| 1 | fo|qr uxjh; forj.k [k.M&cq0\"kgj ds vUrxZr iw.kZ tek ;kstuk en esa ftyk vLirky] cq0\"kgj esa jktdh; esfMdy dkWyst ds fuekZ.k esa ck/kd ,y0Vh0 fo|qr ykbZu o iksyks dks LFkkukUrfjr djus laca/kh dk;ZA |
| 2 | Carriage of fallowings from ESC. BSR to pit site on kachcha pacaa road including loading and unloading chagres at both ends, rcquricd for proper completion of work, distance about to 60 Kms. |
| 3 | S.T Pole 09 Mtr. Long |
| 4 | LT ABC 120 sqmm |
| 5 | LT ABC 95 sqmm |
| 6 | Carriage of All line Material from store center BSR to j.e store Sub station as ACSR Weasel conductor, ABC conductor GI Wire, Earth Wire. M.S. Chanel, Angle, Stay & Earthig Rods, Barbed Wire. Disc Insulator etc. |
| 7 | Erection ofSingle pole support including complete 1 IT fittings as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 8 | Grouting of Single support shall be grouted with cement, sand and birck ballast/stone ballast in ratio 1:4:8 =30x3030 cms. including the cost of cement, sand, birck ballast/stone ballast, etc. as per actual size requirement, as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 9 | Carriage of All line Material from J.E store Sub station to Pit Site ACSR Weasel conductor, ABC conductor GI Wire, Earth Wire. M.S. Chanel, Angle, Stay & Earthig Rods, Barbed Wire. Disc Insulator etc. |
| 10 | fixing of 11 Kv Stay rod with Stay wire in proper way with Nozelling |
| 11 | Grouting of 11 Kv Stay rods |
| 12 | Laying, sagging. Stringing and binding and jumpering of LT ABC cable on Outher size newly erected pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T&P, carrier etc. requried for proper completion of work. |
| 13 | LT ABC 3x120 sqmm |
| 14 | LT ABC 3x95 sqmm |
| 15 | Fixing of LT distribution box 3 phase |
| 16 | Fixing of suspantion clamp |
| 17 | Fixing of dead end clamp |
| 18 | Fixing of I hook |
| 19 | Fixing of Pearcing clamp |
| 20 | Fixing of single lead 16 sqmm |
| 21 | Fixing of ms clamp off size |
| 22 | Fixing of nut bolt |
| 23 | Painting of pole |
| 24 | The folloing material is required to be supplied by the contractor. |
| 25 | LT distribution box 3 phase |
| 26 | Suspantion clamp |
| 27 | Dead end clamp |
| 28 | I hook |
| 29 | Pearcing clamp |
| 30 | Single lead 16 sqmm |
| 31 | MS clamp off size |
| 32 | Red oxide paint |
| 33 | Aluminium Paint |
| 34 | Bolt & nut off size. |