type Strainer -3\" X3\"X150#/ 4\" x4\"- 150# |
| 13 | \"Above ground process piping: Taking delivery & transporting of pipes from designated stock pile location /Designated godown both from outside & inside station pr emises. Taking delivery of pipe fittings, steel flanges, spiral wound metallic gaskets & fasteners from designated location within s tation premises, transporting the same to site, fabrication and erection of above ground piping including cutting, edge preparation,bending, threading, lining up, welding and installing pipes and pipe fittings, flanges, elbows, equal and reducing outlet tees,conc entric/eccentric reducers, y-type strainers, drain funnels, vent pipes and tapping for instruments such as pressure gauges, thermal relief valves, thermowells etc., installing above ground at all elevations connecting with equipment nozzles, valves, vessels, in li ne instruments etc., welded and threaded pipe line of different pressure ratings, flushing pipes by water after cleaning by compress ed air, hydrostatic testing of each section to the specified pressure, draining the water, tie-in, final cleaning-up and dispoal of wastes and surpluses including providing all inputs such as labour, material, equipments and consumables necessary to perform the wo rk (other than those specifically under taken by the owner in this contract) and completing the work in all respects in accordance w ith the drawings, specifications and instructions of Site Engineer / EIC. Thickness and Grade mentioned in the item are for referenc e only and may vary. Payment shall be based on OD\" |
| 14 | 18\" OD x 0.375\"/0.438\"WTAPL 5L |
| 15 | 16\" OD x 0.375\"/0.438\"WTAPL 5L |
| 16 | 12.75\" OD x 0.375\" WTAPL 5L |
| 17 | 10.75\" OD x 0.365\" APL 5L |
| 18 | 8.625\" OD x 0.322\" / 0.375\" / 0.438\" WT API 5L /ASTM A106/A333 |
| 19 | 6.625\" OD x 0.280\" ASTM A 106 Pipe/A333 |
| 20 | 4.5\" OD x 0.237\"WT ASTM A 106 Gr B/A333 |
| 21 | 3.5\" OD x 0.216\"WT ASTM A 106 Gr B /A333 |
| 22 | 2.375\" OD x 0.218\"WT ASTM A 106 Gr B /A333 |
| 23 | 1.315\" OD x 0.179\"WTASTM A 106 Gr B /A333 |
| 24 | Above ground internal epoxy coated pipe for Fire Water Services: (with internal epoxy coating for repair at wending joints, Flanges& Fittings ) Taking delivery of internal epoxy coated pipes, pipe fittings, steel flanges, spiral wound metallic gaskets & fasteners from designa ted location within station premises/Centralized warehouse within the state (as applicble) , transporting the same to site, fabricat ion and erection of above ground piping including cutting, edge preparation, bending, threading, lining up, welding and installing p ipes and pipe fittings, flanges, elbows, equal and reducing outlet tees, concentric/eccentric reducers, y-type strainers, drain funn els, vent pipes and tapping for instruments such as pressure gauges, thermal relief valves, thermowells etc., installing above groun d at all elevations connecting with equipment nozzles, valves, vessels, in line instruments etc., welded and threaded pipe line of d ifferent pressure ratings, flushing pipes by water after cleaning by compressed air, hydrostatic testing of ( Continue ) |
| 25 | (CONTINUE From Above SL No.24.00 )each section to the spec ified pressure, draining the water, tie-in, final cleaning-up and disposal of wastes and surpluses including providing all inputs su ch as labour, material, equipments and consumables necessary to perform the work (other than those specifically under taken by the o wner in this contract).The scope shall also include cleaning of internal surface of pipes conforming to SSPC SP-10 of flanges, fittings and at all location where coating has been distroyed due to welding a nd repairing the internal surface by application of 2-pack cold cured Isophthalic polyster acrylic co-polymer glass flake filled /Li quid epoxy / Equivalent with coating of thickness 700-1000 Microns. The locations where internal coating repair is expected would beat pipe end, Flanges ,pipe fittings ,valve location so that the internal of pipe surface is not directly exposed to water and compl eting the work in all respects in accordance with the drawings, specifications and instructions of Site Engineer / EIC. Note:- 1) Charges for supply of pipe with internal coating shall be paid under separate SOR items. |
| 26 | 18\" ODx 0.375\"/0.25IN WT IS3589 FE410 |
| 27 | 12.75\" ODx 0.250\" WT IS3589 FE410 Pipe |
| 28 | 10.75\" ODx 0.250\" WT IS3589 FE410 Pipe |
| 29 | 6.625\" ODx 0.250\" WT IS3589 FE410 Pipe |
| 30 | 4.5\" ODx 0.237\" WT ASTMA 106 Gr B Pipe FW |
| 31 | 3.5\" OD x 0.216\"WT ASTM A 106 Gr B FW |
| 32 | 2.375\" OD x 0.218\"WT ASTM A 106 Gr B -FW |
| 33 | 1.315\" OD x 0.179\"WTASTM A 106 Gr B -FW |
| 34 | Under ground piping for Process piping (with PU/3LPE Coating): Taking delivery of bare Pipes, pipe fittings, steel flanges, spiral w ound metallic gaskets & fasteners from designated location within station premises/outside stockpile loction transporting the same t o site, fabrication and erection of underground piping including cutting, edge preparation, bending, threading, lining up and weldin g, excavating, trenching in all kind of soil to specific depths as indicated in drawings and installing pipes and all types of pipe fittings like flanges, elbows, equal and reducing outlet tees, concentric/eccentric reducers, drain funnels, vent pipe and tapping f or instrument such as pessure gauges, thermal relief valves, thermowells etc., underground at elevations indicated in the drawing co nnecting with equipment nozzles, valves, vessels, in-line instruments etc.,Cleaning exposed steel surfaces of Bare Pipes, Pipe Joint s, Fittings, Flanges,equipment and valves etc.(Continue ) |
| 35 | (Continue From Above SL No.33.01) by sand blasting or with power wire brush (wherever sand blast cleaning is not possib le) free of dust, grease, mill scales etc. and applying single layer polyurethane coating(PU) using 100% solvent free elastomeric pl yurethane/ liquid epoxy, with approved materials ,Equipment etc, holiday detection of the coating, cleaning of coated pipes by waterflushing after cleaning by compresed air,hydrostatic testing of each section to the specified pressure, draining the water, tie-in,back filling, restoration of site final cleaning up and disposal of water and surpluses, providing all inputs such as labour, mater ials equipment and consumable necessary to perform the work (other than those specifically undertaken to be supplied by the owner un der the contract) and completing the work in all respects in accordance with the drawings, specifications and instructions of the Si te Engineer / EIC. In case of 3LPE coated pipes, weld joints shall be PU coated.Thickness and Grade mentioned in the item are for re ference only and may vary. Payment shall be based on OD Note:- Charges for applying single layer polyurethane coating(PU) using 100%solvent free elastomeric plyurethane/ liquid epoxy for exposed steel surfaces of Bare Pipes, Pipe Joints, Fittings, Flanges,equipme nt and valves etc shall be paid under separate SOR Item. |
| 36 | 18\" OD x 0.375\"/0.438\"WTAPL 5L -U/G |
| 37 | 16\" OD x 0.375\"/0.438\"WTAPL 5L -U/G |
| 38 | 12.75\" OD x 0.375\" WTAPL 5L -U/G |
| 39 | 8.625\" OD x 0.322\" / 0.375\" / 0.438\" WT API 5L /ASTM A106/A333 -U/G |
| 40 | 6.625\" OD x 0.280\" ASTM A 106 Gr B/A333 Pipe -U/G |
| 41 | 4.5\" OD x 0.237\"WT ASTM A 106 Gr B/A333-U/G |
| 42 | 3.5\" OD x 0.216\"WT ASTM A 106 Gr B/A333 -U/G |
| 43 | 2.375\" OD x 0.218\"WT ASTM A 106 Gr B/A333 -U/G |
| 44 | 1.315\" OD x 0.179\"WTASTM A 106 Gr B/A333 -U/G |
| 45 | Under ground piping for Fire Water Services:(with internal epoxy coating for repair at welding joints, flanges and fittings) Taking delivery of bare Pipes, pipe fittings, steel flanges, spiral wound metallic gaskets & fasteners from designated location within stat ion premises/from centralized wearhouse within the state (as applicable) transporting the same to site, fabrication and erection of underground piping including cutting, edge preparation, bending, threading, lining up and welding, excavating, trenching in all kindof soil to specific depths as indicated in drawings and installing pipes and all types of pipe fittings like flanges, elbows, equaland reducing outlet tees, concentric/eccentric reducers, drain funnels, vent pipe and tapping for instrument such as pessure gauges , thermal relief valves, thermowells etc., underground at elevations indicated in the drawing connecting with equipment nozzles, val ves, vessels, in-line instruments etc., cleaning of coated pipes by water flushing after cleaning by compresed air,hydrostatic testi ng of each section to the specified pressure, draining the water, tie-in, back filling, restoration of site final cleaning up and di sposal of water and surpluses, (Continue ) |
| 46 | (Continue From Above SL no. 43.01)providing all inputs such as labour, materials equipment and consumable necessary to perform the work(other than those specifically undertaken to be supplied by the owner under the contract) .The scope shall also include cleaning ofinternal surface of pipes conforming to SSPC SP-10 of Flanges, fiitings and at all location where coating has been distroyed due towelding and repairing the internal surface by application of 2-pack cold cured Isophthalic polyster acrylic co-polymer glass flake filled /Liquid epoxy / Equivalent with coating of thickness as per specifications. The locations where internal coating repair is ex pected would be at pipe end, Flanges ,pipe fittings ,valve location so that the internal of pipe surface is not directly exposed to water and completing the work in all respects in accordance with the drawings, specifications and instructions of Site Engineer / EI C. Note:- 1) Charges for applying polyurethane coating(PU) for exposed steel surfaces of Bare Pipes, Pipe Joints, Fittings, Flanges, equipment and valves etc shall be paid under separate SOR Item. 2) Charges for supply of pipe with internal coating shall be paid un der separate SOR items. |
| 47 | 18\" ODx 0.375\" WT IS3589 FE410 Pipe -U/G |
| 48 | 6.625\" ODx 0.250\" WT IS3589 FE410 PipeU/G |
| 49 | 4.5\" ODx 0.237\" WT ASTMA 106 Gr B Pipe FW U/G |
| 50 | 3.5\" OD x 0.216\"WT ASTM A 106 Gr B FW U/G |
| 51 | Above ground piping for Air line: Taking delivery of pipes, pipe fittings, steel flanges, spiral wound metallic gaskets & fastenersfrom designated location within station premises, transporting the same to site, fabrication and erection of above ground piping in cluding cutting, edge preparation, bending, threading, lining up, welding and installing pipes and pipe fittings, flanges, elbows, e qual and reducing outlet tees, concentric reducers, drain funnels, vent pipes and tapping for instruments such as pressure gauges, t hermal relief valves, thermowells etc., installing above ground at all elevations connecting with equipment nozzles, valves, vessels , in line instruments etc., welded and threaded pipe line of different pressure ratings, flushing pipes by water after cleaning by c ompressed air including air cleaning prior to installation of valve by card board/ Tin blasting method, hydrostatic testing of each section to the specified pressure, draining the water, tie-in, final cleaning-up and disposal of wastes and surpluses including prov iding all inputs such as labour, material, equipments and consumables necessary to perform the work (other than those specifically u nder taken by the owner in this contract).completing the work in all respects in accordance with the drawings, specifications and in structions of Site Engineer /3.5 ODx0.216\" WTASTMA106 Gr.B PipeF/A |
| 52 | 3.5\" ODx 0.216\" WT ASTMA 106 Gr B Pipe F/A |
| 53 | 2.375\" ODx 0.218\" WT ASTMA 106 Gr B Pipe F/A |
| 54 | 1.315\" ODx 0.179\" WT ASTMA 106 Gr B Pipe F/A |
| 55 | Under ground piping for Air piping: Taking delivery of pipes, pipe fittings, steel flanges, spiral wound metallic gaskets & fastene rs from designated location within station premises transporting the same to site, fabrication and erection of underground piping in cluding cutting, edge preparation, bending, threading, lining up and welding, excavating, trenching in all kind of soil to specific depths as indicated in drawings and installing pipes and all types of pipe fittings like flanges, elbows, equal and reducing outlet tees, concentric/eccentric reducers, drain funnels, vent pipe and tapping for instrument such as pessure gauges, thermal relief valv es, thermowells etc., underground at elevations indicated in the drawing connecting with equipment nozzles, valves, vessels, in-lineinstruments etc., cleaning the material surface by sandblast cleaning, coating and wrapping the pipes/pipe fittings with coaltar ba se tape coating material (including the supply of coating tape, precoat material etc.), holiday detection of the coating, cleaning o f coated pipes by water flushing after cleaning by compresed air prior to installation of valve, cleaning by card board/ Tin blastin g method, hydrostatic testing of each section to the specified pressure, draining the water, tie-in, back filling, restoration of si te final cleaning up and disposal of water and surpluses, providing all inputs such as labour, materials equipment and consumable ne cessary to perform the work (other than those specifically undertaken to be supplied by the owner under the contract) and completingthe work in all respects in accordance with the drawings, specifications and instructions of the Site Engineer / EIC. |
| 56 | 3.5\" ODx 0.237\"WT ASTMA 106 Gr B F/A/ U/G |
| 57 | 2.375\" ODx 0.237\"WT ASTMA 106 Gr B F/A/ U/G |
| 58 | 1.315\" ODx 0.237\"WT ASTM A 106 Gr B F/A/ U/G |
| 59 | Valves:Taking delivery and transportationof valves of all types and pressurerating from designated locationwithin station pr emises/ Centralizedwarehouse location within the state(Details of warehouse given in SCC),Taking delivery of from thedesigna ted location within stationpremises, transporting the same tosite, erecting above ground onpreconstructed foundations orunde rground including earth work inexcavation and filling for underground valves at elevationsspecifiedin the drawings, priming andpainting of above ground valves, PUPainting of under ground portions(if applicable) including allinputs,labour, materia l and consumable(other than those specificallyundertaken to be supplied by theowner) and completing the work inallrespectsin accordance with thedrawings, manufacturer\"sinstallationinstructions and specifications andinstructions of the Site Engin eer /EIC. |
| 60 | 2\" ANSI 900# HOV F/F API 6D Gate Valve |
| 61 | Valves:Taking delivery and transportationof valves of all types and pressurerating from designated locationwithin station pr emises/ Centralizedwarehouse location within the state(Details of warehouse given in SCC),Taking delivery of from thedesigna ted location within stationpremises, transporting the same tosite, erecting above ground onpreconstructed foundations orunde rground including earth work inexcavation and filling for underground valves at elevationsspecifiedin the drawings, priming andpainting of above ground valves, PUPainting of under ground portions(if applicable) including allinputs,labour, materia l and consumable(other than those specificallyundertaken to be supplied by theowner) and completing the work inallrespectsin accordance with thedrawings, manufacturer\"sinstallationinstructions and specifications andinstructions of the Site Engin eer /EIC. |
| 62 | 1\" x ANSI 1500# HOV W/W API 602 Gate Valve |
| 63 | Valves:Taking delivery and transportationof valves of all types and pressurerating from designated locationwithin station pr emises/ Centralizedwarehouse location within the state(Details of warehouse given in SCC),Taking delivery of from thedesigna ted location within stationpremises, transporting the same tosite, erecting above ground onpreconstructed foundations orunde rground including earth work inexcavation and filling for underground valves at elevationsspecifiedin the drawings, priming andpainting of above ground valves, PUPainting of under ground portions(if applicable) including allinputs,labour, materia l and consumable(other than those specificallyundertaken to be supplied by theowner) and completing the work inallrespectsin accordance with thedrawings, manufacturer\"sinstallationinstructions and specifications andinstructions of the Site Engin eer /EIC. |
| 64 | 1\" x ANSI 800# HOV W/W API 602 Gate Valve |
| 65 | Valves:Taking delivery and transportationof valves of all types and pressurerating from designated locationwithin station pr emises/ Centralizedwarehouse location within the state(Details of warehouse given in SCC),Taking delivery of from thedesigna ted location within stationpremises, transporting the same tosite, erecting above ground onpreconstructed foundations orunde rground including earth work inexcavation and filling for underground valves at elevationsspecifiedin the drawings, priming andpainting of above ground valves, PUPainting of under ground portions(if applicable) including allinputs,labour, materia l and consumable(other than those specificallyundertaken to be supplied by theowner) and completing the work inallrespectsin accordance with thedrawings, manufacturer\"sinstallationinstructions and specifications andinstructions of the Site Engin eer /EIC. |
| 66 | 2\" x ANSI 1500# Sr. W/W API 602 Gate Valve HOV |
| 67 | Valves:Taking delivery and transportationof valves of all types and pressurerating from designated locationwithin station pr emises/ Centralizedwarehouse location within the state(Details of warehouse given in SCC),Taking delivery of from thedesigna ted location within stationpremises, transporting the same tosite, erecting above ground onpreconstructed foundations orunde rground including earth work inexcavation and filling for underground valves at elevationsspecifiedin the drawings, priming andpainting of above ground valves, PUPainting of under ground portions(if applicable) including allinputs,labour, materia l and consumable(other than those specificallyundertaken to be supplied by theowner) and completing the work inallrespectsin accordance with thedrawings, manufacturer\"sinstallationinstructions and specifications andinstructions of the Site Engin eer /EIC. |
| 68 | 16\" x ANSI 900# MOV F/F API 6D Ball Valve |
| 69 | 12\" x ANSI 900# MOV F/F API 6D Ball Valve |
| 70 | 2\" x ANSI 900# HOV F/F API 6D Ball Valve |
| 71 | Valves:Taking delivery and transportationof valves of all types and pressurerating from designated locationwithin station pr emises/ Centralizedwarehouse location within the state(Details of warehouse given in SCC),Taking delivery of from thedesigna ted location within stationpremises, transporting the same tosite, erecting above ground onpreconstructed foundations orunde rground including earth work inexcavation and filling for underground valves at elevationsspecifiedin the drawings, priming andpainting of above ground valves, PUPainting of under ground portions(if applicable) including allinputs,labour, materia l and consumable(other than those specificallyundertaken to be supplied by theowner) and completing the work inallrespectsin accordance with thedrawings, manufacturer\"sinstallationinstructions and specifications andinstructions of the Site Engin eer /EIC. |
| 72 | 18\" x ANSI 600# MOV F/F API 6D Ball Valve |
| 73 | 16\" x ANSI 600# MOV F/F API 6D Ball Valve |
| 74 | 12\" x ANSI 600# MOV F/F API 6D Ball Valve |
| 75 | 8\" x ANSI 600# MOV F/F API 6D Ball Valve |
| 76 | 6\" x ANSI 600# HOV F/F API 6D Ball Valve |
| 77 | 4\" x ANSI 600# HOV F/F API 6D Ball Valve |
| 78 | 3\" x ANSI 600# HOV F/F API 6D Ball Valve |
| 79 | 2\" x ANSI 600# HOV F/F API 6D Ball Valve |
| 80 | 2\" x ANSI 600# HOV W/W API 6D Ball / Ball Valve |
| 81 | 1\" x ANSI 600# HOV F/F BS 5351 BALL VALVE |
| 82 | Valves:Taking delivery and transportationof valves of all types and pressurerating from designated locationwithin station pr emises/ Centralizedwarehouse location within the state(Details of warehouse given in SCC),Taking delivery of from thedesigna ted location within stationpremises, transporting the same tosite, erecting above ground onpreconstructed foundations orunde rground including earth work inexcavation and filling for underground valves at elevationsspecifiedin the drawings, priming andpainting of above ground valves, PUPainting of under ground portions(if applicable) including allinputs,labour, materia l and consumable(other than those specificallyundertaken to be supplied by theowner) and completing the work inallrespectsin accordance with thedrawings, manufacturer\"sinstallationinstructions and specifications andinstructions of the Site Engin eer /EIC. |
| 83 | 4\" x ANSI 300# HOV F/F API 6D Ball Valve |
| 84 | 3\" x ANSI 300# HOV F/F API 6D Ball Valve |
| 85 | 2\" x ANSI 300# HOV F/F API 6D Ball Valve |
| 86 | 2\" x ANSI 300# HOV W/W API 6D Ball Valve |
| 87 | Valves:Taking delivery and transportationof valves of all types and pressurerating from designated locationwithin station pr emises/ Centralizedwarehouse location within the state(Details of warehouse given in SCC),Taking delivery of from thedesigna ted location within stationpremises, transporting the same tosite, erecting above ground onpreconstructed foundations orunde rground including earth work inexcavation and filling for underground valves at elevationsspecifiedin the drawings, priming andpainting of above ground valves, PUPainting of under ground portions(if applicable) including allinputs,labour, materia l and consumable(other than those specificallyundertaken to be supplied by theowner) and completing the work inallrespectsin accordance with thedrawings, manufacturer\"sinstallationinstructions and specifications andinstructions of the Site Engin eer /EIC. |
| 88 | 3\" x ANSI 150# HOV W/W API 6D Ball Valve |
| 89 | Valves:Taking delivery and transportationof valves of all types and pressurerating from designated locationwithin station pr emises/ Centralizedwarehouse location within the state(Details of warehouse given in SCC),Taking delivery of from thedesigna ted location within stationpremises, transporting the same tosite, erecting above ground onpreconstructed foundations orunde rground including earth work inexcavation and filling for underground valves at elevationsspecifiedin the drawings, priming andpainting of above ground valves, PUPainting of under ground portions(if applicable) including allinputs,labour, materia l and consumable(other than those specificallyundertaken to be supplied by theowner) and completing the work inallrespectsin accordance with thedrawings, manufacturer\"sinstallationinstructions and specifications andinstructions of the Site Engin eer /EIC. |
| 90 | 2\" x ANSI 150# HOV F/F API 6D Ball Valve |
| 91 | Valves:Taking delivery and transportationof valves of all types and pressurerating from designated locationwithin station pr emises/ Centralizedwarehouse location within the state(Details of warehouse given in SCC),Taking delivery of from thedesigna ted location within stationpremises, transporting the same tosite, erecting above ground onpreconstructed foundations orunde rground including earth work inexcavation and filling for underground valves at elevationsspecifiedin the drawings, priming andpainting of above ground valves, PUPainting of under ground portions(if applicable) including allinputs,labour, materia l and consumable(other than those specificallyundertaken to be supplied by theowner) and completing the work inallrespectsin accordance with thedrawings, manufacturer\"sinstallationinstructions and specifications andinstructions of the Site Engin eer /EIC. |
| 92 | 1\" x ANSI 800# HOV F/F BS 5351 BALL VALVE |
| 93 | 1\" x ANSI 800# HOV W/W BS 5351 BALL VALVE |
| 94 | 1\" x ANSI 1500# HOV W/W BS 5351 BALL VALVE |
| 95 | Valves:Taking delivery and transportationof valves of all types and pressurerating from designated locationwithin station pr emises/ Centralizedwarehouse location within the state(Details of warehouse given in SCC),Taking delivery of from thedesigna ted location within stationpremises, transporting the same tosite, erecting above ground onpreconstructed foundations orunde rground including earth work inexcavation and filling for underground valves at elevationsspecifiedin the drawings, priming andpainting of above ground valves, PUPainting of under ground portions(if applicable) including allinputs,labour, materia l and consumable(other than those specificallyundertaken to be supplied by theowner) and completing the work inallrespectsin accordance with thedrawings, manufacturer\"sinstallationinstructions and specifications andinstructions of the Site Engin eer /EIC. |
| 96 | 16\" x 900#API 6D SWING CHECK VALVE , F/F, A/G |
| 97 | 12\" x 900# API 6D SWING CHECK VALVE , F/F, A/G |
| 98 | Valves:Taking delivery and transportationof valves of all types and pressurerating from designated locationwithin station pr emises/ Centralizedwarehouse location within the state(Details of warehouse given in SCC),Taking delivery of from thedesigna ted location within stationpremises, transporting the same tosite, erecting above ground onpreconstructed foundations orunde rground including earth work inexcavation and filling for underground valves at elevationsspecifiedin the drawings, priming andpainting of above ground valves, PUPainting of under ground portions(if applicable) including allinputs,labour, materia l and consumable(other than those specificallyundertaken to be supplied by theowner) and completing the work inallrespectsin accordance with thedrawings, manufacturer\"sinstallationinstructions and specifications andinstructions of the Site Engin eer /EIC. |
| 99 | 16\" x 600# API 6D SWING CHECK VALVE F/F, A/G |
| 100 | 8\"x ANSI 600# F/F API 6D Swing Check Valve |
| 101 | Valves:Taking delivery and transportationof valves of all types and pressurerating from designated locationwithin station pr emises/ Centralizedwarehouse location within the state(Details of warehouse given in SCC),Taking delivery of from thedesigna ted location within stationpremises, transporting the same tosite, erecting above ground onpreconstructed foundations orunde rground including earth work inexcavation and filling for underground valves at elevationsspecifiedin the drawings, priming andpainting of above ground valves, PUPainting of under ground portions(if applicable) including allinputs,labour, materia l and consumable(other than those specificallyundertaken to be supplied by theowner) and completing the work inallrespectsin accordance with thedrawings, manufacturer\"sinstallationinstructions and specifications andinstructions of the Site Engin eer /EIC. |
| 102 | 3\"x ANSI 150# F/F API 6D Swing Check Valve |
| 103 | 2\"x ANSI 150# F/F API 6D Swing Check Valve |
| 104 | Valves:Taking delivery and transportationof valves of all types and pressurerating from designated locationwithin station pr emises/ Centralizedwarehouse location within the state(Details of warehouse given in SCC),Taking delivery of from thedesigna ted location within stationpremises, transporting the same tosite, erecting above ground onpreconstructed foundations orunde rground including earth work inexcavation and filling for underground valves at elevationsspecifiedin the drawings, priming andpainting of above ground valves, PUPainting of under ground portions(if applicable) including allinputs,labour, materia l and consumable(other than those specificallyundertaken to be supplied by theowner) and completing the work inallrespectsin accordance with thedrawings, manufacturer\"sinstallationinstructions and specifications andinstructions of the Site Engin eer /EIC. |
| 105 | 3\"x ANSI 300 # HOV F/F API 600 Gate / BS 5351 Ball Valve (For Fuel / Air Piping) |
| 106 | 2\"x ANSI 300 # HOV F/F API 600 Gate / BS 5351 Ball Valve (For Fuel / Air Piping) |
| 107 | 1\"x ANSI 600 # HOV F/F API 600 Gate / BS 5351 Ball Valve (For Fuel / Air Piping) |
| 108 | 1\"x ANSI 300 # HOV F/F API 600 Gate / BS 5351 Ball Valve (For Fuel / Air Piping) |
| 109 | Valves:Taking delivery and transportationof valves of all types and pressurerating from designated locationwithin station pr emises/ Centralizedwarehouse location within the state(Details of warehouse given in SCC),Taking delivery of from thedesigna ted location within stationpremises, transporting the same tosite, erecting above ground onpreconstructed foundations orunde rground including earth work inexcavation and filling for underground valves at elevationsspecifiedin the drawings, priming andpainting of above ground valves, PUPainting of under ground portions(if applicable) including allinputs,labour, materia l and consumable(other than those specificallyundertaken to be supplied by theowner) and completing the work inallrespectsin accordance with thedrawings, manufacturer\"sinstallationinstructions and specifications andinstructions of the Site Engin eer /EIC. |
| 110 | 3\"x ANSI 300# F/F BS 1868 Swing Check Valve (For Fuel / Air Piping) |
| 111 | 2\"x ANSI 300# F/F BS 1868 Swing Check Valve (For Fuel / Air Piping) |
| 112 | Valves:Taking delivery and transportationof valves of all types and pressurerating from designated locationwithin station pr emises/ Centralizedwarehouse location within the state(Details of warehouse given in SCC),Taking delivery of from thedesigna ted location within stationpremises, transporting the same tosite, erecting above ground onpreconstructed foundations orunde rground including earth work inexcavation and filling for underground valves at elevationsspecifiedin the drawings, priming andpainting of above ground valves, PUPainting of under ground portions(if applicable) including allinputs,labour, materia l and consumable(other than those specificallyundertaken to be supplied by theowner) and completing the work inallrespectsin accordance with thedrawings, manufacturer\"sinstallationinstructions and specifications andinstructions of the Site Engin eer /EIC. |
| 113 | 16\" 900# Control Valve F/F A/G |
| 114 | 8\" 600# Control Valve F/F |
| 115 | Valves:Taking delivery and transportationof valves of all types and pressurerating from designated locationwithin station pr emises/ Centralizedwarehouse location within the state(Details of warehouse given in SCC),Taking delivery of from thedesigna ted location within stationpremises, transporting the same tosite, erecting above ground onpreconstructed foundations orunde rground including earth work inexcavation and filling for underground valves at elevationsspecifiedin the drawings, priming andpainting of above ground valves, PUPainting of under ground portions(if applicable) including allinputs,labour, materia l and consumable(other than those specificallyundertaken to be supplied by theowner) and completing the work inallrespectsin accordance with thedrawings, manufacturer\"sinstallationinstructions and specifications andinstructions of the Site Engin eer /EIC. |
| 116 | 16\" ANSI 900 /600# # F/F BS-1873 GLOBE Valve |
| 117 | 2\" ANSI 900# F/F BS-1873/BS EN ISO 15761 GLOBE Valve |
| 118 | 12\" ANSI 600 # F/F BS-1873 GLOBE Valve |
| 119 | 8\"x ANSI 600 # F/F BS-1873 GLOBE Valve |
| 120 | 6\"x ANSI 600 # F/F BS-1873 GLOBE Valve |
| 121 | 4\"x ANSI 600# F/F BS-1873/BS EN ISO 15761 GLOBE Valve |
| 122 | 3\"x ANSI 600# F/F BS-1873/BS EN ISO 15761 GLOBE Valve |
| 123 | 2\"x ANSI 600# F/F BS-1873 GLOBE Valve |
| 124 | 3\"x ANSI 300# F/F BS-1873/BS EN ISO 15761 GLOBE Valve |
| 125 | 2\"x ANSI 300# F/F BS-1873/BS EN ISO 15761 GLOBE Valve |
| 126 | 1\"x ANSI 1500# W/W BS-1873/BS EN ISO 15761 GLOBE Valve |
| 127 | 1\"x ANSI 800# W/W BS-1873/BS EN ISO 15761 GLOBE Valve |
| 128 | Valves:Taking delivery and transportationof valves of all types and pressurerating from designated locationwithin station pr emises/ Centralizedwarehouse location within the state(Details of warehouse given in SCC),Taking delivery of from thedesigna ted location within stationpremises, transporting the same tosite, erecting above ground onpreconstructed foundations orunde rground including earth work inexcavation and filling for underground valves at elevationsspecifiedin the drawings, priming andpainting of above ground valves, PUPainting of under ground portions(if applicable) including allinputs,labour, materia l and consumable(other than those specificallyundertaken to be supplied by theowner) and completing the work inallrespectsin accordance with thedrawings, manufacturer\"sinstallationinstructions and specifications andinstructions of the Site Engin eer /EIC. |
| 129 | 4\"x6\" Pilot Operated Surge Pressure Relief Valve 150# F/F |
| 130 | 1\" x 1\"Thermal Relief Valve F/F ANSI900# x 300# |
| 131 | 1\" x 1\"Thermal Relief Valve F/F ANSI600# x 300# |
| 132 | 1\" x 1\"Thermal Relief Valve F/F ANSI300# x 300# |
| 133 | Installation of Valves(for Fire water Lines-Tanks & Piping) : Taking delivery and transportationof valves of all types and pressurerating from designated locationwithin station premises/ C entralizedwarehouse location within the state(Details of warehouse given in SCC),Taking delivery of from thedesignated locat ion within stationpremises, transporting the same tosite, erecting above ground onpreconstructed foundations orunderground i ncluding earth work inexcavation and filling for underground valves at elevationsspecifiedin the drawings, priming andpain ting of above ground valves, PUPainting of under ground portions(if applicable) including allinputs,labour, material and con sumable(other than those specificallyundertaken to be supplied by theowner) and completing the work inallrespects in accor dance with thedrawings, manufacturer\"sinstallationinstructions and specifications andinstructions of the Site Engineer /EI C. |
| 134 | 18\"x ANSI 150 # HOV F/F API 600 Gate Valve FW |
| 135 | 12\"x ANSI 150 # HOV F/F API 600 Gate Valve FW |
| 136 | 10\"x ANSI 150 # HOV F/F API 600 Gate Valve FW |
| 137 | 6\"x ANSI 150 # HOV F/F API 600 Gate Valve FW |
| 138 | 4\"x ANSI 150 # HOV F/F API 600 Gate Valve FW |
| 139 | 3\"x ANSI 150 # HOV F/F API 600 Gate Valve FW |
| 140 | 2\"x ANSI 150 # HOV F/F API 600 Gate Valve FW |
| 141 | Installation of Valves(for Fire water Lines-Tanks & Piping) : Taking delivery and transportationof valves of all types and pressurerating from designated locationwithin station premises/ C entralizedwarehouse location within the state(Details of warehouse given in SCC),Taking delivery of from thedesignated locat ion within stationpremises, transporting the same tosite, erecting above ground onpreconstructed foundations orunderground i ncluding earth work inexcavation and filling for underground valves at elevationsspecifiedin the drawings, priming andpain ting of above ground valves, PUPainting of under ground portions(if applicable) including allinputs,labour, material and con sumable(other than those specificallyundertaken to be supplied by theowner) and completing the work inallrespects in accor dance with thedrawings, manufacturer\"sinstallationinstructions and specifications andinstructions of the Site Engineer /EI C. |
| 142 | 10\"x ANSI 150 # F/F BS 1868 Swing Check Valve FW |
| 143 | 3\"x ANSI 150 # F/F BS 1868 Swing Check Valve FW |
| 144 | 2\"x ANSI 150 # F/F BS 1868 Swing Check Valve FW |
| 145 | Monitor and HydrantTaking delivery of hydrants andmonitors rom thedesignated location,transporting the same to site,erectingover fire water line asper AFCdrawings including all inputs,labour, material and consumable andcompleting the work in all r espectsin accordance with the drawings,manufacturer\"s installationinstructions and specificationsandinstructions of the Site Engineer /EIC. |
| 146 | High Volume Long Range Foam Monitor 750 GPM capacity stand post typewith inlet flange of 4\" X 150# HVLR |
| 147 | Stand Post Type double way fire hydrant fitted with 2 Nos of single landing valve complete as per IS: 5290 alongwith 4\" x 150# WNRF Flange |
| 148 | Radiographic Inspection:Inspection of welding byradiographic method on all types ofpipingincluding processing of films and interpreting the results of weldquality and reporting the same tothe Site Engineer together withrecommendations as to theacc eptability or otherwise of thewelds,submitting the finishedradiographic films as may beapproved ordirected by Engineer-in- Chargeinclusive of supply of all pesonnel,labour, materials, equipment,consumable, inputs, etc. andproviding allservices c omplete in all respectsas envisaged in the contractdocuments.Note:i) Payment will be on the basis of number of welds of the respectivesize radiographed and shall be allinclusive for the complete job ofradiographic inspection asenvisaged in the cont ract document.ii) Radiography not involving fullgirth weld will be paid at 50% ofthe rate for full girth weld forthe respect ive size.iii) For set-on type branchwelding, the rate for radiographywill beas applicable to the branch pipesize.iv) Rep eat radiography ofindividual welds due to defectivefilms orrepair of welds shall be done atcontractor\"s cost.In case whereradiography is notpossible:v) Verification by utrasonictesting shall be done atcontractors cost.vi) Magenetic particle in spectionas and where required shall be doneatContractors cost. |
| 149 | 18\" NBPipe Joints RT |
| 150 | 16\" NBPipe Joints RT |
| 151 | 12\" NBPipe Joints RT |
| 152 | 10\" NBPipe Joints RT |
| 153 | 8\" NBPipe Joints RT |
| 154 | 6\" NBPipe Joints RT |
| 155 | 4\" NBPipe Joints RT |
| 156 | 3\" NBPipe Joints RT |
| 157 | 2\" NBPipe Joints RT |
| 158 | 1\" NBPipe JointsRT |
| 159 | \"Fabrication of Mitre Bends - LongRadius: (only for fire water piping) Taking delivery of pipes from designated locations, transportingthesame to site and fabrication ofcarbon steel piping specia ls bycutting,edge preparation, welding, alltypes of testing includingradiography &including supply of all inputs suchas labour, materials (other thanthose specifically undertaken to besupplied by the Owner under thecontract), equipments, consumab lesetc. necessary to perform andcompleting the work in all respectsin accordance with drawings,specifications and instructio ns ofthe Site Engineer / EIC.\" |
| 160 | 18\" OD x 0.375\" WT more than 45 ° & up to 90 ° Mitre Bend |
| 161 | 12.75\" OD x 0.375\" WTmore than 45° & up to 90° Mitre Bend |
| 162 | 10.75\" OD x 0.365\"/0.250\"more than 45 ° & up to 90 ° Mitre Bend |
| 163 | Dismantling of Structures: Dismantling by opening joints or by gas cutting/ cold cutting (wherever required as per site condition) of existing piping & steel s tructural such as HOT crane, support for pipes, pipe fittings, valves, plateforms, walkways, stairways etc. including excavation wor k wherever required handling, loading into truck for purpose of weighing, shifting to the designated location within the pump statio n premises and handing over, completing the work in all respect as per drawings, instruction of the Site Engineer / EIC _ |
| 164 | Dismantling of PipingAboveground and equipments Dismantling of existing over ground piping works of all types and sizes by opening flange joints or by gas cutting/ cold cutting or any other approved suitable means without damaging other portions of work. The job includes cutting the pipes to required sizes as directed, taking out valves, flanges, tees, bends, gaskets nuts, bolts etc. attached supports alongwith any instruments such as pressure gauge, temperature gauge etc. handling, transporting and storing at own er\"s designated store in safe manner to avoid damage including supply of all labour, materials, equipments, consumables etc. necessa ry to perform and complete the work in all respects as per drawings, instructions of the Site Engineer / EIC (payment shall be made on linear measurement of dismantled piping including bends tees etc.). Note : The contractor shall indicate the piping system to be dismantled and shall take specific approval from the Site engineer befo re dismantling of pipe. Certain redundant pipes which in the opinion of the Owner need not be retrieived, those items shall not be d ismantelled._ |
| 165 | Dismantling of Piping Underground Dismantling the existing under ground piping, locating, retrieving including excavating the proper trenches by cutting the pipes wit hout damaging other portions of work.The job includes cutting the pipes to required sizes as directed, taking out valves, flanges, t ees, bends, gaskets, nuts, bolts etc., handling, transporting and storing at owner\"s designated store in safe manner to avoid damageincluding supply of all labour, materials, equipment consumables etc. necessary to perform and complete the work in all respects asper drawing, instructions of the Site Engineer / EIC. (Payment shall be made on the linear measurement of dismantled piping including bend, tees, reducers etc.). Note : The contractor shall indicate the piping system to be dismantled and shall take specific approval from the Site engineer befo re dismantling of pipe.Certain redundant pipes which in the opinion of the Owner need not be retrieived, those items shall not be di smantled._ |
| 166 | Development of As Built Drawings , Data Sheets etc.: Development of as built drawings, data sheets, system details covering all additional facilities incorporated under this project in the station and furnishing them as reference document. Additionally, electronic copy of the documents shall also be furni shed in compact disks/USB drive_ |
| 167 | FW Network Analysis Model Building and Flow Analysis by using Pipenet/Sprink/Flowmaster Software, suggesting the requirement of orifice plate for flow a nd pressure control, preparation of reports, schematic drawings, recommendations and suggesting the pipe sizes in the fire water net wrok so that the fire fighting system meets the requirement of OISD 117, latest Edition. Completing the work in all respect as per t he defined scope of work and instructions of Site Engineer/EIC_ |
| 168 | Flexibility and piping stress analysis as per specification Model building and flexibility and piping stress analysis by using computer software CAESAR-II latest version or equivalent, conside ring load and design parameters mentioned in the specifications, preparation and submission of report, calculation and drawings as p er specification, completing the work in all respects as per detailed scope of work and instructions of Site-Engineer/EIC._ |
| 169 | Temporary Barricading Providing Temporary Barricading made of GI/ steel sheet with angle iron frame (40x40x6) in panels of 1.5 to 2.0m including lateral/ vertical angle bracing/ steel beam at bottom for stability, earth filling up to 300mm height above ground le vel, maintaining the barricading during construction at site, removing the same and clearing site after construction complete in allrespects as per instructions of Site Engineer._ |
| 170 | Piping Modification:Carrying out modification inalready fabricated and/ or erectedpipe dueto change in drawing or as require dby site condition, taking deliveryof pipe, pipe fittings, steelflanges, spiral wound metallicgaskets &fasteners from desi gnated locationwithin station premises,transporting the same to site, cutting of pipeand / or weld joint , edgepreparation, bending, lining up,welding and installing pipes andpipefittings, flanges, elbows, equaland reducing outlet tees,concentric /eccentric reducers,y-type strainers, drain funnels,ventpipes and tapping for instrumentssuch as pressure gauges, thermalr elief valves, thermowells etc.,installing above ground at allelevations connecting withequipment nozzles, valves, vessels,inlineinstruments etc., welded andthreaded pipe line of differentpressureratings, flushing pipes by waterafter cleaning by compressed air,hydrostatic testing of each sectionto the specified pressure, drainingthe water, tie-in, finalcleaning-up anddispoal of wastesand surplusesincluding providing all inputs suchas labour, material, equipments andconsumables necessary t o performthe work (other than thosespecificallyunder taken by the owner in thiscontract) and completing the work inall res pects in accordance with thedrawings, specifications andinstructions of Site Engineer /EIC. (Item is to be operated uponappr oval of SIte Enginner, Itemcovers only modification / reworkjobs.) |
| 171 | Pipe size up to 2 inch NB |
| 172 | Pipe size 3 inch NB to 6 Inch NB |
| 173 | Pipe size 8 inch NB and above |
| 174 | Fuel Oil Tank Installation: Taking delivery of Fuel Oil tank from designated godown / stockpile, shifting/transporting within station premises, placing on pre-c onstructed foundation, installation of auxiliary mountings and fittings, dressing and making good of the foundation, grouting, clean ing and flushing with water, draining, testing,completing the work in allrespects in accordance with the relevant drawings, manu facturer\"s installation instruction, specifications and instructions of Site Engineer / EIC (Foundation work shall be paid separatel y under relevant items of Civil works) |
| 175 | 20Kls Capacity MS Fuel Oil Tank |
| 176 | CSW-IPS1-COMPOSITE-ITC |
| 177 | 3 MECHANICAL |
| 178 | Supply and Erection of Structural Steel:Supplying at site, steel structural items such as steel plates, bars, MS gratings, chequeredplates, angles, beams channels, commercial quality heavy pipes, C.I. Rollers, bolts & nuts, washers, grouting bolts, padding platesetc., fabrication and erection of saddle supports and other type of supports for pipes manifolds and valves, fabrication and erecti on of platforms walkways, stairways etc., sand blast/ power brush cleaning, priming and painting the finished structures including s upply of all other inputs such as labour, materials, consumable etc. necessary to perform and complete the work in all respect, in a ccordance with drawings, specifications and instructions of the Site Engineer / EIC. |
| 179 | Supply and Erection of Electroforged Grating Supplying at site, steel structural items such as steel plates, bars, fabrication of gratings by electroforged method, after complet e fabrication entire gratings shall be Hot Dip galvanized, gratings shall be normany of size 810mm X 250mm for steps and 1200mm X 10 00 mm or 810mm X 1000 mm for platforms / walkways, or any size as advised by EIC. Placing gratings in a replaceable mannerbolting wi th base frame of ISA by suitable GI clamps and GI fasteners, including supply of all other inputs such as labour, materials, consuma ble etc. necessary to perform and complete the work in all respect, in accordance with drawings, specifications and instructions of the Site Engineer / EIC. |
| 180 | Supply and Erection of GI Structural Supplying at site, GI structural items such as flat, bars, chequered plates, angles, beams channels, commercial quality pipes,bolts & nuts, washers, grouting bolts, fabrication and erection of various structures items including supply of all other inputs such as l abour, materials, consumable etc. necessary to perform and complete the work in all respect, in accordance with drawings, specificat ions and instructions of the Site Engineer / EIC. |
| 181 | Painting: Cleaning exposed steel surfaces of piping, equipment and valves etc. by abrasive blasting or with power wire brush (wherever abrasiv e blast cleaning is not possible) free of dust, grease, mill scales etc. priming with one coat of primer and painting the surfaces w ith two coats as per specification, with approved materials, paints, brushes, labour, equipment etc. and completing the job in all r espects as per specification and instructions of the Site Engineer / EIC. All materials including supply of paint are in the scope of contractor. |
| 182 | Painting: Zinc Ethyl Slicate Primer |
| 183 | Painting: High Build EPOXY MIO |
| 184 | Painting: Isocynate Aliphatic Poly Urethene(PU) |
| 185 | PU /liquid epoxy Coating of under ground piping: Cleaning exposed steel surfaces of piping, equipment and valves etc. by sand blasting or with power wire brush (wherever sand blast cleaning is not possible) free of dust, grease, mill scales etc.and applying single layer polyurethane coating(PU) using 100% solv ent free elastomeric plyurethane/ liquid epoxy, with approved materials, labour, equipment etc. and completing the job in all respec ts as per specification and instructions of the Site Engineer / EIC. PU /liquid epoxy Coating of under ground piping:Polyurethane Coating(PU)/ Liquid Epoxy Coating |
| 186 | Supply Fabrication and Erection of temporary pump strainer: Supplying at site, steel structural items such as steel plates / sheets,SS perforated sheet, SS wire mesh, square bar, and other required structural steel items, cutting, grinding, welding, brazing, sold ering, fabrication of temporary pump strainer of different types and sizes as per the drawing, sand blast/ power brush cleaning, pri ming and painting the finished structures, erection of the strainer in the spool piece provided in suction of mainline pumps at the commissionin including supply of all other inputs such as labour, materials, consumable etc. necessary to perform and complete the w ork in all respect, in accordance with drawings, specifications and instructions of the Site Engineer / EIC. |
| 187 | Supply Fabrication and Erection of temporary pump strainer:12\" mesh Size 40 |
| 188 | Copper Strips/ Flats for Jumpers for Flanged Joits of the Product Process Piping:Supply and Installation of one copper jumper per flanged joint across the flanged joints for valves, spool piece, branch offs etc., of product process piping,The job includes cutt ing drilling of holes of required size in the copper strips/ flats for bolting purpose and complete the works in all respects as perspecifications & drawings and instructions of Site Engineer/ EIC.Note:- Copper jumpers shall be installed in all the flanged join ts of Product Process piping only and not in fire water lines. |
| 189 | Copper Strips/ Flats for Jumpers for Flanged Joits of the Product Process Piping:Up to 30 mm wide x 3 mm thick Copper strip |
| 190 | Copper Strips/ Flats for Jumpers for Flanged Joits of the Product Process Piping:30 - 50 mm wide x 3 mm thick Copper strip |
| 191 | Copper Strips/ Flats for Jumpers for Flanged Joits of the Product Process Piping:Up to 30 mm wide x 1 mm thick Copper strip |
| 192 | Copper Strips/ Flats for Jumpers for Flanged Joits of the Product Process Piping:30 - 50 mm wide x 1 mm thick Copper strip |
| 193 | Copper Strips/ Flats for Jumpers for Flanged Joits of the Product Process Piping:50 - 75 mm wide x 1 mm thick Copper strip |
| 194 | HOT/EOT CRANE: Design, manufacture, inspection & testing at manufacturer\"s works in presence of IOCL and or TPI appointed by Contrac tor and supply of HOT/EOT cranes (having main girder beam) as per specifications, takingdelivery, shifting / transporting within thepump station premises anderecting on the shed, assemblies / sub-assemblies, auxiliaries, girders etc, aligning checking for free mo vement of the crane from one end toother and cross movement, cleaning by abrasive blasting, priming,painting as per painting schedul e, testing of the crane with specifiedload in presence of IOCL engineer and competent authority, obtainingload test certificate fromcompetent authority, including providing alllabours, materials, equipments and consumables necessary to perform andcomplete the wor ks in all respects as per specifications, drawings andinstructions of Site Engineer / EIC. (Charge of TPI and competent authority sh all be borne by the contractor). |
| 195 | HOT/EOT CRANE: 10 Ton capacity HOT crane for Mainline pump shed |
| 196 | HOT/EOT CRANE: 5 Ton cap HOT crane Fire Fighting Pump Shed |
| 197 | WATER STORAGE TANKS (CONE ROOF VERTICAL TYPE): Design, preparation of detailed fabrication & construction drawings and detailing alo ngwith supporting calculation meeting with the requirement in accordance with tendor specification/ stipulations/ drawings, taking d elivery and Transportation of all owner supplied materials as listed in SCC from owner\"s storage location within the owner designate d premises, supply of all other materials required to meet the requirementstipulated in tender and approved detailed fabrication &construction drawings, rolling, fabrication, erection and welding of all steel plates for specified capacity fixed roof type firewater storage tanks comprising of bottom, shell, cone roof including roof structure , wind girders, spiral stairway, hand rails, cu rb angle,and providing all manholes, nozzles etc. fittings and fixing of all appurtenances, instruments, accessories, sealing devi ces, safety devices etc. , suitable platform for the maintenance of level switches, providing support brackets for cable trays, pipi ng etc,conductinghydrostatic test and all other necessary tests, calibration of storage tanks including strapping with tapes, pr oviding scaffolding for calibration, calibration chart etc. Painting of bottom side of the bottom plates with specified paints, inte rnal and external painting of the tank with specified paint system, Visual and Radiographic inspection of Weld as per provisions of API 650/IS 803 latest editionand in line with the specifications in the tender document complete in all respects inclusive of all materials, tools and tackles etc., as per specifications and instructions of the Engineer in Charge. |
| 198 | WATER STORAGE TANKS (CONE ROOF VERTICAL TYPE): Nominal Capacity: 2700 Kl , Dia= 18.0m,Height=13.0 m |
| 199 | Medium Velocity Water Sprinkler System (Automatic): Automatic Medium velocity water Sprinkler System for barrel area, filtration, metering and Piping Area: Design, detail engineering, drawing and development of scheme for automatic medium velocity water sprinkler system for the equipment and piping area including s upply of all material like Deluge valve(Wet Type/ Dry Type), Spray nozzles, pressure switch, pressure gauge, piping, valves, flanges , coupling, pipe fittings, brackets, clamps, fasteners, solenoid switches, S.S piping, strainers, along with all accessories as per the approved scheme at site , erection and installation of piping, cabling, equipments and instruments control panel etc, provision of compressed air/pneumatic piping from owner\"s compressed air header located near compressor room for Dry Type Deluge Valve includi ng dismantling, breaking of road etc. as required for setting out of the system and making good the same, hooking up the system withthe hydrant network, sand blast cleaning, priming and painting (Zinc Ethyl Silicate Primer, High Build EPOXY MIO, Isocynate Aliphat ic PolyUrethane(PU) in sign all red colour); internal coating with liquid epoxy, Carrying out all electrical and instrumentation wor ks to enable auto actuation of the deluge valve and medium velocity water sprinkler system based on alarm signal from QB sensors/ ga s detectors/ flame detectors. Carrying out the electronic integration of the system with the control panel and providing alarm and a utomatic actuation of the deluge valves with manual over-ride provision, testing & commissioning of the system including cost of alllabour, services, materials tools & tackles consumables, first operation & furnishing of operation and maintenance manuals on lump sum basis as per specifications, International standard procedures, approved scheme, drawings and the direction of Site Engineer /EI C. Note:1. The control panel and control console with PC will be installed under the work of Gas detection system and the MV system is to be integrated with the existing system. 2. For System Designing/Area Calculation & inter distances between block facilities refer the General layout plan and Assembly Pipin g Area of respective Station. 3.Medium Velocity Water Sprinkler System for T-points atshall be designed considering wet type Deluge Valve as no compressed air i s available at these locations |
| 200 | Medium Velocity Water Sprinkler System for Station consisting of Barrel area, filteration, metering and piping area etc |
| 201 | Medium Velocity Water Sprinkler System for Extended Mainline Pump Shed |
| 202 | Supplying, fabricating, erecting, placing and fixing in position M.S. structural works using rolled/ built up sections for truss, cl addings, bracings, purlins, supporting frames made of joists, tubes, pipes, channels, angles, plates, flats, bars etc. including cut ting to required size welding of joints, fixing anchor plates, including bolts, theading, nuts, washers, sleeves etc. includingpre paration of detailed fabrication drawings & submission to the Engineer-in-Charge for approval before start of fabrication, supplying& applying painting with two coats of epoxy paint \"EPILUX 155 High Build Enamel over a coat of \"EPILUX 610\" Primer of M/s BERGER orany other approved equivalent make as per manufacturer’s recommendation, complete in all respects inclusive of cost of all labour, materials, tools, tackles etc. as per drawings, specifications and directions of the Engineer-in-Charge. (Excluding the cost of conc rete work). |
| 203 | Providing and fixing Stainless Steel (Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, b uffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts comple te, including fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of require d size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of the Engineer-in-Charge. (For payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fastene rs etc.). |
| 204 | Supplying, fabricating, erecting, placing and fixing in position M.S. structural works using rolled/ built up sections for truss, cl addings, bracings, purlins, supporting frames made of joists, tubes, pipes, channels, angles, plates, flats, bars etc. including cut ting to required size welding of joints, fixing anchor plates, including bolts, theading, nuts, washers, sleeves etc. includingpre paration of detailed fabrication drawings & submission to the Engineer-in-Charge for approval before start of fabrication, supplying& applying painting with two coats of epoxy paint \"EPILUX 155 High Build Enamel over a coat of \"EPILUX 610\" Primer of M/s BERGER orany other approved equivalent make as per manufacturer’s recommendation, complete in all respects inclusive of cost of all labour, materials, tools, tackles etc. as per drawings, specifications and directions of the Engineer-in-Charge. (Excluding the cost of conc rete work). |
| 205 | Dismantling steel work manually/ by mechanical means in built up sections without dismembering and stacking within 50 metres lead asper direction of Engineer-in-charge. [Notes: (1) Dismantling shall be allowed during day shift only & prior permission for the sameshall be obtained. (2) Providing of necessary covers/ barricades around the work area shall be done prior to dismantling operations . (3) Cutting of steel shall be done using hack saw or chiesel or any other method as approved by the Engineer-in-Charge.] |
| 206 | CSW-IPS1-SUPPLY-ITC |
| 207 | 3 MECHANICAL |
| 208 | Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document |
| 209 | 18\" SWMG ANSI 150# |
| 210 | 12\" SWMG ANSI 150# |
| 211 | 10\" SWMG ANSI 150# |
| 212 | 6\" SWMG ANSI 150# |
| 213 | 4\" SWMG ANSI 150# |
| 214 | 3\" SWMG ANSI 150# |
| 215 | 2\" SWMG ANSI 150# |
| 216 | 1\" SWMG ANSI 150# |
| 217 | Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document: |
| 218 | 4\" SWMG ANSI 300# |
| 219 | 3\" SWMG ANSI 300# |
| 220 | 2\" SWMG ANSI 300# |
| 221 | 1\" SWMG ANSI 300# |
| 222 | Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document |
| 223 | 18\" SWMG ANSI 600# |
| 224 | 16\" SWMG ANSI 600# |
| 225 | 12\" SWMG ANSI 600# |
| 226 | 10\" SWMG ANSI 600# |
| 227 | 8\" SWMG ANSI 600# |
| 228 | 6\" SWMG ANSI 600# |
| 229 | 4\" SWMG ANSI 600# |
| 230 | 3\" SWMG ANSI 600# |
| 231 | 2\" SWMG ANSI 600# |
| 232 | 1\" SWMG ANSI 600# |
| 233 | Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document |
| 234 | 16\" SWMG ANSI 900# |
| 235 | 12\" SWMG ANSI 900# |
| 236 | 2\" SWMG ANSI 900# |
| 237 | 1\" SWMG ANSI 900# |
| 238 | Supply and delivery of Steel Fasteners at respective stations as per Station wise Break up of material supply and as per technical s pecifications from approved vendors specified in tender document. F |
| 239 | Fasteners for Flanges 18\" x 150# (1.125\" Dia. X 6.50\" Length) |
| 240 | Fasteners for Flanges 12\" x 150# (0.875\" Dia. X 5.50\" Length ) |
| 241 | Fasteners for Flanges 10\" x 150# (0.875\" Dia. X 5.25\" Length ) |
| 242 | Fasteners for Flanges 8\" x 150# (0.750\" Dia. X 4.75\" Length) |
| 243 | Fasteners for Flanges 6\" x 150# (0.750\" Dia. X 4.50\" Length) |
| 244 | Fasteners for Flanges 4\" x 150# (0.625\" Dia. X 4.00\" Length ) |
| 245 | Fasteners for Flanges 3\" x 150# (0.625\" Dia. X 4.00\" Length ) |
| 246 | Fasteners for Flanges 2\" x 150# (0.625\" Dia. X 3.75\" Length ) |
| 247 | Fasteners for Flanges 1\" x 150# (0.500\" Dia. X 3.00\" Length ) |
| 248 | Supply and delivery of Steel Fasteners at respective stations as per Station wise Break up of material supply and as per technical s pecifications from approved vendors specified in tender document. F |
| 249 | Fasteners for Flanges 4\" x 300# (0.75\" Dia. X 5.00\" Length ) |
| 250 | Fasteners for Flanges 4\" x 300# (0.75\" Dia. X 5.75\" Length ) - extended stud length for flanges with spectacle blind |
| 251 | Fasteners for Flanges 3\" x 300# (0.75\" Dia. X 4.75\" Length ) |
| 252 | Fasteners for Flanges 3\" x 300# (0.75\" Dia. X 5.5\" Length ) - extended stud length for flanges with spectacle blin |
| 253 | Fasteners for Flanges 2\" x 300# (0.625\" Dia. X 4\" Length ) |
| 254 | Fasteners for Flanges 2\" x 300# (0.625\" Dia. X 4.75\" Length ) - extended stud length for flanges with spectacle blind |
| 255 | Fasteners for Flanges 1\" x 300# (0.625\" Dia. X 3.5\" Length ) |
| 256 | Fasteners for Flanges 1\" x 300# (0.625\" Dia. X 4\" Length ) - ext |
| 257 | Supply and delivery of Steel Fasteners at respective stations as per Station wise Break up of material supply and as per technical s pecifications from approved vendors specified in tender document. Fa |
| 258 | Fasteners for Flanges 18\" x 600# (1.605\" Dia. X 12.00\" Length ) |
| 259 | Fasteners for Flanges 18\" x 600# (1.605\" Dia. X 14.75\" Length ) - extended stud length for flanges with spectacle |
| 260 | Fasteners for Flanges 16\" x 600# (1.500\" Dia. X 11.00\" Length ) |
| 261 | Fasteners for Flanges 16\" x 600# (1.500\" Dia. X 13.75\" Length ) - extended stud length for flanges with spectacle |
| 262 | Fasteners for Flanges 12\" x 600# ( 1.25\" Dia. X 12\" Length ) - extended stud length for flanges with spectacle blind |
| 263 | Fasteners for Flanges 12\" x 600# (1.250\" Dia. X 9.75\" Length ) |
| 264 | Fasteners for Flanges 8\" x 600# (1.125\" Dia. X 10\" Length) - extended stud length for flanges with spectacle blind |
| 265 | Fasteners for Flanges 8\" x 600# (1.125\" Dia. X 8.25\" Length ) |
| 266 | Fasteners for Flanges 6\" x 600# (1.0\" Dia. X 9.0\" Length) - extended stud length for flanges with spectacle blind |
| 267 | Fasteners for Flanges 6\" x 600# (1.000\" Dia. X 7.50\" Length ) |
| 268 | Fasteners for Flanges 4\" x 600# ( 0.875\" Dia. X 7.75\" Length ) - extended stud length for flanges with spectacle blind |
| 269 | Fasteners for Flanges 4\" x 600# (0.875\" Dia. X 6.50\" Length ) |
| 270 | Fasteners for Flanges 3\" x 600# ( 0.75\" Dia. X 6.75\" Length ) - extended stud length for flanges with spectacle blind |
| 271 | Fasteners for Flanges 3\" x 600# (0.750\" Dia. X 5.50\" Length) |
| 272 | Fasteners for Flanges 2\" x 600# ( 0.625\" Dia. X 5.75\" Length ) - extended stud length for flanges with spectacle blind |
| 273 | Fasteners for Flanges 2\" x 600# (0.625\" Dia. X 4.75\" Length ) |
| 274 | Fasteners for Flanges 1\" x 600# (0.625\" Dia. X 5.0\" Length ) - extended stud length for flanges with spectacle blind |
| 275 | Fasteners for Flanges 1\" x 600# (0.625\" Dia. X 4.00\" Length ) |
| 276 | Supply and delivery of Steel Fasteners at respective stations as per Station wise Break up of material supply and as per technical s pecifications from approved vendors specified in tender document |
| 277 | Fasteners for Flanges 16\" x 900# (1.625\" Dia X 15.50\" Length) - extended stud length for flanges with spectacle blin |
| 278 | Fasteners for Flanges 16\" x 900# (1.625\" Dia X 12.50\" Length) |
| 279 | Fasteners for Flanges 12\" x 900# ( 1.375\" Dia. X 12\" Length ) - extended stud length for flanges with spectacle blind |
| 280 | Fasteners for Flanges 12\" x 900# (1.375\" Dia. X 11.00\" Length) |
| 281 | Fasteners for Flanges 2\" x 900# ( 0.875\" Dia. X 7.5\" Length ) - extended stud length for flanges with spectacle blind |
| 282 | Fasteners for Flanges 2\" x 900# (0.875\" Dia. X 6.50\" Length |
| 283 | Fasteners for Flanges 1\" x 900# (0.875\" Dia. X 6.75\" Length ) - extended stud length for flanges with spectacle blind |
| 284 | Fasteners for Flanges 1\" x 900# (0.875\" Dia. X 5.75\" Length |
| 285 | Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document |
| 286 | 18\", WNRF FLANGE, ANSI - 150# (B 16.5) |
| 287 | 12\", WNRF FLANGE, ANSI - 150# (B 16.5) |
| 288 | 10\", WNRF FLANGE, ANSI - 150# (B 16.5) |
| 289 | 6\", WNRF FLANGE, ANSI - 150# (B 16.5) |
| 290 | 4\", WNRF FLANGE, ANSI - 150# (B 16.5) |
| 291 | 3\", WNRF FLANGE, ANSI - 150# (B 16.5) |
| 292 | 2\", WNRF FLANGE, ANSI - 150# (B 16.5) |
| 293 | 1\", WNRF FLANGE, ANSI - 150# (B 16.5) |
| 294 | Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: |
| 295 | 4\", WNRF FLANGE, ANSI - 300# (B 16.5)-ASTM A350 LF2 |
| 296 | 3\", WNRF FLANGE, ANSI - 300# (B 16.5)-ASTM A350 LF2 |
| 297 | 2\", WNRF FLANGE, ANSI - 300# (B 16.5)-ASTM A350 LF2 |
| 298 | 1\", WNRF FLANGE, ANSI - 300# (B 16.5)-ASTM A350 LF2 |
| 299 | Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document |
| 300 | 18\", WNRF FLANGE, ANSI - 600# (B 16.5) |
| 301 | 16\", WNRF FLANGE, ANSI - 600# (B 16.5) |
| 302 | 12\", WNRF FLANGE, ANSI - 600# (B 16.5) |
| 303 | 10\", WNRF FLANGE, ANSI - 600# (B 16.5) |
| 304 | 8\", WNRF FLANGE, ANSI - 600# (B 16.5) |
| 305 | 6\", WNRF FLANGE, ANSI - 600# (B 16.5) |
| 306 | 4\", WNRF FLANGE, ANSI - 600# (B 16.5) |
| 307 | 3\", WNRF FLANGE, ANSI - 600# (B 16.5) |
| 308 | 2\", WNRF FLANGE, ANSI - 600# (B 16.5) |
| 309 | 1\", WNRF FLANGE, ANSI - 600# (B 16.5) |
| 310 | Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document |
| 311 | 16\", WNRF FLANGE, ANSI - 900# (B 16.5) |
| 312 | 12\", WNRF FLANGE, ANSI - 900# (B 16.5) |
| 313 | 2\", WNRF FLANGE, ANSI - 900# (B 16.5) |
| 314 | 1\", WNRF FLANGE, ANSI - 900# (B 16.5) |
| 315 | Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: |
| 316 | 18\", BLRF FLANGE, ANSI - 150# (B 16.5 |
| 317 | 12\", BLRF FLANGE, ANSI - 150# (B 16.5) |
| 318 | 10\", BLRF FLANGE, ANSI - 150# (B 16.5) |
| 319 | 6\", BLRF FLANGE, ANSI - 150# (B 16.5) |
| 320 | 4\", BLRF FLANGE, ANSI - 150# (B 16.5) |
| 321 | 3\", BLRF FLANGE, ANSI - 150# (B 16.5) |
| 322 | 2\", BLRF FLANGE, ANSI - 150# (B 16.5) |
| 323 | 1\", BLRF FLANGE, ANSI - 150# (B 16.5) |
| 324 | Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: |
| 325 | 3\", BLRF FLANGE, ANSI - 300# (B 16.5)-ASTM A350 LF2 |
| 326 | 2\", BLRF FLANGE, ANSI - 300# (B 16.5)-ASTM A350 LF2 |
| 327 | 1\", BLRF FLANGE,ANSI - 300# (B 16.5)-ASTM A350 LF2 |
| 328 | Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: |
| 329 | 18\", BLRF FLANGE, ANSI - 600# (B 16.5) |
| 330 | 16\", BLRF FLANGE, ANSI - 600# (B 16.5) |
| 331 | 12\", BLRF FLANGE, ANSI - 600# (B 16.5) |
| 332 | 8\", BLRF FLANGE, ANSI - 600# (B 16.5) |
| 333 | 6\", BLRF FLANGE, ANSI - 600# (B 16.5) |
| 334 | 4\", BLRF FLANGE, ANSI - 600# (B 16.5) |
| 335 | 3\", BLRF FLANGE, ANSI - 600# (B 16.5) |
| 336 | 2\", BLRF FLANGE, ANSI - 600# (B 16.5) |
| 337 | 1\", BLRF FLANGE, ANSI - 600# (B 16.5) |
| 338 | Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: |
| 339 | 16\", BLRF FLANGE, ANSI - 900# (B 16.5) |
| 340 | 12\", BLRF FLANGE, ANSI - 900# (B 16.5) |
| 341 | 2\", BLRF FLANGE, ANSI - 900# (B 16.5) |
| 342 | 1\", BLRF FLANGE, ANSI - 900# (B 16.5) |
| 343 | Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document |
| 344 | 18\", SORF FLANGE, ANSI - 150# (B 16.5) |
| 345 | 12\", SORF FLANGE, ANSI - 150# (B 16.5) |
| 346 | 10\", SORF FLANGE, ANSI - 150# (B 16.5) |
| 347 | 6\", SORF FLANGE, ANSI - 150# (B 16.5) |
| 348 | 4\", SORF FLANGE, ANSI - 150# (B 16.5) |
| 349 | 3\", SORF FLANGE, ANSI - 150# (B 16.5) |
| 350 | 2\", SORF FLANGE, ANSI - 150# (B 16.5) |
| 351 | 1\", SORF FLANGE, ANSI - 150# (B 16.5) |
| 352 | SPECTACLE BLINDS:Supply and delivery of following mentioned Spectacle Blinds at respective stations as per Station wise Break up of material supply and as per technical specifications indicated in tender docuemnts. (As per ASME B16.48): |
| 353 | 4\" Spectacle Blind 300# F/F A/G - ASTM A350 LF2 |
| 354 | 3\" Spectacle Blind 300# F/F A/G - ASTM A350 LF2 |
| 355 | 2\" Spectacle Blind 300# F/F A/G - ASTM A350 LF2 |
| 356 | 1\" Spectacle Blind 300# F/F A/G - ASTM A350 LF2_ |
| 357 | 18\" Spectacle Blind 600# F/F A/G - ASTM |
| 358 | 16\" Spectacle Blind 600# F/F A/G - ASTM |
| 359 | 12\" Spectacle Blind 600# F/F A/G - ASTM A105 |
| 360 | 8\" Spectacle Blind 600# F/F A/G - ASTM A105 |
| 361 | 6\" Spectacle Blind 600# F/F A/G - ASTM A350 LF2 |
| 362 | 4\" Spectacle Blind 600# F/F A/G - ASTM A350 LF2 |
| 363 | 2\" Spectacle Blind 600# F/F A/G - ASTM A350 LF2 |
| 364 | 1\" Spectacle Blind 600# F/F A/G - ASTM A350 LF2 |
| 365 | 16\" Spectacle Blind 900# F/F A/G - ASTM A10 |
| 366 | 12\" Spectacle Blind 900# F/F A/G - ASTM A105 |
| 367 | 2\" Spectacle Blind 900# F/F A/G - ASTM A350 LF2 |
| 368 | 1\" Spectacle Blind 900# F/F A/G - ASTM A350 LF2 |
| 369 | Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supplyand as per technical sp ecifications from approved vendors specified in tender document: |
| 370 | 18\"x 16\" ANSI 150# UnEqual Tee |
| 371 | 18\"x 12\" ANSI 150# UnEqual Tee |
| 372 | 18\"x 10\" ANSI 150# UnEqual Tee |
| 373 | 12\" x 4\" ANSI 150# Un Equal Tee |
| 374 | 10\" x 6\" ANSI 150# Un Equal Tee |
| 375 | Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supplyand as per technical sp ecifications from approved vendors specified in tender document |
| 376 | 4\"x3\" 300# Unequal Tee -ASTM A420 Gr.WPL6 _E.4 |
| 377 | 4\"x2\" 300# Unequal Tee -ASTM A420 Gr.WPL6 |
| 378 | 4\"x1\" 300# Unequal Tee -ASTM A420 Gr.WPL6 |
| 379 | 3\"x2\" 300# Unequal Tee -ASTM A420 Gr |
| 380 | 3\"x1\" 300# Unequal Tee -ASTM A420 Gr.WPL6 |
| 381 | 2\"x1\" 300# Unequal Tee -ASTM A420 Gr.WPL6 |
| 382 | Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supplyand as per technical sp ecifications from approved vendors specified in tender document |
| 383 | 18\"x16\" x 600# Unequal tee |
| 384 | 18\"x8\" x 600# Unequa |
| 385 | 16\"x12\" x 600# Unequal tee |
| 386 | 16\"x8\" x 600# Unequal tee |
| 387 | 8\"x6\" 600# Unequal Tee |
| 388 | 8\"x4\" 600# Unequal Tee |
| 389 | Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per technical spe cifications from approved vendors specified in tender document: 6\"x2\" 600# Unequal Tee |
| 390 | 3\"x2\" 600# Un Equal Tee |
| 391 | 3\"x1\" 600# Un Equal Tee |
| 392 | 2\"x1\" 600# Un Equal Tee |
| 393 | Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supplyand as per technical sp ecifications from approved vendors specified in tender document |
| 394 | 16\" x 12\" x 900# Unequal tee |
| 395 | 2\"x1\" 900# Un Equal Tee |
| 396 | Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supplyand as per technical sp ecifications from approved vendors specified in tender document |
| 397 | 18\" X 150# Equal Tee |
| 398 | 10\" ANSI 150# Equal Tee |
| 399 | Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supplyand as per technical sp ecifications from approved vendors specified in tender document: |
| 400 | 4\" 300# Equal Tee - ASTM A420 Gr.WPL6 |
| 401 | 3\" 300# Equal Tee - ASTM A420 Gr.WPL6 |
| 402 | 2\" 300# Equal Tee - ASTM A420 Gr.WPL6 |
| 403 | 1\" 300# Equal Tee - ASTM A420 Gr.WPL6 |
| 404 | Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supplyand as per technical sp ecifications from approved vendors specified in tender document |
| 405 | 18\" x 600# Equal Tee |
| 406 | 16\" x 600# Equal Tee |
| 407 | 8\" 600# Equal Tee - WPHY 52 |
| 408 | 6\" 600# Equal Tee |
| 409 | 4\" 600# Equal Tee |
| 410 | 3\" ANSI 600# Equal Tee |
| 411 | 2\" ANSI 600# Equal Tee |
| 412 | 1\" ANSI 600# Equal Tee |
| 413 | Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supplyand as per technical sp ecifications from approved vendors specified in tender document |
| 414 | 16\" x 900# Equal Tee - WPHY-70- (SCH -STD ) |
| 415 | 12\" ANSI 900# Equal Tee |
| 416 | 3\" ANSI 900# Equal Tee |
| 417 | 2\" x 900# Equal Tee |
| 418 | 1\" x 900# Equal Tee |
| 419 | Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supplyand as per technical sp ecifications from approved vendors specified in tender document |
| 420 | 18\" ANSI 150# 90 deg LR Bends |
| 421 | 12\" ANSI 150# 90 deg LR Bends |
| 422 | 10\" ANSI 150# 90 deg LR Bends |
| 423 | 6\" ANSI 150# 90 deg LR Bends |
| 424 | 4\" ANSI 150# 90 deg LR Bends |
| 425 | 3\" ANSI 150# 90 deg LR Bends |
| 426 | 2\" ANSI 150# 90 deg LR Bends |
| 427 | 1\" ANSI 150# 90 deg LR Bends |
| 428 | 4\" ANSI 300# 90 deg LR Bends -ASTM A420 Gr.WPL6 |
| 429 | 3\" ANSI 300# 90 deg LR Bends -ASTM A420 Gr.WPL6 |
| 430 | 2\" ANSI 300# 90 deg LR Bends -ASTM A420 Gr.WPL6 |
| 431 | 1\" ANSI 300# 90 deg LR Bends -ASTM A420 Gr.WPL6 |
| 432 | 18\" ANSI 600# 90 deg LR Bends WPHY-60/70, Sc |
| 433 | 16\" ANSI 600# 90 deg LR Bends WPHY-60/70, Sch. STD |
| 434 | 12\" ANSI 600# 90 deg LR Bends |
| 435 | 8\" ANSI 600# 90 deg LR Bends |
| 436 | 6\" ANSI 600# 90 deg LR Bends |
| 437 | 4\" ANSI 600# 90 deg LR Bends |
| 438 | 3\" ANSI 600# 90 deg LR Bends |
| 439 | 2\" ANSI 600# 90 deg LR Bends |
| 440 | 1\" ANSI 600# 90 deg LR Bends |
| 441 | 16\" x 900# 90 deg LR Bends |
| 442 | 12\" x 900# 90 deg LR Bends |
| 443 | 3\" x 900# 90 deg LR Bends |
| 444 | 2\" x 900# 90 deg LR Bends |
| 445 | 1\" x 900# 90 deg LR Bends |
| 446 | Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supplyand as per technical sp ecifications from approved vendors specified in tender document |
| 447 | 18\" ANSI 150# 45 deg LR Bends |
| 448 | 12\" ANSI 150# 45 deg LR Bends |
| 449 | 10\" ANSI 150# 45 deg LR Bends |
| 450 | 6\" ANSI 150# 45 deg LR Bends |
| 451 | 4\" ANSI 150# 45 deg LR Bends |
| 452 | 3\" ANSI 150# 45 deg LR Bends |
| 453 | 2\" ANSI 150# 45 deg LR |
| 454 | 1\" ANSI 150# 45 deg LR |
| 455 | 4\" x 300# 45 deg LR Bends -ASTM A420 Gr |
| 456 | 3\" x 300# 45 deg LR Bends -ASTM A420 Gr |
| 457 | 2\" x 300# 45 deg LR Bends -ASTM A420 Gr |
| 458 | 1\" x 300# 45 deg LR Bends -ASTM A420 Gr |
| 459 | 18\" x 600# 45 deg LR Bends WPHY 60/70, Sc |
| 460 | 16\" x 600# 45 deg LR Bends WPHY 60/70, Sch. STD |
| 461 | 12\" ANSI 600# 45 deg LR Bends |
| 462 | 8\" ANSI 600# 45 deg LR Bends |
| 463 | 4\" ANSI 600# 45 deg LR Bends |
| 464 | 16\" x 900# 45 deg LR Bends WPHY 70, Sch. ST |
| 465 | 12\" x 900# 45 deg LR Bends WPHY 70, Sch. STD |
| 466 | Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supplyand as per technical sp ecifications from approved vendors specified in tender document |
| 467 | 12\"x10\" x Concentric Reducer x 150# |
| 468 | 12\"x8\" x Concentric Reducer x 150# |
| 469 | 12\"x6\" x Concentric Reducer x 150# |
| 470 | 10\"x8\" x Concentric Reducer X 150# |
| 471 | 10\"x6\" x Concentric Reducer X 150# |
| 472 | 8\"x4\" x Concentric Reducer x 150# |
| 473 | 6\"x4\" x Concentric Reducer X 150# |
| 474 | 6\"x3\" x Concentric Reducer X 150# |
| 475 | 6\"x2\" x Concentric Reducer x 150# |
| 476 | 4\"x3\" x Concentric Reducer X 150# |
| 477 | 4\"x2\" x Concentric Reducer X 150# |
| 478 | 3\"x2\" x Concentric Reducer X 150# |
| 479 | 3\"x1\" x Concentric Reducer X 150# |
| 480 | 2\"x1\" x Concentric Reducer x 150# |
| 481 | 3\"X2\" x 300# Concentric Reducer -ASTM A420 Gr.WPL6 |
| 482 | 3\"X1\" x 300# Concentric Reducer -ASTM A420 Gr.WPL6 |
| 483 | 2\"X1\" x 300# Concentric Reducer -ASTM A420 Gr.WPL6 |
| 484 | 18\"x16\" x Concentric Reducer |
| 485 | 16\"x12\" x Concentric Reducer x 600# |
| 486 | 16\"x10\" x Concentric Reducer x 600# |
| 487 | 16\"x8\" x Concentric Reducer x 600# |
| 488 | 8\"x6\" x Concentric Reducer x 600# |
| 489 | 8\"x4\" x Concentric Reducer x 600# |
| 490 | 6\"x4\" x Concentric Reducer x 600# |
| 491 | 4\"x3\" x Concentric Reducer x 600# |
| 492 | 4\"x2\" x Concentric Reducerx |
| 493 | 3\"x2\" x Concentric Reducerx 600# |
| 494 | 3\"x1\" x Concentric Reducerx 600# |
| 495 | 2\"x1\" x Concentric Reducerx 600# |
| 496 | 12\"x8\" x Concentric Reducer x 900# |
| 497 | 12\"x6\" x Concentric Reducer x 900# |
| 498 | 3\"x2\" x Concentric Reducer x 900# -ASTM A420 Gr.WPL6 |
| 499 | 3\"x1\" x Concentric Reducer x 900# -ASTM A420 Gr.WPL6 |
| 500 | 2\"x1\" x Concentric Reducer x 900# -ASTM A420 Gr.WPL6 |
| 501 | Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supplyand as per technical sp ecifications from approved vendors specified in tender document |
| 502 | 1\" size 3000# St. NIPPLE |
| 503 | 1\" 3000# HALF COUPLING |
| 504 | 1X3/4\" size 3000# Reducer Nipple |
| 505 | Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supplyand as per technical sp ecifications from approved vendors specified in tender document |
| 506 | 16\"x2\" X 900# Weld-o-let |
| 507 | 12\"x2\" X 900# Weld-o-let |
| 508 | 18\"x2\" x 600# Weld- |
| 509 | 16\"x2\" x 600# Weld-o-let |
| 510 | 12\"x2\" x 600# Weld-o-let |
| 511 | 10\"x2\" x 600# Weld-o-let |
| 512 | 8\"x2\" x 600# Weld-o-let |
| 513 | 6\"x2\" x 600# Weld-o-let |
| 514 | 18\"x4\" X 150# Weld- |
| 515 | 18\"x3\" X 150# Weld- |
| 516 | 18\"x2\" X 150# Weld- |
| 517 | 12\"x2\" x 150# Weld-o-let |
| 518 | 10\"x2\" x 150# Weld-o-let |
| 519 | Supply of ASTM A106 Gr.B /A333 pipes at respective stations as per Station wise Break up of material supplyand as per technical sp ecifications from approved vendors specified in tender document. |
| 520 | 6.625\" ODx 0.280\" WT (Sch.STD) ASTM A 106 Gr B bare Pipe |
| 521 | 4.500\" ODx 0.237\" WT (Sch.STD) ASTM A 106 Gr B bare Pipe |
| 522 | 3.500\" ODx 0.216\" WT (Sch.STD) ASTM A 106 Gr B |
| 523 | 2.375\" ODx 0.218\" WT (Sch.XS) ASTM A 106 Gr B bare pipe |
| 524 | 1.315\" ODx 0.179\"WT (Sch.XS) ASTM A 106 Gr B Bare pipe |
| 525 | Supply of ASTM A106 Gr.B /A333 pipes at respective stations as per Station wise Break up of material supplyand as per technical sp ecifications from approved vendors specified in tender document. |
| 526 | 6.625\" ODx 0.280\" WT (Sch.STD) ASTM A 333 Gr 6 bare Pipe |
| 527 | 4.500\" ODx 0.237\" WT (Sch.STD) ASTM A 333 Gr 6 bare Pipe |
| 528 | 3.500\" ODx 0.216\" WT (Sch.STD) ASTM A 333 Gr 6 |
| 529 | 2.375\" ODx 0.218\" WT (Sch.XS) ASTM A 333 Gr 6 bare pipe |
| 530 | 1.315\" ODx 0.179\"WT (Sch.XS) ASTM A 333 Gr 6 Bare pipe |
| 531 | Flame Arrestor:Supply and delivery of following mentioned Flame Arrestor at respective stations as per Station wise Break up of mate rial supply and as per technical specifications indicated in tender docuemnts: |
| 532 | 4\" Flame Arrester |
| 533 | Supply of IS: 3589, Gr. Fe 410 pipes with internal coating at respective stations as per Station wise Break up of material supply a nd as per technical specifications from approved vendors specified in tender document. Cost shall be inclusive of all charges includ ing charges for bare pipe, internal coating, inpsection of materials by approved TPI, Taxes etc.Note: 1) Internal coating shall be carried out at site. 2) The rate for the Fire Water pipe is inclusive of internal coating. No separate payment shall be made for internal coating at site . |
| 534 | 18\" ODx 0.250\" WT IS3589 FE410 Pipe Sch |
| 535 | 12.75\" ODx 0.25\" WT IS3589 FE410 Pipe Sch. 20 |
| 536 | 10.75\" ODx 0.25\" WT IS3589 FE410 Pipe Sch. 20 |
| 537 | 6.625\" ODx 0.250\" WT IS3589 FE410 Pipe Sch. 20 |
| 538 | Supply of Valves at respective stations as per technical specifications from approved vendors in the tender document |
| 539 | 1\" X 1500# W/W, A/G, HOV, API 602 GATE VALVE |
| 540 | 2\" x 1500# W/W, A/G, HOV, API 6D GATE VALVE |
| 541 | Supply of Valves at respective stations as per technical specifications from approved vendors in the tender document -FOR FIRE WATERNETWORK |
| 542 | 18\"x ANSI 150# HOV F/F API 600 Gate Valve FW |
| 543 | 12\"x ANSI 150# HOV F/F API 600 Gate Valve FW |
| 544 | 10\"x ANSI 150# HOV F/F API 600 Gate Valve FW |
| 545 | 6\"x ANSI 150# HOV F/F API 600 Gate Valve FW |
| 546 | 4\"x ANSI 150# HOV F/F API 600 Gate Valve FW |
| 547 | 3\"x ANSI 150# HOV F/F API 600 Gate Valve FW |
| 548 | 2\"x ANSI 150# HOV F/F API 600 Gate Valve FW |
| 549 | 1\"x ANSI 800# HOV W/W API 602 Gate Valve FW |
| 550 | Supply of Valves at respective stations as per technical specifications from approved vendors in the tender document |
| 551 | 16\"x ANSI 900# F/F BS-1873 GLOBE Valv |
| 552 | 2\"x ANSI 900# F/F BS-1873 GLOBE Valve |
| 553 | 12\"x ANSI 600# F/F BS-1873 GLOBE Valve |
| 554 | 8\"x ANSI 600# F/F BS-1873 GLOBE Valve |
| 555 | 6\"x ANSI 600# F/F BS-1873 GLOBE Valve |
| 556 | 4\"x ANSI 600# F/F BS-1873 GLOBE Valve |
| 557 | 3\"x ANSI 600# F/F BS-1873 GLOBE |
| 558 | 2\"x ANSI 600# F/F BS-1873 GLOBE Valve |
| 559 | 3\"x ANSI 300# F/F BS-1873 GLOBE |
| 560 | 2\"x ANSI 300# F/F BS-1873 GLOBE Valve |
| 561 | 1\"x ANSI 800# W/W BS-1873 GLOBE VALVE |
| 562 | 1\"x ANSI 1500# W/W BS-1873 GLOBE VALVE |
| 563 | Supply of Valves at respective stations as per technical specifications from approved vendors in the tender document |
| 564 | 10\"x ANSI 150# F/F BS-1868 Swing Check Valv |
| 565 | 3\"x ANSI 150# F/F BS-1868 Swing Check Valve |
| 566 | 2\"x ANSI 150# F/F BS-1868 Swing Check Valve |
| 567 | Supply of Valves at respective stations as per technical specifications from approved vendors in the tender document |
| 568 | 1\" x 1\" 900# x300# F/F TRV |
| 569 | 1\" x 1\" 600# x300# F/F TRV |
| 570 | 1\" x 1\" 300# x300# F/F TRV |
| 571 | Supply of Safet valve for Fire Fighting Line |
| 572 | Spring Loaded Pressure Safety Valve, 6\" x 8\" 150# x 150# F/ |
| 573 | Supply of Fire Fighting Monitor/hydrant: High Volume Long Range HVLR Foam Monitor 750 GPM capacity stand post typewith inlet flang e of 4\" X 150# |
| 574 | Supply of Fire Fighting Monitor/hydrant: Stand Post Type double way fire hydrant fitted with 2 Nos of single landing valve complete as per IS: 5290 alongwith 4\" x 150# WNRF Flange |
| 575 | FIRE FIGHTING EQUIPMENT: Supply and delivery of Fire Fighting Equipment at respective stations as per Station wise Break up of mater ial supply and as per technical specifications from approved vendors specified in tender document. |
| 576 | 75 kg DCP Extinguisher |
| 577 | 9 kg DCP Extinguisher |
| 578 | 4.5 kg CO2 Extinguisher |
| 579 | 2.5 kg clean agent extinguishers IS 15683 Marked |
| 580 | 2 kg clean agent extinguishers IS 15683 Marked |
| 581 | Fire Hose Box for keeping 2 Nos. of 15 M Type B delivery hose and one no. jet nozzle |
| 582 | Type B Delivery Hoses of 15 M length bearing IS-636 mark |
| 583 | Jet Nozzles |
| 584 | Fog Nozzle |
| 585 | Universal Nozzle |
| 586 | Foam Branch pipe |
| 587 | Water curtain nozzle |
| 588 | Sand drum with scoop |
| 589 | Pair of Rubber hand gloves for Electrical work bearing IS mark |
| 590 | First Aid Box with Snake serum |
| 591 | Fire Bucket |
| 592 | Safety Helmet |
| 593 | Strecher WITH BLANKET |
| 594 | Explosimeter |
| 595 | Rescuscitor |
| 596 | Electrical Siren |
| 597 | Hand Operated siren |
| 598 | Water gel blanket |
| 599 | Safety Torch |
| 600 | Wind socks |
| 601 | PA system/ Loudhailer/ megaphone |
| 602 | Red & Green flag (Pairs) 2 nos in each colour |
| 603 | Extinguisher box for 9 kg DCP Extinguishers |
| 604 | Dry Chemical Powder silliconised potassiun bicarbonate type IS marked, pack in 10Kg |
| 605 | CO2 cartridge - 200 gm capacity for 9 kg |
| 606 | CO2 cartridge - 3.2 kg capacity for 75 kg DCP extinguisher |
| 607 | Corrosion Coupon: Supply of TOR Fitting Complete With Plug & Cap and Full bore Threaded BallValve: TOR fitting complete with Caps,Plugs, O-Rings, Nipple & 2\" 600# full bore threaded ball valve. |
| 608 | Corrosion Coupon: |
| 609 | Supply of TOR Fitting Complete With Plug & Cap and Full bore Threaded Ball Valve: RETRACTABLE CORROSION COUPON HOLDER, |
| 610 | Supply of TOR Fitting Complete With Plug & Cap and Full bore Threaded Ball Valve: RETRACTABLE CORROSION COUPON HOLDER, |
| 611 | Supply of Y-type strainer(Cast /Plate Fabricated Body), F/F connection, as per below mentioned sizes & rating and flow detail and asper technical specifications indicated in tender documents. ( Each strainer shall be supplied with 1 set of companion WNRF Flanges,Gaskets & Fasteners,02 Nos. cover Gaskets, 1 filter elemen |
| 612 | - Y-type Strainer 12\" x ANSI 150 |
| 613 | - Y-type Strainer 4\" x ANSI 150# |
| 614 | - Y-type Strainer 3\" x ANSI 150# |
| 615 | Supply of Water filling Pumping Unit: |
| 616 | Vertical Submersible type Motor Driven Water filling Pumping Unit with Spares and Commissioning Services as per technical specific ations. (Q=30 Kl/Hr.,H= 40 MCL) |
| 617 | Supply and delivery of Fire Fighting Equipment at respective stations as per Station wise Break up of material supply and as per tec hnical specifications from approved vendors specified in tender document |
| 618 | Diesel Engine Driven Horizontal Centrifugal Pumping Unit For Water displacement/Fire Fighting System ( Q= 675 Kl/Hr and H= 105 MCL ) with Spares and Commissioning Services as per technical specifications. |
| 619 | \"Jockey Pump Unit with Q-10 Kls/Hr, H-88 MCL with Spares and Commissioning Services as per technical specifications. |
| 620 | Supply and delivery of BS 5351/ISO 17292 Ball valvefor use in process piping at respective stations as per Station wise Break up o f material supply and as per technical specifications from approved vendors specified in tender document. |
| 621 | 1\" x 800# Ball valve HOV W/W BS 5351 |
| 622 | 1\" x 1500# Ball valve HOV W/W BS 5351 |
| 623 | 2\" W/W ANSI 900# A/G, API6D BALL VALVE HOV |
| 624 | 2\" F/F ANSI 900# A/G, API6D BALL VALVE HOV |
| 625 | 2\" W/W ANSI 600# A/G, API6D BALL VALVE HOV |
| 626 | 2\" F/F ANSI 600# A/G, API6D BALL VALVE HOV |
| 627 | 2\" W/W ANSI 300# A/G, API6D BALL VALVE HOV |
| 628 | 2\" F/F ANSI 300# A/G, API6D BALL VALVE HOV |
| 629 | 3\" F/F ANSI 300# A/G, API6D BALL VALVE HO |
| 630 | 3\" F/F ANSI 300# A/G, API6D BALL VALVE |
| 631 | 3\" F/F ANSI 300# A/G, BALL VALVE BS 5351 Air Line HOV |
| 632 | 2\" F/F ANSI 300# A/G, BALL VALVE BS 5351 Air Line HOV |
| 633 | 1\" F/F ANSI 300# A/G, BALL VALVE BS 5351 Air Line |
| 634 | 1\" W/W ANSI 800# A/G, BALL VALVE BS 5351 Air Line HOV |
| 635 | 1\" F/F ANSI 600# A/G, BALL VALVE BS 5351 Air Line HOV |
| 636 | Diesel Unloading Pumping Unit Q=8 Kl/Hr, H =30 M.Horizontal Pump, complete assembly with Flame proof Motor mounted on common base plate, discharge pipe with flange and companion flange, suction strainer with Spares and Commissioning Servicesas per technical specifications |
| 637 | Supply of Fuel Oil tank at respective locations as per technical specifications of the tender: Supply and delivery of 20 KL MS Fuel Oil tank with external coating_V. |
| 638 | \"NOTE:-THE ABOVE RATE SHALL BE INCLUSIVE OF ALL TAXES & DUTIES, ROYALTIES, CESS, ENVIORMENTAL & POLLUTION, FITNESS & SAFETY CLEARANCE CHARGES (IF ANY), OR ANY OTHER INCIDENTAL CHARGES ETC BUT EXCLUDING GST.\" |
Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy