| 1 | Items Required:- |
| 2 | Excavating/ digging out pits of suitable size (but dia not less than 400mm and depth not less than 500mm) each pit not exc 0.50 cum in any type of soil, manually or with using augar/pickaxe including removing excavated soil to a distance not exc 50m and making good surface. |
| 3 | Supply only approved earth mixed with suitable as well as sufficient manure & chloropyriophos |
| 4 | Supplying and planting of following season flowering healthy plant/sapling of fully yong aged ofspecified height in the pits, refilling the pits with prepared mix of earth duly mixed with suitable manure & chloropyriophos etc in the suitable proportions as specified and directed complete. :- |
| 5 | (a) Rose |
| 6 | (b) Bougainville |
| 7 | (c) Lantana |
| 8 | (d) Millis |
| 9 | (e) Adanium |
| 10 | Note:- (a) Rate for digging for plantation of plant/ sapling will be measuered & paid separetely.(b) Rate for approved earth mixed with suitable manure will bemeasuered & paid separetely. |
| 11 | Supplying and planting of following Ornamental trees of 2 year aged ofspecified height in the pits, refilling the pits with prepared mix of earth duly mixed with suitable manure & chloropyriophos etc in the suitable proportions as specified and directed complete. :- |
| 12 | (a) Gulmohor |
| 13 | (b) Amal Tar |
| 14 | (c) Alatonia |
| 15 | Note:- (a) Rate for digging for plantation of plant/ sapling will be measuered & paid separetely.(b) Rate for approved earth mixed with suitable manure will bemeasuered & paid separetely. |
| 16 | Supplying and planting of following Fruits trees of 2-3 year aged ofspecified height in the pits, refilling the pits with prepared mix of earth duly mixed with suitable manure & chloropyriophos etc in the suitable proportions as specified and directed complete. :- |
| 17 | (a) Mango 3 year aged |
| 18 | (b) Guava2 year aged |
| 19 | Note:- (a) Rate for digging for plantation of plant/ sapling will be measuered & paid separetely.(b) Rate for approved earth mixed with suitable manure will bemeasuered & paid separetely. |
| 20 | Supply and planting of Hedges in double row of suitable shurbs like Duranta ,Lantana, Lalsa and Aclipha. (Min Height 25 cms) on the prepared formation around the peripheri of the area complete incl necessary trenching to plantation all as specified and directed.Note:- (a) Rate for laying of approved earth is inclusive in this item.(b) Rate for supply only of approved earth mixed with suitable manure will bemeasuered & paid separetely. |
| 21 | Supply and planting of grass ready made like carpet grass or selected No 1 by dibbling root method on layed approved earth mixed with manure inlcuding necessary trenching complete all as specified and directed.Note:- (a) Rate for laying of approved earth is inclusive in this item.(b) Rate for supply only of approved earth mixed with suitable manure will bemeasuered & paid separetely. |
| 22 | Drilling and tapping cast iron water mains ( in position) for branch connections of the internal dia 20 mm |
| 23 | Supplying & fixing of 20 mm bore tubes \"medium grade\" galvanized, with all fitting and fixed complete to walls and ceilings or laid in floor. |
| 24 | Supplying & fixing of 15 mm bore tubes \"medium grade\" galvanized, with all fitting and fixed complete to walls and ceilings or laid in floor.Note : Fixing of all fitting are inclusive in this item like sprinklere system etc. |
| 25 | S& F for 1000 capacity in liters rotational moulded polye thylene water storage tanks ( cylindrical vertical with closed top ) hoisted & fixed in position all as specified in SSR I. |
| 26 | Supplying only sprinkler system for watering. Note:- Fixing charges is already inclusive in item No 1.10 |
| 27 | Supply installation testing and commissioning Electrically driven high speed Centrifugal Monoblock pump set 1.5 HP, three phase, 415 vots, 50 Hz, including standard coupling, coupling guard, company fabricated common MS channel base plate, foundation bolts including PCC foundation, MS Cabinet complete connecting to existing electric system including one No pressure gauge supplying, installing, testing and commissioning & connecting to existing GI / CI suction and delivery line including connecting & jointing materials such asGI / CI reducers / expander flange ends, MS flange of required size testing, commissioning complete all as specified Make Kirloskar including Pump DOL Starter with ON/OFF switch standard model |
| 28 | XLPE insulated, armoured heavy duty electric cable with aluminium conductor, 1100 volts grade, cross-sectional area 4 sq. Mm, 4 Core |
| 29 | Excavation in trenches not exc 1.50 Metre wide and not exc 1.50 Metre depth for laying of UG Cable/Pole/Stays etc getting out in Soft/Loose Soil, complete all as specified and as directed. |
| 30 | Returning, Filling in including Spreading, Leveling, Watering and Well Ramming in layers not exc. 25 Cm thick in Soils, complete all as specified and as directed. |
| 31 | Removing Surplus soil to a distance not exc 50.00 Metre away and depositing where directed at a level not exc 1.50 Metre above the Starting Point, complete all as specified and as directed. |
| 32 | M & L for clean dry river sandin trenches/ducts for cushioning to cable, 8 cm in depth before laying the cable and 15 cm in depth after laying the cable complete all as specified. |
| 33 | Bricks old size sub class \"B\" well kiln burnt bricks laid in trenches as cable cover complete all as directed |