Indian Oil Corporation Limited-IOCL has published Third Party Inspection Services For Inspections At Vendors / Contractors Premises Third Party Inspection Services For Inspections At Vendors / Contractors Premises. Submission Date for this Tender is 30-09-2021. Third Party Inspection Services Tenders in Mumbai Maharashtra. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 29-Sep-2021 | Bid submission date extended | Date | 30-09-2021 |
Sl. No. | Item Description |
1 | Internal Heating Coils for Additive Storage tanks for Hot Thermic oil heating provision (Qty - 25 Nos) |
2 | Finished Product (Lube) Storage Tanks – Atmospheric, Toriconical / flat bottom, Cone top, Cylindrical vertical, above ground tanks; (Qty - 26 Nos) (i.e. 3 Nos of SS 304 & 23 Nos of CS) |
3 | Internal Heating Coils for Finished Product Storage tanks for Hot Thermic oil heating provision (Qty - 45 Nos) |
4 | Above ground, Cylindrical, Horizontal storage tanks for Slop oil (Qty - 02 Nos) |
5 | Total for S.No. 2.01 -CATEGORY - A-1 : TPI SERVICES FOR SHOP FABRICATED STORAGE TANKS |
6 | A-2 : SHOP FABRICATED – PROCESS TANKS, VESSELS & COLUMNS |
7 | These cover the shop fabricated process equipment – viz. Heat Exchangers, Tanks, Vessels, Columns etc. that will be shop fabricated by the Mechanical Vendors at their own or sub-contractor’s shop.Details of work scope shall be as per RFQ Doc. (Category-A-2). |
8 | Suction Heaters & Heat Exchangers; CS (Qty - 43 Nos) |
9 | Blending or Premix Vessels – Agitated with/without Heating Coils; CS (Qty - 05 Nos) |
10 | Bituminous Lube Finishing tanks with side entry agitators(Qty - 02 Nos) |
11 | Blending or Premix Vessels – Agitated with/without Heating Coils; SS (Qty - 07 Nos) |
12 | Mini-bulk Tanks for Additive handling – Agitated with/without Heating Coils; CS (Qty - 38 Nos) |
13 | Percolation columns; CS (Qty - 10 Nos) |
14 | Rinsing Tank / Slop oil Tanks; CS (Qty - 04 Nos) |
15 | HDPE process tanks for DEF, Coolant(Qty - 09 Nos) |
16 | WO Plant Mixing Tanks with Heating Coil - CS(Qty - 02 Nos) |
17 | WO Holding Tanks & TO Finished Product tanks - CS(Qty - 08 Nos) |
18 | Finished Product Tanks for WO & BF Plant - SS(Qty - 04 Nos) |
19 | Sub-Total for S.No. 2.02 -CATEGORY - A-2 : SHOP FABRICATED – PROCESS TANKS, VESSELS & COLUMNS |
20 | A-3 : TPI FOR BULK MATERIALS & MISCELLANEOUS ITEMS |
21 | This will cover the Third party inspection for various Bulk materials, PEB works, HVAC Systems & other similar items of works as the details below. Details of work scope shall be as per RFQ Doc. (Category-A-3). |
22 | TPI FOR BULK MATERIALS |
23 | Steel plates, Structural materials of various thicknesses & sizes for Fabrication works |
24 | Cables (Aluminium & Copper) of various ratings & capacities |
25 | Pipes & Pipe fittings of various sizes |
26 | TPI FOR PRE ENGINEERED BUILDINGS (PEB) & RELATED WORKS |
27 | TPIA for Pre Engineered Buildings (PEB), Structurals, Roofing sheets, Cladding sheets, Turbo Ventilators, Gutters, Down take pipes, etc., |
28 | TPI FOR HVAC SYSTEMS |
29 | TPIA for HVAC Systems for Process block, Admin block, Laboratory, Utility block, etc., |
30 | Sub-Total for S.No. 2.03 -CATEGORY - A-3 : TPI FOR BULK MATERIALS & MISCELLANEOUS ITEMS |
31 | A-4 : PROCESS PUMPS, FILTERS, AGITATORS & MISCELLANEOUS PROCESS EQUIPMENTS |
32 | These cover the Process Pumps, Filters –that will be bought out items by the Mechanical Vendors. Details of work scope shall be as per RFQ Doc. (Category-A-4). |
33 | Positive displacement – Twin Screw pumps; CS (Qty - 122 Nos) |
34 | Positive displacement – Single Screw (peristaltic) pumps; CS (Qty - 29 Nos) |
35 | Positive displacement – Three Screw Pumps; CS (Qty - 34 Nos) |
36 | Centrifugal Pumps; SS (Qty - 29 Nos) |
37 | Filters – PP Bag; CS / PP (Qty - 60 Nos) |
38 | Filters – PP Bag; SS / PP (Qty - 25 Nos) |
39 | Superclean Filteration system; SS (Qty - 03 Nos) |
40 | DEF Filtration System (Qty - 02 Nos) |
41 | Drum Pumps (Qty - 24 Nos) |
42 | Tank Agitators (Qty - 03 Nos) |
43 | Screw Scrapper Chiller (Qty - 01 No) |
44 | Weighing Scales (Qty - 09 Nos) |
45 | Static Mixers (Qty - 07 Nos) |
46 | Exhaust Blower for VDU (Qty - 1 No) |
47 | Sub-Total for S.No. 2.04 -CATEGORY - A-4 : PROCESS PUMPS & FILTERS, AGITATORS & MISCELLANEOUS PROCESS EQUIPMENTS |
48 | A-5 : PROCESS SKIDS |
49 | These cover the Process Skids such as Vacuum Filtration System skid –that will be bought out items by the Mechanical Vendors.Details of work scope shall be as per RFQ Doc. (Category-A-5). For inspection of SKIDS, it is considered that a cross-functional team comprising of Mechanical, Electrical and Instrumentation fields – will be deputed so as to check all aspects as per the design, tie-in points & integration with the main plant system. |
50 | DM Water Treatment plant(Qty - 1 No) |
51 | Vacuum Filtration plant skids (for WO & Transformer oil plant) (Qty - 04 Nos) |
52 | Powder Handling system (for Grease, DEF, TO & Coolant plant) (Qty - 11 Nos) |
53 | Scrubber System – for Grease Plant (Qty - 04 Nos) |
54 | Sub-Total for S.No. 2.05 -CATEGORY - A-5 : PROCESS SKIDS |
55 | A-6 : CORE FILLING LINES (LOCAL) |
56 | These cover the CORE FILLING LINES that will be sourced Locally and supplied by MECHANICAL VENDOR and are proposed to be automated and complete from Unscrambler or feeding of empties to final palletization, duly synchronized to operate at the desired rated speed. Details of work scope shall be as per RFQ Doc. (Category-A-6). |
57 | Small Can filling lines(Qty - 04 Nos) a) for Lube b) for Coolant & BF c) for DEF d) for Grease |
58 | Pail Filling lines(Qty - 05 Nos) a) Lube b) DEF c) Lube Drummies (26L, 28L, 50L) d) Grease |
59 | Pallet fillers(Qty - 05 Nos) a) for Lube b) for Coolant / Brake fluid c) for DEF d) for Pilot Lube Kettle e) for BN Extract |
60 | Drum filling lines(Qty - 09 Nos) a) Bituminous Lube b) Transformer Oil c) White Oil d) REX e) Greases |
61 | Sub-Total for S.No. 2.06 - CATEGORY - A-6 : CORE FILLING LINES (LOCAL) |
62 | A-7 : UTILITY SYSTEMS |
63 | These cover the following UTILITY SYSTEMS that will be sourced Locally and supplied by MECHANICAL VENDOR Details of work scope shall be as per RFQ Doc. (Category-A-7). |
64 | Instrument and Plant Air Package :- |
65 | i) Air compressors, Heavy Duty Industrial Rotary Screw type, with 400 LPS capacity each - (2 working + 1 spare); complete with central control system for the package (Qty - 03 Nos) |
66 | ii) Air receiver with 7500 L capacity(Qty - 02 Nos) |
67 | iii) Air Dryer with 800 LPS capacity(Qty - 02 Nos) (1 working + 1 spare) |
68 | iv) Air receiver with 1.5 m3 capacity(Qty - 01 No) |
69 | v) Air receiver wih 3 m3 capacity(Qty - 01 No) |
70 | Cooling Tower Package :- |
71 | i) 600 TR Cooling Tower unit |
72 | ii) Recirculation Pumps (Qty - 02 Nos) |
73 | Chiller and Cold Oil Package :- |
74 | i) Chiller unit (2 x 125 TR) (Qty - 01 No) |
75 | ii) Chilled Water Tank of required capacity (Qty - 01 No) |
76 | iii) Gasketed Plate type Heat Exchanger (Qty - 01 No) |
77 | iv) Pumps for Chilled water (2 working + 1 spare) (Qty - 03 Nos) |
78 | v) Cold oil Tank (Qty - 01 No) |
79 | vi) Cold oil Recirculation Pumps (Qty - 02 Nos) |
80 | Thermic Fluid Heater Package :- |
81 | i) Thermic Fluid Heaters of TPD-25 (Qty - 02 Nos) |
82 | ii) Higher capacity Pumps - 200 m3/hr (2 working + 1 spare) (Qty - 03 Nos) |
83 | iii) Dearator cum Expansion Tank - 12 KL (Qty - 01 No) |
84 | iv) Thermic Fluid Heaters of TPD-15 (Qty - 01 No) |
85 | v) Higher capacity Pumps - 120 m3/hr (1 working + 1 spare) (Qty - 02 Nos) |
86 | vi) Dearator cum Expansion Tank - 6 KL (Qty - 01 No) |
87 | vii) Sump Tank - 22 KL (Qty - 01 No) |
88 | viii) Pump for Topping up Thermic oil - 6 m3/hr (Qty - 01 No) |
89 | ix) Day Tanks for Fuel oil - 990 Ltrs (Qty - 03 Nos) |
90 | x) Secondary Heating System - 12 KL (Qty - 02 Nos) |
91 | xi) Pumps for Secondary Heating System - 45 m3/hr (Qty - 02 Nos) |
92 | Non-IBR Boiler Package :- |
93 | i) Boiler unit - 300 kg/hr (Qty - 02 Nos) |
94 | ii) LDO Day Tanks - 990 Ltrs (Qty - 02 Nos) |
95 | iii) Day Tank for Water Storage - 6 KL (Qty - 01 No) |
96 | iv) Boiler Feed Water Tank - 3 KL (Qty - 01 No) |
97 | v) Condensate recycling system & Collection Tank (Qty - 01 No) |
98 | vi) Steam Separators (Qty - 02 Nos) |
99 | vi) Steam pressure reducing station - 600 kg/hr (Qty - 01 No) |
100 | vii) Filters (Qty - 04 Nos) |
101 | viii) Fuel pumps for LDO Tanks (Qty - 02 Nos) |
102 | ix) Feed water pumps (Qty - 02 Nos) |
103 | Chimney for Thermic fluid heaters & Steam Boilers – 1m dia at top x 40m high; (Qty - 01 No) |
104 | Oily Water Separator Package :- |
105 | i) OWS system - 200 LPS (for BO-1, BO-2 tank farms & TLF Gantry area) (Qty - 01 No) |
106 | ii) OWS system - 100 LPS (for Additive, FP Tank farms 1 & 2, Additive Unloading Gantry and Scrap yard areas) (Qty - 01 No) |
107 | Weighbridge, 60 MT (Qty - 02 Nos) |
108 | Fuel Storage tanks – for LDO & HSD storage (Qty - 02 Nos) |
109 | Vertical Submersible Transfer pumps for LDO & HSD with FLP motor (Qty - 02 Nos) |
110 | Vacuum Pump with Air water Separator (Qty - 01 No) |
111 | Raw Water tank (Qty - 02 Nos), Permeate Tank (Qty - 02 Nos), Reject water tanks (Qty - 02 Nos) |
112 | Sub-Total for S.No. 2.07 -CATEGORY - A-7 : UTILITY SYSTEMS |
113 | A-8 : LABORATORY EQUIPMENTS |
114 | These cover the following LABORATORY EQUIPMENTS & SYSTEMS that will be sourced Locally and supplied by PACKAGE-1 VENDOR. Details of work scope shall be as per RFQ Doc. (Category-A-8). |
115 | LUBE, GREASE AND SPECIALITY PRODUCTS TESTING EQUIPMENT |
116 | COLOUR COMPARATOR (TECH SPECS A01) (Qty - 02 Set) |
117 | AUTO DENSITYMETER (TECH SPECS A02) (Qty - 01 Set) |
118 | STABINGER VISCOMETER SVM 4001 AUTOMATIC (TECH SPECS A03) (Qty - 03 Set) |
119 | AUTOMATICVISCOMETER (TECH SPECS A04) (Qty - 02 Set) |
120 | LOW TEMPERATURE VISCOSITY BATH (0,-20,-30,-40 °C) (TECH SPECS A05) (Qty - 01 Set) |
121 | KINEMATIC VISCOSITY @ 100°C [MANUAL BATH ] FOR BITUMEN SAMPLE (TECH SPECS A06) (Qty - 03 Set) |
122 | AIR RELEASE VALUE APPARATUS AND SOFTWARE (TECH SPECS A07) (Qty - 01 Set) |
123 | COC FLASH POINTER TESTER (TECH SPECS A10) (Qty - 01 Set) |
124 | PMCC TESTER AUTOMATIC (TECH SPECS A11) (Qty - 01 Set) |
125 | FOURIER TRANSFORM INFA RED SPECTROPHOTOMETER (TECH SPECS A13) (Qty - 01 Set) |
126 | PARTICLE COUNTER (TECH SPECS A15) (Qty - 01 Set) |
127 | AUTOMATIC TITRATOR FOR TBN AND TAN (TECH SPECS A16_17) (Qty - 01 Set) |
128 | WATER SEPARABILITY CHARACTERISTIC BATH (TECH SPECS A19) (Qty - 04 Set) |
129 | FOAMING APPARATUS I II III IV (TECH SPECS A20) (Qty - 02 Set) |
130 | SHEAR STABILITY APPARATUS - BOSCH INJECTOR (TECH SPECS A24) (Qty - 01 Set) |
131 | AUTO ANILINE POINT APPARATUS (TECH SPECS A29) (Qty - 02 Set) |
132 | NITROGEN ANALYSER (TECH SPECS A32) (Qty - 01 Set) |
133 | AUTO MELTING POINT APPARATUS (TECH SPECS A33) (Qty - 01 Set) |
134 | UV - VISIBLE SPECTRO PHOTOMETER (TECH SPECS A34) (Qty - 01 Set) |
135 | REFRACTIVE INDEX -Refractometer (TECH SPECS A35) (Qty - 02 Set) |
136 | DIGITAL Ph ANALYZER (TECH SPECS A36) (Qty - 01 Set) |
137 | TDS METER (TECH SPECS A37) (Qty - 01 Set) |
138 | GAS CHROMATOGRAPH (TECH SPECS A38 &A39) (Qty - 01 Set) |
139 | GAS CHROMATOGRAPH (TECH SPECS A38 &A39) (Qty - 01 Set) |
140 | HPLC APPARATUS (HIGH PERFORMANCE LIQUID CHROMATOGRAPHY) FOR TOTAL POLAR & AROMATICS (TECH SPECS A40) (Qty - 01 Set) |
141 | PARTICLE COUNTER (TECH SPECS A15) (Qty - 01 Set) |
142 | INTERFACIAL TENSION TEST EQUIPMENT (TECH SPECS A44) (Qty - 01 Set) |
143 | OXIDATION STABILITY BATH FOR MINERAL OIL (TECH SPECS A45) (Qty - 01 Set) |
144 | ERBP (EQUILIBIRIUM REFLUX BOILING POINT ) TESTER (TECH SPECS A46) (Qty - 01 Set) |
145 | LOW TEMPERATURE VISCOSITY BATH (0,-20,-30,-40 °C) (TECH SPECS A05) (Qty - 01 Set) |
146 | FOAMING TEST APPARATUS SEQ IV (TECH SPECS A49) (Qty - 01 Set) |
147 | CIRCULATORY CORROSION TESTER (TECH SPECS A50) (Qty - 01 Set) |
148 | AUTOMATIC FREEZING POINT APPARATUS (TECH SPECS A51) (Qty - 01 Set) |
149 | VACUUM PUMP (TECH SPECS M01) (Qty - 01 Set) |
150 | WATER PURIFIER (FOR ICP/CHEMICAL PREPARATION) (TECH SPECS M02) (Qty - 02 Set) |
151 | MUFFLE FURNACE (TECH SPECS M03) (Qty - 02 Set) |
152 | HOT PLATE (TECH SPECS M04) (Qty - 07 Set) |
153 | HEATING MENTLE (TECH SPECS M05) (Qty - 09 Set) |
154 | WATER BATH (TECH SPECS M06) (Qty - 02 Set) |
155 | LABORATORY FRITZ (SET ON CONSTANT TEMPERATURE ) FOR CRMS/CHEMICALS (TECH SPECS M07) (Qty - 02 Set) |
156 | LABORATORY STIRRER (TECH SPECS M08) (Qty - 06 Set) |
157 | MILLIPORE VACUUM FILTRATION UNIT (TECH SPECS M09) (Qty - 02 Set) |
158 | SONIC VIBRATOR WATER BATH (TECH SPECS M10) (Qty - 02 Set) |
159 | MICRO BURETTE DIGITAL (TECH SPECS M11) (Qty - 04 Set) |
160 | FIXED VOLUME DISPENSERS (TECH SPECS M12) (Qty - 10 Set) |
161 | TOP LOADING BALANCE (0.01 GM LC) 1000 gm (TECH SPECS M13) (Qty - 03 Set) |
162 | TOP LOADING BALANCE (0.01 GM LC) 5000 gm (TECH SPECS M14) (Qty - 03 Set) |
163 | ANANLYTICAL BALANCE SINGLE PAN 220 GM LC 0.1 MG. (TECH SPECS M15) (Qty - 03 Set) |
164 | ANANLYTICAL BALANCE SINGLE PAN 220 GM LC 0.01 MG. (TECH SPECS M16) (Qty - 03 Set) |
165 | DESSICATORS (TECH SPECS M17) (Qty - 06 Set) |
166 | SETA TIMER-STOP WATCHES CALIBRATED (TECH SPECS M18) (Qty - 07 Set) |
167 | LABORATORY CENTRIFUGE (TECH SPECS M19) (Qty - 01 Set) |
168 | WATER CONTENT _DEAN AND STARK (TECH SPECS M20) (Qty - 02 Set) |
169 | CANON FENSKE VISCOMETER TUBES (IMPORTED) (TECH SPECS M21) (Qty - 24 Set) |
170 | THERMOMETERS (TECH SPECS M22) (Qty - 01 Set) |
171 | HOT AIR OVEN BIG (TECH SPECS M23) (Qty - 05 Set) |
172 | HOT AIR OVEN MEDIUM (TECH SPECS M24) (Qty - 05 Set) |
173 | HIGH TEMPERTURE OVEN (TECH SPECS M24A) (Qty - 02 Set) |
174 | GLASS ASSEMBLY, LOCAL GLASS WARE/EQUIPMENTSUPPLIERS (Qty - 05 Set) |
175 | GREASE PENETROMETER (TECH SPECS B01) (Qty - 03 Set) |
176 | CORROSION PREVENTIVE PROPERTIES OF LUBRICATING GREASES (TECH SPECS B02) (Qty - 01 Set) |
177 | SALT SPRAY (FOG) APPARATUS (TECH SPECS B03) (Qty - 01 Set) |
178 | WATER WASHOUT CHARACTERISTICS OF LUBRICATING GREASES APPARATUS (TECH SPECS B04) (Qty - 01 Set) |
179 | WATER SRAY APPARATUS (TECH SPECS B05) (Qty - 01 Set) |
180 | WATER - CONTENT : COULOMETER (TECH SPECS B06) (Qty - 01 Set) |
181 | ROLL STABILITYTESTER (TECH SPECS B07) (Qty - 02 Set) |
182 | OIL SEPARATION FROM LUBRICATING GREASE DURINGSTORAGE (TECH SPECS B08) (Qty - 01 Set) |
183 | OIL SEPARATIONTEST APPARATUS- CONICAL SIEVE METHOD (TECH SPECS B09) (Qty - 01 Set) |
184 | DELETERIOUS PARTICLES TESTER (TECH SPECS B10) (Qty - 01 Set) |
185 | DROPPING POINT APPARATUS - AUTOMATIC (TECH SPECS B11) (Qty - 02 Set) |
186 | AUTOMATICVISCOMETER (TECH SPECS A04) (Qty - 01 Set) |
187 | VISCOSITY OIL BATH (TECH SPECS B13) (Qty - 01 Set) |
188 | OXIDATION STABILITY TESTER FOR GREASE (TECH SPECS B14) (Qty - 01 Set) |
189 | PRESSURE DIFFERENTIAL SCANNING CALORIMETER (TECH SPECS B15) (Qty - 01 Set) |
190 | HUMIDITY CABINET (TECH SPECS B16) (Qty - 01 Set) |
191 | LOW-TEMPERATURE TORQUE APPARATUS (TECH SPECS B17) (Qty - 01 Set) |
192 | FRETTING WEAR TESTER (TECH SPECS B18) (Qty - 01 Set) |
193 | AIR CIRCULATORY OVEN WITH TEMP RANGE AMBIENT TO 200 DEG.C +/- 0.5 DEGC (Qty - 01 Set) |
194 | WHEEL BEARING LEAKAGE TENDENCIES TESTER (TECH SPECS B20) (Qty - 01 Set) |
195 | COPPER STRIP CORROSION TESTER WITH CORROSION TEST BOMB BATH (TECH SPECS B21) (Qty - 01 Set) |
196 | EVAPORATION LOSS TESTER (TECH SPECS B22) (Qty - 01 Set) |
197 | APPARENT VISCOSITY APPARTUS - PRESSURE VISCOMETER (TECH SPECS B23) (Qty - 01 Set) |
198 | FOUR BALL TESTER (TECH SPECS B24) (Qty - 01 Set) |
199 | TIMKEN OK LOAD TESTER (TECH SPECS B25) (Qty - 01 Set) |
200 | WELD LOAD - FOUR-BALL METHOD (TECH SPECS B26) (Qty - 01 Set) |
201 | EMCOR TESTER (TECH SPECS B27) (Qty - 01 Set) |
202 | AUTO DENSITYMETER (TECH SPECS A02) (Qty - 01 Set) |
203 | CLOUD & POUR POINT TESTING APPARATUS (TECH SPECS B29) (Qty - 01 Set) |
204 | REFRACTIVE INDEX -Refractometer(TECH SPECS A35) (Qty - 01 Set) |
205 | GLASS ASSEMBLY, LOCAL GLASS WARE/EQUIPMENTSUPPLIERS (Qty - 02 Set) |
206 | FOURIER TRANSFORM INFA RED SPECTROPHOTOMETER (TECH SPECS A13) (Qty - 01 Set) |
207 | UV - VISIBLE SPECTRO PHOTOMETER (TECH SPECS A34) (Qty - 01 Set) |
208 | BROOKFIELDVISCOMETER (TECH SPECS B34) (Qty - 01 Set) |
209 | DIGITAL MICROSCOPE FOR LAB APPLICATION (TECH SPECS B35) (Qty - 01 Set) |
210 | AUTO MELTING POINT APPARATUS (TECH SPECS A33) (Qty - 01 Set) |
211 | LOW-TEMPERATURE TORQUE APPARATUS (TECH SPECS B17) (Qty - 01 Set) |
212 | DIGITAL Ph ANALYZER (TECH SPECS A36) (Qty - 01 Set) |
213 | GAS CHROMATOGRAPH (TECH SPECS A38 &A39) (Qty - 01 Set) |
214 | ELECTRIC MUFFLE FURNACE (TECH SPECS B40) (Qty - 01 Set) |
215 | BOX COMPRESSION STRENGTH TESTER (TECH SPECS PM01) (Qty - 01 Set) |
216 | CARTON BURSTING STRENGTH TESTER (TECH SPECS PM02) (Qty - 01 Set) |
217 | WEIGHING BALANCE 250 KG LC 0.1 KG (TECH SPECS PM04) (Qty - 01 Set) |
218 | WEIGHING BALANCE 20 KG LC 0.01 KG (TECH SPECS PM05) (Qty - 01 Set) |
219 | DIGITAL TOP LOADING BALANCE 500 GMLC 0.01 GM (TECH SPECS PM06) (Qty - 01 Set) |
220 | ANANLYTICAL BALANCE SINGLE PAN 220 GM LC 0.1 MG. (TECH SPECS M15) (Qty - 01 Set) |
221 | MOISTURE ANALYZER - HANDY FOR CARTON (TECH SPECS PM08) (Qty - 01 Set) |
222 | DIGITAL MICROMETER - SCREW CALIPER (TECH SPECS PM09) (Qty - 01 Set) |
223 | VERNIER DIGITAL CALIPER (TECH SPECS PM10) (Qty - 01 Set) |
224 | HEIGHT GAUGE (DIGITAL) (TECH SPECS PM11) (Qty - 01 Set) |
225 | CONDITIONING CHAMBER (TECH SPECS PM12) (Qty - 01 Set) |
226 | ELCOMETER FOR PAINT THICKNESS (TECH SPECS PM13) (Qty - 01 Set) |
227 | MELT FLOW INDEX TESTER (TECH SPECS PM14) (Qty - 01 Set) |
228 | VIBRATION TESTERMACHINE (TECH SPECS PM15) (Qty - 01 Set) |
229 | TENSILE STRENGTH TESTER (TECH SPECS PM16) (Qty - 01 Set) |
230 | PENDULUM IMPACT RESISTANCE TESTER (TECH SPECS PM17) (Qty - 01 Set) |
231 | BALOON BURSTING TESTER (TECH SPECS PM18) (Qty - 01 Set) |
232 | FIXED VOLUME MEASURE WITH CERTIFICATION OF WEIGHT & MEASURES.- LOCAL EQUIP.SUPPLIER (Qty - 01 Set) |
233 | PEEL ADHESION TESTER (TECH SPECS PM20) (Qty - 01 Set) |
234 | Sub-Total for S.No. 2.08 -CATEGORY - A-8 : LABORATORY EQUIPMENTS |
235 | A-9 : ELECTRICAL SYSTEMS |
236 | These cover the following ELECTRICAL SYSTEMS that will be sourced Locally and supplied by PACKAGE-1 VENDOR: The tests listed below shall be read in conjunction with Indian Oil Corporation Limited (IOCL) technical specifications and approved Inspection Test Plans (ITP)/ Quality Assurance Plans (QAP) of vendor. Any additional tests required to be conducted as per IOCL specifications shall be performed by TPIA/ Vendor. All internal test reports, raw material test reports, in-process test reports as defined in ITP/QAP shall be reviewed by TPIA. All tests shall be performed and checked for compliance to latest IOCL approved vendor documents. Details of work scope shall be as per RFQ Doc. (Category-A-9). |
237 | HV Switchgear (3 Panels) |
238 | Transformers (Power - 2 Nos & Distribution - 10 Nos) |
239 | LV Switchgear (PCC - 6 Nos & MCC - 25 Nos) |
240 | APFC Panel (5 Nos) |
241 | Diesel Generator (3 Nos) |
242 | Distribution Boards |
243 | Cable trays & Raceways (1 Sample) |
244 | UPS (25 Nos approx.) |
245 | Lighting |
246 | High Mast (1 Sample) |
247 | Solar PV System (2300 kWP) |
248 | Electric Heat Tracing |
249 | Sub-Total for S.No. 2.09 -CATEGORY - A-9 : ELECTRICAL SYSTEMS |
250 | A-10 : CORE PROCESS EQUIPMENTS – BULK INSTRUMENTS SUPPLY (ON-SHORE WITHIN INDIA) |
251 | These cover the supply of INSTRUMENTS that are part of CPE scope, which will be supplied by PROCESS VENDORS (ONSHORE - within India). Details of work scope shall be as per RFQ Doc. (Category-A-10). |
252 | INSTRUMENTS & VALVES |
253 | ON-OFF Valve ( Solenoid Operated Single / Double acting actuator) |
254 | 25 NB (Medium temperature service) (Qty - 331 Nos) |
255 | 25 NB (High temperature service) (Qty - 01 No) |
256 | 40 NB (Medium temperature service) (Qty - 134 Nos) |
257 | 50 NB (Medium temperature service) (Qty - 200 Nos) |
258 | 50 NB (High temperature service) (Qty - 30 Nos) |
259 | 80 NB (Medium temperature service) (Qty - 462 Nos) |
260 | 80 NB (High temperature service) (Qty - 233 Nos) |
261 | 100 NB (Medium temperature service) (Qty - 396 Nos) |
262 | 100 NB (High temperature service) (Qty - 184 Nos) |
263 | 150 NB (Medium temperature service) (Qty - 99 Nos) |
264 | Flush Bottom ball valve- Solenoid operated |
265 | 50 NB (Qty - 01 No) |
266 | 80 NB (Qty - 18 Nos) |
267 | 150 NB (Qty - 14 Nos) |
268 | 3 Way ON-Off valve ( 1 no. inlet & 2 nos. outlet - 1 at a time only) |
269 | 50 NB (Qty - 04 Nos) |
270 | 80 NB (Qty - 38 Nos) |
271 | 100 NB(Qty - 68 Nos) |
272 | ON-OFF Valve -Solenoid operated single/double acting actuator (MOC - SS) |
273 | 25 NB (Qty - 22 Nos) |
274 | 40 NB (Qty - 16 Nos) |
275 | 50 NB (Qty - 48 Nos) |
276 | 80 NB (Qty - 72 Nos) |
277 | 100 NB (Qty - 07 Nos) |
278 | ON-OFF valve with fail retain last position in the case signal/power failure, |
279 | 25 NB (Qty - 04 Nos) |
280 | 100 NB (Qty - 03 Nos) |
281 | 150 NB (Qty - 44 Nos) |
282 | Supply of Motor operated ON-OFF valve (Electrical motor operated actuator) |
283 | 200 NB (Qty - 17 Nos) |
284 | Supply of Pressure Control Valve- Modulating type |
285 | 15 NB (for line size 25 NB) (Qty - 14 Nos) |
286 | 25 NB(for line size 40 NB) (Qty - 01 No) |
287 | 40 NB (for line size 50 NB) (Qty - 07 Nos) |
288 | 50 NB (for line size 80 NB) (Qty - 67 Nos) |
289 | 80 NB (for line size 100 NB) (Qty - 31 Nos) |
290 | Temperature Control Valve - Modulating type |
291 | 25 NB (for line size 50 NB) (Qty - 03 Nos) |
292 | 50 NB (for line size 80 NB) (Qty - 08 Nos) |
293 | Flow Control valve - Modulating type |
294 | 15 NB (for line size 25 NB) (Qty - 09 Nos) |
295 | 25 NB (for line size 40 NB) (Qty - 11 Nos) |
296 | 40 NB (for line size 50 NB) (Qty - 03 Nos) |
297 | 50 NB (for line size 80 NB) (Qty - 23 Nos) |
298 | 80 NB (for line size 100 NB) (Qty - 02 Nos) |
299 | Self Regulating Pressure control valve |
300 | 15 NB(for line size 25 NB) (Qty - 01 No) |
301 | 25 NB(for line size 40 NB) (Qty - 01 No) |
302 | 40 NB(for line size 50 NB) (Qty - 01 No) |
303 | 50 NB(for line size 80 NB) (Qty - 04 Nos) |
304 | 80 NB(for line size 100 NB) (Qty - 32 Nos) |
305 | 100 NB(for line size 100 NB) (Qty - 01 No) |
306 | 150 NB(for line size 200 NB) (Qty - 13 Nos) |
307 | Air Filter Regulator |
308 | 25 NB for air headers inlet (Qty - 376 Nos) |
309 | 25 NB (Qty - 134 Nos) |
310 | 40 NB (Qty - 01 No) |
311 | Metering skid for loading of tankers (MOC - CS) (Qty - 14 Nos) |
312 | Metering skid for loading of tankers (MOC - SS) (Qty - 08 Nos) |
313 | Flow control Valve in CS contact parts(Qty - 14 Nos) |
314 | Flow control Valve, in SS contact parts (Qty - 09 Nos) |
315 | Loading armof size 80 mm NBwith all contact parts inSS(Qty - 22 Nos) |
316 | ROSOV"s |
317 | 100 NB(Qty - 22 Nos) |
318 | 150 NB(Qty - 36 Nos) |
319 | 50 NB ON-OFF Valve ( Solenoid Operated Single / Double acting actuator)(Qty - 04 Nos) |
320 | 80 NB ON-OFF Valve ( Solenoid Operated Single / Double acting actuator)(Qty - 35 Nos) |
321 | Review of Manufacturer"s Test Certificates and acceptance against of materials against the same (W/O FAT); (Qty - 65 Nos) |
322 | Sub-Total for S.No. 2.10 -CATEGORY - A-10 : CORE PROCESS EQUIPMENTS – BULK INSTRUMENTS SUPPLY (ON-SHORE WITHIN INDIA) |
323 | A-11 : FIRE FIGHTING SYSTEM & FIRE ALARM SYSTEM |
324 | These cover the following FIRE HYDRANT SYSTEM, SPRINKLER SYSTEM, DELUGE SYSTEM & FIRE-ALARM SYSTEMS that will be sourced locally and supplied by Package-1 (CIVIL) VENDOR. Details of work scope shall be as per RFQ Doc. (Category-A-11). |
325 | FIRE FIGHTING SYSTEM |
326 | Diesel Engine Fire Pump (Qty - 02 Set) |
327 | Jockey Pump (Qty - 02 Set) |
328 | Diesel Engine Pump Panel (Qty - 01 Set) |
329 | Jockey Pump Panel (Qty - 01 Set) |
330 | Deluge System(Qty - 12 Set) |
331 | FM200 Fire Extinguishing System & Panel (Qty - 03 Lot) |
332 | FIRE FIGHTING SYSTEM - CONTROL PANELS |
333 | Fire Alarm Control Panel (Qty - 02 Set) |
334 | Repeater Panel (Qty - 02 Set) |
335 | Annunciator Panel (Qty - 03 Set) |
336 | Sub-Total for S.No. 2.11 -CATEGORY - A-11 : FIRE FIGHTING SYSTEM & FIRE ALARM SYSTEM |
337 | A-12 : SECURITY SYSTEMS |
338 | These cover the CCTV & Access Control systems that will be sourced Locally and supplied by Package-1 (CIVIL) VENDOR.Following is the estimated items & their respective quantities required to be covered during FAT by TPI. Details of work scope shall be as per RFQ Doc. (Category-A-12). |
339 | HD IP Fixed POE based Bullet camera with IR and MFZ lens (4K Resolution) along with allmounting accessories (Qty - 83 Nos) |
340 | HD IP Fixed POE based Dome camera with IR and MFZ lens (4K Resolution) along with allmounting accessories (Qty - 44 Nos) |
341 | HD IP PTZ Camera (5MP) along with POE+ injector and mounting accessories (Qty - 47 Nos) |
342 | HD IP fixed Automatic Number plate Recognition POE based camera (ANPR - 4K Resolution) along with all mounting accessories (Qty - 04 Nos) |
343 | 8 port Industrial grade layer 2Managed POEbased Ethernet Switch with 4 (four) 10/100/1000T(X) RJ-45 ports and 4 (four) combo 10/100/1000T(X) RJ-45 ports / 100/1000FX ports & surge protection (Qty - 67 Nos) |
344 | 24 port Industrial grade layer 2Managed POEbased Ethernet Switch 12 (twelve) Gigabit 10/100/1000TX RJ-45 PoE ports and 12 (twelve) Gigabit 100/1000Base-FX SFP ports and surge protection (Qty - 12 Nos) |
345 | Indoor weatherproof housing (IP 65 or better) suitable for installing Layer 2 switch,PSU, LIU and adaptor for Ethernet switch/media convertor surge protectors and other accessories of CCTV cameras (Qty - 44 Nos) |
346 | Wall / Pole mounted Network Rack-minimum 6U 19" Rack / Enclosure (Qty - 35 Nos) |
347 | Heavy Duty self-supported Hot Dip GalvanizedPoles(8-10 M pole with cantilever arrangement for mounting (Qty - 90 Nos) |
348 | CCTV Management Server (s) including failover redundancy (Qty - 02 Nos) |
349 | CCTV Recording Server (s) including failover redundancy (Qty - 05 Nos) |
350 | Command and Control Management & Application Server (s) including failover redundancy (Qty - 02 Nos) |
351 | Command and Control Database and OIS Server (s) including failover redundancy (Qty - 02 Nos) |
352 | Video Analytical and ANPR Server (s) (Qty - 05 Nos) |
353 | 900 TB Storage Attached Network (SAN) (Qty - 03 Nos) |
354 | 65" LED High Definition LED Display monitor (Qty - 06 Nos) |
355 | CCTV client work station along with client software, 42" LED Monitor, key board, mouse (Qty - 04 Nos) |
356 | Layer 3 Managed Gigabit Ethernet Switch with minimum 28 ports loaded with 14 nos. of SFP SM transceivers (1000 base LX) and other accessories (Qty - 02 Nos) |
357 | Advanced software solution for Security Video Management software with command and control centers capable of handling critical alarm with suggestion of appropriate actions and counter measures. |
358 | Advanced Analytics Software (Qty - 01 Lot) |
359 | 42 U Rack Enclosure cabinet/System cabinet (Qty - 02 Nos) |
360 | Parallel redundant UPS (Qty - 02 Nos) |
361 | All types of CCTV Cables including network, Power and Fiber optic cables. (Qty - 16,210 Mtrs) |
362 | Access Control Management & Identity Management Software License supporting500,000 cardholders, Access Control Software seamlessly integrated with Command & Control software and PAS. Additional software like Visitor Management module, Guard Tour module, Graphical module, shall also be included. supporting a minimum of 5 nos. clients (inclusive of client license) for workstation (Admin, Monitoring or Web Client), LDAP Support |
363 | Two Reader Access Controller , supporting one entry and one exit reader, 24VAC power supply unit and with all accessories (Qty - 21 Nos) |
364 | Touchless Biometric reader complete with fingerprint encoding. (Qty - 05 Nos) |
365 | Multi-Technology Smart card Reader capable of reading and supporting all card formats (Qty - 19 Nos) |
366 | Outdoor enclosure with Multi-Technology Smart card Reader along with 1.5 Meter SS pole with foundation. (Qty - 13 Nos) |
367 | Multi-Technology Smart Card (1K) (Qty - 1500 Nos) |
368 | Access Control Server with server redundancy (Qty - 02 Nos) |
369 | 6 port Industrial grade layer 2Managed Ethernet Switch WITH 10/100/1000 Mbps with 6 Nos. RJ copper port and 2 Nos. SFP SM transceivers (1000 base LX) with surge protection (Qty - 14 Nos) |
370 | 16 port Industrial grade layer 2Managed Ethernet Switch WITH 10/100/1000 Mbps with 16 Nos. RJ copper port and 2 Nos. SFP SM transceivers (1000 base LX)with surge protection (Qty - 02 Nos) |
371 | Half Height tripod (3 x 180 degree) with necessary civil foundation (Qty - 04 Nos) |
372 | Area scan Under Vehicle Surveillance System with necessary civil foundation (Qty - 01 No) |
373 | Automatic Rising Bollards (Minimum 4 cylindrical arms) with necessary civil foundation (Qty - 02 Nos) |
374 | X-Ray Baggage Scanner (Qty - 01 No) |
375 | Door Frame Metal Detector (Qty - 01 No) |
376 | Boom barrier with 5 Meter length (Qty - 02 Nos) |
377 | Boom barrier with 9 Meter length (Qty - 02 Nos) |
378 | Explosive Trace Detector. (Qty - 01 No) |
379 | Breath Analyzer. (Qty - 01 No) |
380 | All types of ACS Cables including network, Power and Fiber optic cables. (Qty - 10,120 Mtrs) |
381 | Sub-Total for S.No. 2.12 -CATEGORY - A-12 : SECURITY SYSTEMS |
382 | A-13 : PIPING WORKS – MANUAL VALVES |
383 | These cover the following MANUAL VALVES & STRAINERS that will be sourced Locally and supplied by PACKAGE-3 (MECHANICAL) VENDOR. Details of work scope shall be as per RFQ Doc. (Category-A-13). |
384 | Ball Valves (Qty - 5829 Nos) |
385 | Check Valves (Qty - 1833 Nos) |
386 | Gate Valves (Qty - 275 Nos) |
387 | Globe Valves (Qty - 23 Nos) |
388 | Butterfly Valves (Qty - 362 Nos) |
389 | Piston Valves (Qty - 236 Nos) |
390 | Strainers (Qty - 224 Nos) |
391 | Steam Traps (Qty - 15 Nos) |
392 | Flexible Hoses (Qty - 207 Nos) |
393 | Truck / Drum unloading hoses with couplers (dry disconnect / flanged end) (Qty - 128 Nos) |
394 | Male adaptor for dry disconnect couplings (Qty - 27 Nos) |
395 | Sub-Total for S.No. 2.13 -CATEGORY - A-13 : PIPING WORKS – MANUAL VALVES |
396 | A-14 : MATERIAL HANDLING FACILITIES |
397 | These cover the following MATERIAL HANDLING FACILITIES, that will be sourced Locally and supplied by PACKAGE-3 (MECHANICAL) VENDOR. Details of work scope shall be as per RFQ Doc. (Category-A-14). |
398 | DOCK LEVELLERS(Qty - 25 Nos) |
399 | GOODS LIFT (CAPACITY: 2 MT) (Qty - 03 Nos) |
400 | FORK LIFT TRUCKS (BATTERY POWERED)(Qty - 06 Nos) |
401 | FORK LIFT TRUCKS (DIESEL POWERED)(Qty - 04 Nos) |
402 | PALLET TRUCKS (BATTERY POWERED)(Qty - 06 Nos) |
403 | TRACK-N-TRACE SYSTEM |
404 | TRACK-N-TRACE SYSTEM FOR Raw Material Warehouse (Qty - 01 Set) |
405 | TRACK-N-TRACE SYSTEM FOR Packaging Material Warehouse (Qty - 01 Set) |
406 | TRACK-N-TRACE SYSTEM FOR Finished Product Warehouse (Qty - 01 Set) |
407 | MHE FOR LOADING /UNLOADING OF TRUCK (TELESCOPIC CONVEYOR OR ROUGH TOP BELT CONVEYOR) – FOR RM WAREHOUSE (Qty - 01 Set) |
408 | MHE FOR LOADING /UNLOADING OF TRUCK (TELESCOPIC CONVEYOR OR ROUGH TOP BELT CONVEYOR) – FOR PM WAREHOUSE (Qty - 01 Set) |
409 | MHE FOR LOADING /UNLOADING OF TRUCK (TELESCOPIC CONVEYOR OR ROUGH TOP BELT CONVEYOR) – FOR FP WAREHOUSE (Qty - 01 Set) |
410 | EMPTY DRUM TRANSFER SYSTEM (Qty - 01 Set) |
411 | STEEL PALLETS (Qty - 8,650 Nos) |
412 | Sub-Total for S.No. 2.14 -CATEGORY - A-14 : MATERIAL HANDLING FACILITIES |
413 | Total for S.No. 2.0 -CATEGORY - A : TPI SERVICES FOR SHOP FABRICATED EQUIPMENT, SKIDS OR SYSTEMS – ONSHORE (IN INDIA) |
414 | CATEGORY - B: TPI SERVICES FOR SHOP FABRICATED EQUIPMENT, SKIDS OR SYSTEMS – OFF-SHORE |
415 | Providing services for Third Party Inspection (TPI) including liaisoning & obtaining quality assurance plan (QAP), requisite documents, carrying out inspection at vendor shop / factory, submission of report. The TPI services to be performed on Mandays basis for Off-shore (Overseas) sourced fabricated equipments / Skids / Systems such as Core Process Equipments for Lubes & Grease manufacturing, Diesel Exhaust Fluid, Bulk Instruments & Valves, Automation and Control System Hardware & Software, Core Filling Lines (Small can & High Speed Drum Filling Line), Automatic Storage & Retrieval System based Warehousing system, etc., The rate is inclusive of Local conveyance, Lodging and Boarding, allied expenses and incidental charges, etc., The estimated rates are bi-furcated for cost towards visit charges per person & Mandays inspection charges. The modality of handling visit charges and inspection charges are given below: (a) The visit charges shall be paid for undertaking the visit by TPI agency personnel from any place in India to any place overseas as detailed in respective item of this BoQ. (b) The Vist charges are inclusive of to & fro travel time and the travel & allied incidental time shall not be accounted for payment under Mandays for inspection. The payment for Mandays inspection shall be released by IOCL as perrespective item of BoQ for actual Mandays deployed for carrying out inspection at vendor"s workshop / factory. |
416 | (c) The visit charges is not applicable in case of undertaking visit by personnel of TPI agency / local office at abroad (as defined subsequently) from any other place outside India to overseas place of inspection, and hence IOCL shall not pay visit charges for this eventuality. In other words, cost towards inspection charge becomes inclusive of vist charges undertaken from any place outside india to overseas place of inspection. For the inspection carriedout by TPI agency through their local office abroad shall be paid on Manday basis through respective item of BoQ as detailed below. (d) The branch office / sister concern / parent company / subsidiary / companies under common umbrella are allowed for undertaking overseas inspection through their local office abroad. In case the inspection has been carried out by said branch office / sister concern / parent company / subsidiary / companies under common umbrella, the inspection report shall be vetted by bidding company and to be submitted to IOCL by bidding company. The onus of inspection lies with bidding company and the terms & conditions of the tender shall be revoked against the bidding company for any breach of contract or non-conformity. |
417 | B-1 : SHOP FABRICATED – CORE PROCESS EQUIPMENTS - FOR LUBES |
418 | These cover the shop fabricated CORE PROCESS EQUIPMENTS that will be fabricated & supplied by PROCESS VENDORS in SKID form and these will be primarily fabricated by CPE Vendors in their own Shop or sourced from other Sub-contracted OFFSHORE vendors. Details of work scope shall be as per RFQ Doc. (Category-B-1). |
419 | Simultaneous Metered Batch Blender for Lubes with Booster pumps – Skid mounted;(Qty - 02 Nos) |
420 | Auto Batch Blenders (20MT) with Dosing Tanks & Recirculation Transfer pumps(Qty - 02 Nos) |
421 | Auto Batch Blender (15MT) with Sulphur dissolution vessel, Powder silo with charging arrangement & Recirculation Transfer pumps(Qty - 01 No) |
422 | Exhaust Scrubber arrangement for Sulphur dissolution facility(Qty - 01 No) |
423 | Auto Batch Blender (30MT) & Recirculation Transfer pump(Qty - 01 Set) |
424 | Auto Batch Pilot Blender (2MT) & Recirculation Transfer pump(Qty - 01 No) |
425 | Drum Decanting Systems (Skid mounted)(Qty - 03 Nos) |
426 | Drum Heating Ovens (Cap- 32 Drums)(Qty - 02 Nos) |
427 | Blended Product Transfer Matrix Manifold (2x5 configuration)(Qty - 01 No) |
428 | Finished Product Transfer Matrix Manifold (22 x 16 configuration)(Qty - 01 No) |
429 | Air Mixing Systems for FP Tanks – 33nos for FP Tanks(Qty - 33 Nos) |
430 | Air Mixing Systems for BO & Extract tanks;(Qty - 09 Nos) |
431 | Skid for Dye dissolution & Dosing system – with 5nos Dye mixing & dosing tanks;(Qty - 01 Lot) |
432 | VII Dissolution Kettle with Bottom Entry Disintegrator, Transfer pump, In-line Mixer and Product filter,Polymer Charging provision etc.(Qty - 01 Lot) |
433 | In-Line Blending Skid for Bituminous Lubes with Booster pump(Qty - 01 Lot) |
434 | Skid for Additive Premix Vessel for Bituminous Lubes with Pump(Qty - 01 Lot) |
435 | In-Line Blending skid for Rubber Extender Oils with Booster pump(Qty - 01 Lot) |
436 | Skid for Additive Premix Vessel for REX with Pump(Qty - 01 Lot) |
437 | Air Mixing Systems for REX Finishing Tanks;(Qty - 06 Nos) |
438 | Piggable Matrix manifold for REX finished product Transfer ( 2 x 2)(Qty - 01 No) |
439 | Simultaneous Batch Blender for BN Extract Oil(Qty - 01 Lot) |
440 | Skid for Additive Premix Vessel for BN Extract with Pump(Qty - 01 Lot) |
441 | Piggable Matrix manifold for BN Extract finished product Transfer ( 2 x 3) (Qty - 01 No) |
442 | Sub-Total for S.No. 3.01 -CATEGORY - B-1 : SHOP FABRICATED – CORE PROCESS EQUIPMENTS – FOR LUBES |
443 | B-2 : CORE PROCESS EQUIPMENTS – FOR GREASE (OFF-SHORE) |
444 | These cover the shop fabricated CORE PROCESS EQUIPMENTS that will be supplied by PROCESS VENDORS and these will be primarily sourced from other Sub-contracted OFFSHORE vendors. Details of work scope shall be as per RFQ Doc. (Category-B-2). |
445 | Grease Contactors (Qty - 02 Nos) |
446 | Grease Finishing Vessels (Qty - 06 Nos) |
447 | Grease Processing Kettles -12 MT (Qty - 03 Nos) |
448 | Grease Processing Kettle – 10MT for Clay Grease (Qty - 01 No) |
449 | Grease Autoclaves (PU & CaS) (Qty - 02 Nos) |
450 | Grease Autoclave for FG Grease (Qty - 01 No) |
451 | Grease Finishing Vessel for FG Grease (Qty - 01 No) |
452 | Grease Holding Tanks (Qty - 05 Nos) |
453 | Grease Homogenizers (Qty - 12 Nos) |
454 | Grease Colloid Mills (Qty - 02 Nos) |
455 | Grease Colloid Mill for FG Grease (Qty - 01 No) |
456 | In-line Vacuum Deaerators (Qty - 08 Nos) |
457 | Grease Filtration units (Qty - 07 Nos) |
458 | Sub-Total for S.No. 3.02 -CATEGORY - B-2 : CORE PROCESS EQUIPMENTS – FOR GREASE (OFF-SHORE) |
459 | B-3 : CORE PROCESS EQUIPMENTS – BULK INSTRUMENTS SUPPLY (OFF-SHORE) |
460 | These cover the supply of INSTRUMENTS that are part of CPE scope, which will be supplied by PROCESS VENDORS and these will be primarily sourced from Sub-contracted OFFSHORE vendors. Details of work scope shall be as per RFQ Doc. (Category-B-3). |
461 | B-3.1 : INSTRUMENTS & VALVES |
462 | ON-OFF Valve ( Solenoid Operated Single / Double acting actuator) |
463 | 25 NB (Medium temperature service) (Qty - 331 Nos) |
464 | 25 NB (High temperature service) (Qty - 01 No) |
465 | 40 NB (Medium temperature service) (Qty - 134 Nos) |
466 | 50 NB (Medium temperature service) (Qty - 200 Nos) |
467 | 50 NB (High temperature service) (Qty - 30 Nos) |
468 | 80 NB (Medium temperature service) (Qty - 462 Nos) |
469 | 80 NB (High temperature service) (Qty - 233 Nos) |
470 | 100 NB (Medium temperature service) (Qty - 396 Nos) |
471 | 100 NB (High temperature service) (Qty - 184 Nos) |
472 | 150 NB (Medium temperature service) (Qty - 99 Nos) |
473 | Flush Bottom ball valve- Solenoid operated |
474 | 50 NB (Qty - 01 No) |
475 | 80 NB (Qty - 18 Nos) |
476 | 150 NB (Qty - 14 Nos) |
477 | 3 Way ON-Off valve ( 1 no. inlet & 2 nos. outlet - 1 at a time only) |
478 | 50 NB (Qty - 04 Nos) |
479 | 80 NB (Qty - 38 Nos) |
480 | 100 NB(Qty - 68 Nos) |
481 | ON-OFF Valve -Solenoid operated single/double acting actuator (MOC - SS) |
482 | 25 NB (Qty - 22 Nos) |
483 | 40 NB (Qty - 16 Nos) |
484 | 50 NB (Qty - 48 Nos) |
485 | 80 NB (Qty - 72 Nos) |
486 | 100 NB (Qty - 07 Nos) |
487 | ON-OFF valve with fail retain last position in the case signal/power failure, |
488 | 25 NB (Qty - 04 Nos) |
489 | 100 NB (Qty - 03 Nos) |
490 | 150 NB (Qty - 44 Nos) |
491 | Supply of Motor operated ON-OFF valve (Electrical motor operated actuator) |
492 | 200 NB (Qty - 17 Nos) |
493 | Supply of Pressure Control Valve- Modulating type |
494 | 15 NB (for line size 25 NB) (Qty - 14 Nos) |
495 | 25 NB(for line size 40 NB) (Qty - 01 No) |
496 | 40 NB (for line size 50 NB) (Qty - 07 Nos) |
497 | 50 NB (for line size 80 NB) (Qty - 67 Nos) |
498 | 80 NB (for line size 100 NB) (Qty - 31 Nos) |
499 | Temperature Control Valve - Modulating type |
500 | 25 NB (for line size 50 NB) (Qty - 03 Nos) |
501 | 50 NB (for line size 80 NB) (Qty - 08 Nos) |
502 | Flow Control valve - Modulating type |
503 | 15 NB (for line size 25 NB) (Qty - 09 Nos) |
504 | 25 NB (for line size 40 NB) (Qty - 11 Nos) |
505 | 40 NB (for line size 50 NB) (Qty - 03 Nos) |
506 | 50 NB (for line size 80 NB) (Qty - 23 Nos) |
507 | 80 NB (for line size 100 NB) (Qty - 02 Nos) |
508 | Self Regulating Pressure control valve |
509 | 15 NB(for line size 25 NB) (Qty - 01 No) |
510 | 25 NB(for line size 40 NB) (Qty - 01 No) |
511 | 40 NB(for line size 50 NB) (Qty - 01 No) |
512 | 50 NB(for line size 80 NB) (Qty - 04 Nos) |
513 | 80 NB(for line size 100 NB) (Qty - 32 Nos) |
514 | 100 NB(for line size 100 NB) (Qty - 01 No) |
515 | 150 NB(for line size 200 NB) (Qty - 13 Nos) |
516 | Air Filter Regulator |
517 | 25 NB for air headers inlet (Qty - 376 Nos) |
518 | 25 NB (Qty - 134 Nos) |
519 | 40 NB (Qty - 01 No) |
520 | Metering skid for loading of tankers (MOC - CS) (Qty - 14 Nos) |
521 | Metering skid for loading of tankers (MOC - SS) (Qty - 08 Nos) |
522 | Flow control Valve in CS contact parts(Qty - 14 Nos) |
523 | Flow control Valve, in SS contact parts (Qty - 09 Nos) |
524 | Loading armof size 80 mm NBwith all contact parts inSS(Qty - 22 Nos) |
525 | ROSOV"s |
526 | 100 NB(Qty - 22 Nos) |
527 | 150 NB(Qty - 36 Nos) |
528 | 50 NB ON-OFF Valve ( Solenoid Operated Single / Double acting actuator)(Qty - 04 Nos) |
529 | 80 NB ON-OFF Valve ( Solenoid Operated Single / Double acting actuator)(Qty - 35 Nos) |
530 | Review of Manufacturer"s Test Certificates and acceptance against of materials against the same (W/O FAT); (Qty - 65 Nos) |
531 | Sub-Total for S.No. 3.03 -CATEGORY - B-3 : CORE PROCESS EQUIPMENTS – BULK INSTRUMENTS SUPPLY (OFF-SHORE) |
532 | B-4 : CORE PROCESS EQUIPMENTS – CONTROL SYSTEM SUPPLY (OFF-SHORE) |
533 | These cover the supply of CONTROL SYSTEM HARDWARE & SOFTWARE that are part of CPE scope, which will be supplied by PROCESS VENDORS from their Overseas facility.Details of work scope shall be as per RFQ Doc. (Category-B-4). |
534 | Control System hardware as per following |
535 | Remote IO Panel(Qty - 25 Nos) |
536 | DCS Control Panel(Qty - 01 No) |
537 | Servers(Qty - 02 Nos) |
538 | Operator workstations(Qty - 26 Nos) |
539 | Engineering workstations(Qty - 02 Nos) |
540 | Control System Softwares(Qty - 01 Lot) |
541 | Sub-Total for S.No. 3.04 -CATEGORY - B-4 : CORE PROCESS EQUIPMENTS – CONTROL SYSTEM SUPPLY (OFF-SHORE) |
542 | B-5 : PROCESS SKIDS FOR DEF |
543 | These cover the shop fabricated PROCESS SKIDS that will be fabricated & supplied by Licensed Process vendors for DEF SKIDS and these will be primarily sourced by Mechanical Pkg vendor from other Sub-contracted OFFSHORE vendors. Details of work scope shall be as per RFQ Doc. (Category-B-5). |
544 | DEF plant skids (SS Contact parts) (Qty - 02 Nos) |
545 | Sub-Total for S.No. 3.05 -CATEGORY - B-5 : PROCESS SKIDS FOR DEF |
546 | B-6 : CORE FILLING LINES – IMPORTED (OFF-SHORE) |
547 | These cover the supply of imported CORE FILLING LINES that are part of MECHANICAL scope. Details of work scope shall be as per RFQ Doc. (Category-B-6). |
548 | Medium speed, Small Can filling line for Lubes – suitable for 0.25L to 1.2L cans, complete with Unscrambler, Labeller, Lowerator, Infeed conveyor, Weighmetric filler & capper, Induction Heat Sealer, Laser jet printer, Case Packer, Carton Sealer & coder, Palletizer;(Qty - 01 No) |
549 | High speed drum filling line for Lubes – suitable for 200L/210L, Metal /HDPE drums, complete with Debunging tools, Fillers, Bunging & Sealing tools, On-line Drum labellers, common Palletizer – shared by 2 lines; (Qty - 02 Nos) |
550 | Sub-Total for S.No. 3.06 -CATEGORY - B-6 : CORE PROCESS LINES – IMPORTED (OFF-SHORE) |
551 | B-7 : AS/RS based WAREHOUSING SYSTEMS |
552 | These cover the supply of imported ASRS that are part of MECHANICAL scope. Details of work scope shall be as per RFQ Doc. (Category-B-7). |
553 | RAW MATERIAL WAREHOUSE – AS/RS SYSTEM (Pallet Quantity: 2500 numbers)(Qty - 01 No) |
554 | PACKAGING MATERIAL WAREHOUSE – AS/RS SYSTEM (Pallet Quantity: 1500 numbers)(Qty - 01 No) |
555 | FINISHED PRODUCT WAREHOUSE – AS/RS SYSTEM (Pallet Quantity: 4500 numbers)(Qty - 01 No) |
556 | LOW-FLASH RAW MATERIAL WAREHOUSE RACK (Pallet Quantity: 150 numbers; Two (2) level, 24 SKUs) (Qty - 01 No) |
557 | WMS System Hardware for RM, PM, FP & Low-Flash RM Warehouse |
558 | SRM |
559 | Double Deep Stacker Crane(Qty - 12 Nos) |
560 | Euro (skid type pallet) Fork(Qty - 12 Nos) |
561 | Bottom rails(Qty - 12 Set) |
562 | Bus Bar(Qty - 12 Set) |
563 | Shock absorber (rail end) urethane rubber stopper(Qty - 12 Set) |
564 | Pendant Switch (Handy-Terminal)(Qty - 12 Set) |
565 | Operation Box for SRC (off-board ctrl)(Qty - 12 Set) |
566 | HP/OP end of aisle fence and interlocked man-door(Qty - 2 Set per aisle) |
567 | Loop STV |
568 | STV(Qty - 07 Nos) |
569 | STV Loop rail(Qty - 02 Set) |
570 | STV bus-bar(Qty - 02 Set) |
571 | Off board Operation box(Qty - 02 Set) |
572 | Guard fence and interlocked man-door(Qty - 02 Set) |
573 | In/Out Equipment |
574 | Dock/Production Area - Aisle Conveyors(Qty - 98 Set) |
575 | IN /OUT Conveyors (FG area)(Qty - 24 Set) |
576 | Weigh scale(Qty - 14 Nos) |
577 | Profile Check(Qty - 24 Nos) |
578 | Barcode Reader(Qty - 24 Nos) |
579 | Light towers(Qty - 01 Lot) |
580 | Guard post, guard pole, guard rail(Qty - 01 Lot) |
581 | IT Hardware |
582 | PC, Barcode printer, Label printer, etc(Qty - 01 Lot) |
583 | CTR |
584 | AGC (AS/RS Group Controller)(Qty - 01 Set) |
585 | SRC (SRM off-board controller)(Qty - 12 Nos) |
586 | STVC (STV off-board controller)(Qty - 02 Set) |
587 | PLC system for conveyor(Qty - 01 Set) |
588 | Field bus system for conveyor control(Qty - 01 Set) |
589 | MOS ( Visualization System)(Qty - 01 Set) |
590 | UPS for AGC & MOS & Controllers(Qty - 01 Set) |
591 | AGC & MOS software(Qty - 01 Set) |
592 | WMS System Software for RM, PM, FP & Low-Flash RM Warehouse |
593 | System checkout.(Qty - 01 Set) |
594 | Test of standard software.(Qty - 01 Set) |
595 | Check of sequences and interlocks configuration.(Qty - 01 Set) |
596 | Test of alarm system(Qty - 01 Set) |
597 | Check of the correct functionality of operators keyboard(Qty - 01 Set) |
598 | Check of other hardware parts.(Qty - 01 Set) |
599 | Demonstration of diagnostic equipment.(Qty - 01 Set) |
600 | Simulation of power failure and restarts.(Qty - 01 Set) |
601 | Sub-Total for S.No. 3.07 -CATEGORY - B-7 : AS/RS WAREHOUSING SYSTEMS |
602 | Total for S.No. 3.0 -CATEGORY - B: TPI SERVICES FOR SHOP FABRICATED EQUIPMENT, SKIDS OR SYSTEMS – OFF-SHORE |