Construction Of Cement Concrete Wall Jacketing With Bed Treatment Of Dehgam Khul From Down Stream Road Of Kalantra To H / O Ghulam Rasool Mir Rd 1139- Rd1546m At Mongam Construction Of Cement Concrete Wall Jacketing With Bed Treatment Of Dehgam Khul
Tender Overview
Project Description
Construction Of Cement Concrete Wall Jacketing With Bed Treatment Of Dehgam Khul From Down Stream Road Of Kalantra To H / O Ghulam Rasool Mir Rd 1139- Rd1546m At Mongam Construction Of Cement Concrete Wall Jacketing With Bed Treatment Of Dehgam Khul From Down Stream Road Of Kalantra To H / O Ghulam Rasool Mir Rd 1139- Rd1546m At Mongam
BOQ
| Sl. No. | Item Description |
| 1 | Earth work in bulk excavation- by manual means (over areas exceeding 30cmin depth, 1.5 mtr width as well as 10 sqm on plan) includingdisposalof excavated earth upto 1mtr from the cutting edge, disposedearth to be levelled and neatly dressed all Kinds of soil (Qty as per Drawing). |
| 2 | Providing and laying of stone soling (Hand packed) on Level |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:4:8 (1 cement: 4 coarse sand: 8 graded stone aggregate 40mm nominal size) |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size) |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 20mm nominal size) |
| 6 | Centering shuttering, strutting and propping etc and removal ofform work in: Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. |
| 7 | 1:4 mix cement plaster fine sand |
| 8 | Carriage of material by mechanical transport from available source to dumping site of work including loading, unloading, stacking etc.Boulders (Avg. Lead =05kms) |
| 9 | 40mm aggAvg lead 20kms) |
| 10 | 20mm agg (Avg lead 20kms) |
| 11 | Sand:(Avg. Lead20kms) |
| 12 | Cement (Avg. Lead =20km) |
| 13 | Carriage of material by manual transport from dumping site to actual site of work including loading, unloading, stacking etc.(Avg. Lead 100Mtr). Boulders |
| 14 | 40mm Agg |
| 15 | 20mm Agg |
| 16 | Sand |
| 17 | Cement |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender