| 1 | Dismantling of RCC/CC workincluding stacking of materials as directed by the engineer in-charge within a distance of 60 mtr. S.I. No-694 |
| 2 | Dismantling brick work in cement mortar including stacking of materials as directed by the engineer in-charge within a distance of 60 mtr. S.I. No-692 |
| 3 | Recoveries ofbrick bats obtained from dismantling of brick work. (Basic Rate) |
| 4 | Dismantling/ taking out existing railing of bridge including stacking of materials as directed by the engineer in-charge within a distance of 60 mtr. S.I. No-702 |
| 5 | Mild steel or iron work in M.S. grills/Stair case railing/gates/truses/racks etc., wrought to required form including supply of steel bolts, nuts, wastage etc., and their fixing required for proper completion of the work. (PWD S.I. No. 502 A) |
| 6 | Same as in item no-5 above but in heavy sizes such as trusses built up gates record racks, roof work., gates etc. including rivetting or welding where necessary (S.I. 503) |
| 7 | Fixing railings in position including embadding railing in walls, cutting masonry for hold fasts, embadding hold fasts in cement concrete blocks including making good the damages to walls as required complete including disposal of rubbish as per direction of engineer in-charge. (Labour Rate Only) New item/ ch-10, M.S. OR Iron work. |
| 8 | Cement concrete with 2cm. guage approved stone ballast, coarse sand & cement in the proportion of 1:1.5:3 including supply of all materials, labour, Tools & Plants etc. required for proper completion of the work. |
| 9 | Excavation in foundation in ordinary soil including lift upto 1.50M and lead upto 30M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal & disposal of surplus earth as directed by E/I upto a distance of 30M from foundation trenches. SI .251a |
| 10 | Concrete with 4cm guage stone ballast,course sandand cement in proportion of 12:6:1 in foundation and under floorsincluding all material, labour, T&P etc. required for proper completion of work. including cost of binding wire (SOR No 273). |
| 11 | M-150 Brick work in1:4 cement & four coarse sandin foundation and plinth including supply of allmaterials, labour, Tools & plants etc. required for proper completion of the work. SI-305(a) |
| 12 | 12 cm thick plaster with cement and coarse sand of 1.25 fineness modulus in motar 1:4 over brick work minimum thickness plinth with cement and coarse sand.S.I.no-584(a) |
| 13 | Paintings orVarnishingon iron work or new wood work with one coat of ready mix priming paint and two coats of approved superior quailty ready mixed paint or clear synthetic varnish ( Berger, dulux,, Narolac, Shalimar) including supply of all materials, Labour,T&P etc. required for proper complete of the work. pain to be usedshould confirm to the ISI no. 1950 (PWD SI. No-641+642) |
| 14 | Artistic drawing/pinting work mm sheet on wall with attrative muticolour paint as per direction of Engineer in-charge over and including painting too or more coats with approved supperior quality ready mixed paint over one coat of ready mixed priming paint including supply of all materials labour T&P etc. required for proper completion of the work. |
| 15 | RCC work with cement approved coarse sand and 2cm (3/4\") gauge approved stone ballast in the proportin 1:11/2:3 (1cement: 4.5 aggregates) in lighter beam, excluding of supply of reinforcement and its bending but including its fixing and bindingthe same with 24 BWGGI binding wire and including necessary centering & shuttering etc and also including supply of all material, labour, T&P etc. required for proper completion of work. including cost of binding wire (SOR No 285+diff of cement) |
| 16 | M.S. (tor steel or plain) in Plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel & its wastage, bend, hooks and authorised overlapping shall be measured and including cost of binding wire.S.I. No-504 |
| 17 | Provding and erecting direction and place identification Retro reflectiorised sign as per IRC-67 made of high intersity grade sheeting the retro-relfective sheeting type-IV shall be tested for 3 year outdoor weathering test in Indian conditions as per IRC 67-2012 & proof of the same in form of Goverment report shall be uploaded while quoting tender vide Mor & TH clause 801.3 fixed over aluminium sheeting 2mm thick iwth area exceeding 0.9 sqm supported on a miled steel angle iron post 75x75x6mm firmly fixed to the groud ny means of property designed foundation with M-15 grade cement concrete 45x45x60cm below ground level as per apporved drawing complete. as per direction En-in-charge. Note : The composite warranty jointly signed by original manufacturer & authorized converter of at least 7 years shall be furnished on non judical stamp of required denomination both for retro reflective sheet and also complete signage. S.I. No-New Item at s.no 2 |