| 1 | Providing and laying up to floor five level reinforced cement concrete in kerbs, steps and the like excluding the cost of centering,shuttering,finishingandreinforcement |
| 2 | with 1:1.5:3 (1 cement : 1.5 coarse sand (zone III) derived fromnatural sources : 3 graded stone aggregate 20 mm nominalsize derived from natural sources). |
| 3 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo Mechanically Treated bars of grade Fe 500D or more. |
| 5 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works |
| 6 | Applying priming coat: With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works |
| 7 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two or more coats on new work |
| 8 | Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. |
| 9 | Painting (one or more coats) on rain water, soil waste and vent pipes and fittings with synthetic enamel paint of approved brand and manufacture and required colour on old work : 150 mm diameter pipes |
| 10 | Finishing walls with Acrylic Smooth exterior paint of required shade :Old work (Two or more coat applied @ 1.67 ltr/ 10 sqm) on existing cement paint surface |
| 11 | Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq.meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer in Charge.With cement mortar 1:4 (1cement: 4 coarse sand) |
| 12 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer incharge. |
| 13 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer in charge, beyond 50 m initial lead, for all leads including all lifts involved. |
| 14 | \"Providing and applying integral crystalline slurry of hydrophilic in nature for waterproofing treatment to the RCC structures like retaining walls of the basement, water tanks, roof slabs, etc.with following steps ....., i)Proper cleaningof the surface areas thoroughly,remove all the loose materials, loose concrete & filling of cracks using Polymer Modified Mortar (1:4) 1 Cement: 4 fine Sandmixed 5% of Dr. Fixit URP SBR latex by weight of cement.ii)Providing & grouting of construction joints cementitious grout into each nozzles (1 mtr c/c) with Dr. Fixit Pidicrete AM225 gms per 50 kg cement at regular intervals as per the requirements and making fillets at the junction of the walls and the slabs using cement mortar of 1:4 (1cement: 4 fine sand) admixed with 5 % of Dr.fixit URPSBR latex by weight of cement For vertical surface two coats @ 0.70 kg per sqm. iii)Applying 3 coats of Dr.fixit Fastflex2 component, pre packed, polymer modified cementitious coating applied@ 3kg/sq.mtr all over the wall and slab of tank including the angular fillets. Finally sprinkling sand over the third coat for better adhesion with plaster. The interval between each coat of coating application is 6 8 hrs.iv) Providing and applying 20 25 mm thick plaster with Cement mortar 1:4 (1cement: 4coarse sand)admixed with Dr. Fixit LW+ integral waterproofing compound@ 0.2litre/bag of cementincluding curing etc. complete.\" |
| 15 | Withthickness of top plaster 2025 mm and . |
| 16 | Repairing and Painting, Lettering of water indicator system, floting ball with rope wire, pully etc. and making functional in proper way complete in all respect. Existing Indicator |