Mce / Dstfist / Equipment / 2021 / 001 Equipment For Dst Fist Project , Training Setup , Training Setup - 1 Proximity Sensor, Limit Switch And Encoder Training Setup, As Per Section V And Section Viof Tedner Document , Training Setup -2
Tender Overview
Project Description
Mce / Dstfist / Equipment / 2021 / 001 Equipment For Dst Fist Project , Training Setup , Training Setup - 1 Proximity Sensor, Limit Switch And Encoder Training Setup, As Per Section V And Section Viof Tedner Document , Training Setup -2 Diffused Beam And Through Beam Sensors Training Setup, As Per Section V And Section Viof Tedner Document , Training Setup -3 Level Control Measurement Training Setup, With Plc As Per Section V And Section Viof Tedner Document , Training Setup -4 Flow And Volume Control Training Setupas Per Section V And Section Viof Tedner Document , Training Setup -5 Temperature Control Training Setup, As Per Section V And Section Viof Tedner Document , Training Setup-6 Rotary Indexing Table With Stepper Motor And Pneumatic Pusher Training Setupwithout Plc, As Per Section V And Section Viof Tedner Document , Training Setup -7 Servo Drive Training Setupwithout Plc , Training Setup -8 Variable Frequency Drive [ Vfd ] Training Setupwithout Plc , Training Setup -9 Batching Plant With Load Cell Without Plc, As Per Section V And Section Viof Tedner Document , Training Setup -10 X – Y Plotter Training Setupwithout Plc, As Per Section V And Section Viof Tedner Document , Training Setup -11 Multipurpose Automation Training Setupwith Plc And Scada Hmi, As Per Section V And Section Viof Tedner Document , Training Setup -12 Electroplating Plant Without Plc, As Per Section V And Section Viof Tedner Document , Training Setup -13 3 Station Lift ( Table Top Model ) With Motor, Sensors, Door Limit Switch Push Buttons Etc., Without Plc, As Per Section V And Section Viof Tedner Document , Training Setup -14 Hydraulic Controlled Material Lift Without Plc, As Per Section V And Section Viof Tedner Document , Trainingsetup-15 Pear To Pear Network With Plc, Scada Andremote I / O With Cloud Interface, As Per Section V And Section Viof Tedner Document
BOQ
| Sl. No. | Item Description |
| 1 | Training Setup |
| 2 | TRAINING SETUP - 1Proximity sensor, Limit Switch and Encoder Training Setup,As per section V and Section VIof Tedner Document |
| 3 | TRAINING SETUP -2 Diffused Beam and through Beam sensors Training Setup, As per section V and Section VIof Tedner Document |
| 4 | TRAINING SETUP -3 Level Control Measurement Training Setup,with PLC As per section V and Section VIof Tedner Document |
| 5 | TRAINING SETUP -4 Flow and volume control Training SetupAs per section V and Section VIof Tedner Document |
| 6 | TRAINING SETUP -5 Temperature control Training Setup, As per section V and Section VIof Tedner Document |
| 7 | TRAINING SETUP-6Rotary indexing table with stepper motor and pneumatic pusher Training Setupwithout PLC, As per section V and Section VIof Tedner Document |
| 8 | TRAINING SETUP -7 Servo drive Training Setupwithout PLC |
| 9 | TRAINING SETUP -8 Variable Frequency Drive [VFD] Training Setupwithout PLC |
| 10 | TRAINING SETUP -9Batching Plant with Load Cell without PLC, As per section V and Section VIof Tedner Document |
| 11 | TRAINING SETUP -10X – Y Plotter Training Setupwithout PLC, As per section V and Section VIof Tedner Document |
| 12 | TRAINING SETUP -11Multipurpose Automation Training Setupwith PLC and scada HMI, As per section V and Section VIof Tedner Document |
| 13 | TRAINING SETUP -12 Electroplating Plant Without PLC, As per section V and Section VIof Tedner Document |
| 14 | TRAINING SETUP -13 3 station lift (table top model) with motor, sensors, door limit switch push buttons etc., without PLC, As per section V and Section VIof Tedner Document |
| 15 | TRAINING SETUP -14Hydraulic controlled material lift without PLC, As per section V and Section VIof Tedner Document |
| 16 | TRAININGSETUP-15Pear to Pear Network with PLC, SCADA andRemote I/O with cloud interface, As per section V and Section VIof Tedner Document |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
Completed