National Project Implementation Unit has published Mce / Dstfist / Equipment / 2021 / 001 Equipment For Dst Fist Project , Training Setup , Training Setup - 1 Proximity Sensor, Limit Switch And Encoder Training Setup, As Per Section V And Section Viof Tedner Document , Training Setup -2 . Submission Date for this Tender is 19-10-2021. Heavy Equipment Component Tenders in MALNAD COLLEGE OF ENGINEERING HASSAN Karnataka. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Training Setup |
2 | TRAINING SETUP - 1 Proximity sensor, Limit Switch and Encoder Training Setup,As per section V and Section VIof Tedner Document |
3 | TRAINING SETUP -2 Diffused Beam and through Beam sensors Training Setup, As per section V and Section VIof Tedner Document |
4 | TRAINING SETUP -3 Level Control Measurement Training Setup,with PLC As per section V and Section VIof Tedner Document |
5 | TRAINING SETUP -4 Flow and volume control Training SetupAs per section V and Section VIof Tedner Document |
6 | TRAINING SETUP -5 Temperature control Training Setup, As per section V and Section VIof Tedner Document |
7 | TRAINING SETUP-6 Rotary indexing table with stepper motor and pneumatic pusher Training Setupwithout PLC, As per section V and Section VIof Tedner Document |
8 | TRAINING SETUP -7 Servo drive Training Setupwithout PLC |
9 | TRAINING SETUP -8 Variable Frequency Drive [VFD] Training Setupwithout PLC |
10 | TRAINING SETUP -9 Batching Plant with Load Cell without PLC, As per section V and Section VIof Tedner Document |
11 | TRAINING SETUP -10 X – Y Plotter Training Setupwithout PLC, As per section V and Section VIof Tedner Document |
12 | TRAINING SETUP -11 Multipurpose Automation Training Setupwith PLC and scada HMI, As per section V and Section VIof Tedner Document |
13 | TRAINING SETUP -12 Electroplating Plant Without PLC, As per section V and Section VIof Tedner Document |
14 | TRAINING SETUP -13 3 station lift (table top model) with motor, sensors, door limit switch push buttons etc., without PLC, As per section V and Section VIof Tedner Document |
15 | TRAINING SETUP -14 Hydraulic controlled material lift without PLC, As per section V and Section VIof Tedner Document |
16 | TRAININGSETUP-15 Pear to Pear Network with PLC, SCADA andRemote I/O with cloud interface, As per section V and Section VIof Tedner Document |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail