| 1 | Dismentling of old plaster etc all comp |
| 2 | Dismnetling of old CC floor etc all comp |
| 3 | Dismentling of old brick work etc all comp |
| 4 | E/W cutting or filling etc all comp |
| 5 | E/W in excavation in ordinary soil etc all comp |
| 6 | P/L CC in 1:6:12 cement c.sand etc all comp |
| 7 | MB-150 B/W in 1:4 cement and c.sand etc all comp |
| 8 | MB-150 B/W in 1:4 cement and c.sand etc all comp |
| 9 | P/L CC 1:2:4 contained etc all comp |
| 10 | 12mm thick plaster in 1:3 cement c.sand mortar etc all comp |
| 11 | Providing Bira putty one coat etc all comp |
| 12 | Providing with appex paint two etc all comp |
| 13 | P/L painting paint of grill and gate etc all comp |
| 14 | P/L Chekered tiles etc all comp |
| 15 | Disposal of earth upto 4km distance etc all comp |
| 16 | Cartage of material by head load upto 3 chain etc all comp |
| 17 | S/F benches etc all comp |
| 18 | MS or fabrication work etc alll comp |
| 19 | S/F open GYM shoulder pull |
| 20 | S/F of leg press double etc all comp |
| 21 | S/F of single shoulder pull etc all comp |
| 22 | S/F of chest press etc all comp |
| 23 | S/F of shoulder press etc all comp |
| 24 | S/F of jhula Sliding type |
| 25 | S/F of jhula Two seater swing |
| 26 | S/F of sisa jhoola etc all comp |
| 27 | P/L water storage tank etc all comp |
| 28 | Construction of chabutra etc all comp |
| 29 | Supply and installation of leeg press etc all comp |
| 30 | S/I of chest etc all comp |
| 31 | Cross outdoor gym etc all comp |
| 32 | S/I of shoulder wheel outdoor gym etc all comp |
| 33 | Deduct the cost of old Bricks |
| 34 | Deduct the cost of old Bats |