| 1 | Loading HT PSC polefromthe stacking placeand unloading the same at work site (transport by vehicle). |
| 2 | Loading HT \"A\" type polefromthe stacking placeand unloading the same at work site (transport by vehicle). |
| 3 | Loading LT PSC polefromthe stacking placeand unloading the same at work site (transport by vehicle). |
| 4 | Transporting polesby hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading. |
| 5 | Drilling holeof various sizeson existing Channel/Cross Arm. |
| 6 | Fitting and erecting one HT PSC Pole in position incl. fitting crossarm,digging & backfilling pit, drawing earth leads. |
| 7 | Fitting and erecting one HT \"A\" type Pole in position incl. fitting crossarm,digging & back fillingpit, drawing earth leads. |
| 8 | Additional ratefor providing one disc set on anytype of HT pole for making cut point. |
| 9 | Fitting and erecting one HT DP using PSC polein position incl. fitting 2 channel crossarms, digging & backfillingpit, drawing earth leads. |
| 10 | Fitting and erecting one HT DP using \"A\" type polein position incl. fitting 2 channel cross arms, digging & backfillingpit, drawing earth leads. |
| 11 | Fitting and providing one HT Stay for 11kV poleincl. digging & backfillingpit. |
| 12 | Fitting and providing one Strutusing HT PSC poleincl. digging & backfillingpit. |
| 13 | Fitting and providing one HT Fly stayfor 11kV pole using HT PSC poleincl. digging & back |
| 14 | fillingpits.Additional ratefor excavation of one Pit for HT Pole/HT Stay in Hard Laterite. |
| 15 | Additional ratefor excavation of one Pit for HT Pole/HT Stay in Soft Rock. |
| 16 | Additional ratefor excavation of one Pit for HT Pole/HT Stay in Rock. |
| 17 | Stringing of one km 11kV line with ACSR Raccoon (3 conductors) incl. cutting and removing tree branches wherever necessary. |
| 18 | Providing one Earth using earth pipe incl. digging separate pit at standard distance away from the pole/structure & backfilling. |
| 19 | Providing one Coil Earth using GI earth wire,digging separate pit at standard distance away fromthe pole/structure & backfilling. |
| 20 | Fitting one set AB switch and giving connection |
| 21 | Fitting one Additional V crossarmin existing single poleincl. conveyance of materials. |
| 22 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single poleincl. conveyance of materials. |
| 23 | Fitting one Additional 2.4m/3m Channel crossarm (100x50x6mm), in existing 11kV DP incl. conveyance of materials. |
| 24 | Dismantling one damaged LT PSC/RCC poleafter disconnecting stays, strut etc. and stacking the same. |
| 25 | Transferring LT Sph 2/3 wireOH line to newly erected HT/LT pole and refitting all items to the new pole. |
| 26 | Transferring LT 3ph4/5 wireOH line to newly erected HT/LT pole and refitting all items to the new pole. |
| 27 | Dismantling and reconnecting Sph service connection fromthe OH line incl. lowering down the WP portion. |
| 28 | Providing WP support with PSC poleincl. digging & back filling pit. |
| 29 | Providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of all material (as per specification). |