Asb And Ldb Asb And Ldb , Design, Engineering, Manufacturing, Supply, Painting, Assembly, Packing, Inspection ( Third Party Inspection ) And Testing, Transport At Site, Supervision Of Installation, Testing And Commissioning At Site, Including Mandatory, Commissioning Spares, Tools & Tackles If Any Required, Documentation And Providing Guarantee For Asb & Ldb Located At Iocl, Dumad Plant. Scope Shall Be In Accordance With The Requirements Stated In This Requisition, Specification, Industry Codes & Standard And Local Rules & Regulations As Applicable And All The Attached Documents Enclosed As Annexure / Attachments. , 415V, 250 A, 25 Ka For 1 Sec., Ldb ( Single Front Execution ) For Main Receiving Substation ( Mrss ) With Incomers, Outgoing Feeders, Metering, Protection, And Other Requirements As Per Sld, Data Sheet, Specification And Other Documents Attached With The Material Requisition And Complete With All Accessories Required For Satisfactory Operation. , 415V, 100 A, 25 Ka For 1 Sec., Eldb ( Single Front Execution ) For Main Receiving Substation ( Mrss ) With Incomers, Outgoing Feeders, Metering, Protection, And Other Requirements As Per Sld, Data Sheet, Specification And Other Documents Attached With The Material Requisition And Complete With All Accessories Required For Satisfactory Operation. , 415V, 1600 A, 50 Ka For 1 Sec., Asb ( Single Front Execution ) For Mrss With Incomers, Outgoing Feeders, Metering, Protection, And Other Requirements As Per Sld, Data Sheet, Specification And Other Documents Attached With The Material Requisition And Complete With All Accessories Required For Satisfactory Operation. , 415V, 160 A, 25 Ka For 1 Sec., Ldb ( Single Front Execution ) For Osbl Substation With Incomers, Outgoing Feeders, Metering, Protection, And Other Requirements As Per Sld, Data Sheet, Specification And Other Documents Attached With The Material Requisition And Complete With All Accessories Required For Satisfactory Operation. , 415V, 100 A, 25 Ka For 1 Sec., Eldb ( Single Front Execution ) For Osbl Substation With Incomers, Outgoing Feeders, Metering, Protection, And Other Requirements As Per Sld, Data Sheet, Specification And Other Documents Attached With The Material Requisition And Complete With All Accessories Required For Satisfactory Operation. , 415V, 1600 A, 50 Ka For 1 Sec., Asb ( Single Front Execution ) For Osbl Substation With Incomers, Outgoing Feeders, Metering, Protection, And Other Requirements As Per Sld, Data Sheet, Specification And Other Documents Attached With The Material Requisition And Complete With All Accessories Required For Satisfactory Operation. , 415V, 160 A, 25 Ka For 1 Sec., Ldb ( Single Front Execution ) For Marketing Substation With Incomers, Outgoing Feeders, Metering, Protection, And Other Requirements As Per Sld, Data Sheet, Specification And Other Documents Attached With The Material Requisition And Complete With All Accessories Required For Satisfactory Operation. , 415V, 1000 A, 50 Ka For 1 Sec., Asb ( Single Front Execution ) For Marketing Substation With Incomers, Outgoing Feeders, Metering, Protection, And Other Requirements As Per Sld, Data Sheet, Specification And Other Documents Attached With The Material Requisition And Complete With All Accessories Required For Satisfactory Operation , 415V, 1000 A, 50 Ka For 1 Sec., Asb ( Single Front Execution ) For Drum Filling Building With Incomers, Outgoing Feeders, Metering, Protection, And Other Requirements As Per Sld, Data Sheet, Specification And Other Documents Attached With The Material Requisition And Complete With All Accessories Required For Satisfactory Operation , 415V, 160 A, 25 Ka For 1 Sec., Ldb ( Double Front Execution ) For Admin Building With Incomers, Outgoing Feeders, Metering, Protection, And Other Requirements As Per Sld, Data Sheet, Specification And Other Documents Attached With The Material Requisition And Complete With All Accessories Required For Satisfactory Operation. , 415V, 1250 A, 50 Ka For 1 Sec., Asb ( Double Front Execution ) For Admin Building With Incomers, Outgoing Feeders, Metering, Protection, And Other Requirements As Per Sld, Data Sheet, Specification And Other Documents Attached With The Material Requisition And Complete With All Accessories Required For Satisfactory Operation. Limiting Dimension Shall Be 10500 Mm ( W ) X 900 Mm ( D ) X 2400 Mm ( H ) , 415V, 1000 A, 50 Ka For 1 Sec., Asb ( Double Front Execution ) For Warehouse Building With Incomers, Outgoing Feeders, Metering, Protection, And Other Requirements As Per Sld, Data Sheet, Specification And Other Documents Attached With The Material Requisition And Complete With All Accessories Required For Satisfactory Operation. Limiting Dimension Shall Be 6500 Mm ( W ) X 900 Mm ( D ) X 2400 Mm ( H ) , 415V, 1000 A, 50 Ka For 1 Sec., Asb ( Double Front Execution ) For Workshop Building With Incomers, Outgoing Feeders, Metering, Protection, And Other Requirements As Per Sld, Data Sheet, Specification And Other Documents Attached With The Material Requisition And Complete With All Accessories Required For Satisfactory Operation. Limiting Dimension Shall Be 5800 Mm ( W ) X 900 Mm ( D ) X 2400 Mm ( H ) , Design, Engineering, Manufacturing, Supply, Painting, Assembly, Packing, Inspection ( Third Party Inspection ) And Testing, Transport At Site, Supervision Of Installation, Testing And Commissioning At Site, Including Mandatory, Commissioning Spares, Tools & Tackles If Any Required, Documentation And Providing Guarantee For Asb & Ldb Located At Jr Refinery Site. Scope Shall Be In Accordance With The Requirements Stated In This Requisition, Specification, Industry Codes & Standard And Local Rules & Regulations As Applicable And All The Attached Documents Enclosed As Annexure / Attachments. , 415V, 250 A, 25 Ka For 1 Sec., Ldb ( Double Front Execution ) For Substation-29 With Incomers, Outgoing Feeders, Metering, Protection And Other Requirements As Per Sld, Data Sheet, Specification And Other Documents Attached With The Material Requisition And Complete With All Accessories Required For Satisfactory Operation. Limiting Dimensions Shall Be 2400 Mm ( W ) X 900 Mm ( D ) X 2400 Mm ( H ) , 415V, 400 A, 50 Ka For 1 Sec., Asb ( Double Front Execution ) For Substation-29 With Incomers, Outgoing Feeders, Metering, Protection And Other Requirements As Per Sld, Data Sheet, Specification And Other Documents Attached With The Material Requisition And Complete With All Accessories Required For Satisfactory Operation. Limiting Dimensions Shall Be 3200 Mm ( W ) X 900 Mm ( D ) X 2400 Mm ( H ) , Supervision Of Installation, Testing And Commissioning Ofasb And Ldb. ( Each Board 10 Days ) . For Tag No. 900-Ldb-01 900-Eldb-01 900-Asb-01 902-Ldb-01 902-Eldb-01 902-Asb-01 934-Ldb-01 934-Asb-01 934-Asb-02 951-Ldb-01 951-Asb-01 951-Asb-02 951-Asb-03 1011-Ldb-01 1011-Asb-01 Total 150 Mandays Estimated For Site Supervision Of Installation, Testing And Commissioning. , Supervision Of Installation, Testing And Commissioning Of Ldb & Asb ( Each Board 10 Days ) At Iocl Dumad And Jr Refinery , Overtime Rate / Hour Beyond Normal 8 Hours Work On Normal Working Days. , Overtime Rate / Hour For Work On Weekly Off Days / Holidays ( As Applicable To Refinery Site ) .