|
| 1 | Supply & Erection of IntelligentAdvance APP Based Traffic Management System with priorty signaling , Equipped with NewTec- 520 next generation technologies With following Features.· Related to SCSMD based Technology networking TCD Based Traffic Control systems)· POLICE CONTROL APP WITH FREE NETWORK · NEED NO INTERNET/NETWORK FOR OPERATION.· WORKING IN 1200 MTR RANGE.· Working on User Friendly IDEA PAD (Transforming Page).· GREEN WAVE CORRIDOR ACTIVATION· OPERATION WITHOUT SERVER APPLICATION.· USER FRIENDLY SAFETRANS APPLICATIONS.· FAULT RECORD ONLINE CHECK · GLOBAL HARWARE SETTING· ACTUATION SETTING ONLINE /OFFLINE THROUGH ANDRIOD 9 VERSION. BASED ON NEWCOMPACT TRAFFIC TECHNOLOGYCompact Next Generation SAFETRANS ITS Hardware & User friendly GPRS enabled Systems, Area Traffic Control System (ATCS) compatible, and Hurry Calls. and Centre Control room network Systems Advance Voltage Control with software based systems including three phase power Cross detections/spikes proof systems.Pre-timed, Vehicle Actuated ,ATCS, Manual Control, Hurry Call, Cable less linking and Flash modes of operation. 1) Built-in central control system to ensure work stability; 2) 2*48 work periods for workday and holiday setting; 3) Easy for maintenance and function extension by modular design; 4) Input AC110V/12v/24v and AC220V, Can be changed by the switch; 5) Yellow flashing or power off at night can be set; 6) Adopt RS-232 or LAN port to communicate with upper computer; 7) 32 working menus used for any period among 1~30 numbers customs can set it by choice); 8) The flashing state, frequency and time of each green signal light can be set or adjusted; 9) It can modify the current pace of running time in the running state immediately; 10) Full red, yellow flashing, step by step manual,jump in the manual,remote manual function(optional); 11) Be equipped with the hardware fault testing function (Red Light fails, Green lights up test),down grade to Yellow flash status and cut down the Red&Green light power supply when the fault happens.(Optional) 12) The output part adopts zero-test technology Change of state is under zero state switch in communication Make the drive more safe and reliable; 13) Each output all the way with independent lightning protection circuit; 14) Equipped with Installation testing capabilities and it can be used to test if each light is correctly installed. 15) 30 menus can be used for backup and recovery; 16) The setup software can operated offline Project data can be stored on the computerAlso working with Android working APP (SNOCL) Green Wave traffic signal technology.Special menu:- detector failure menu,Amber Flashing menu, total fault detection menu enable with DIP setup functions.Makes:- Safetrans ITS/Dimts/ SIEMENS/Swarco/ Firm/company to attach successfully Tested certificate on site working mini 2 junctions in Haryana Note :- NO PLC Based System Accepted.Supply & Erection of IntelligentAdvance APP Based Traffic Management System with priorty signaling , Equipped with NewTec- 520 next generation technologies With following Features. |
| 2 | Supply & erection of Antitheft Cabinet withheavy duty M.S Sheet without any Hinges with Internal lockingbolts Without door ,but lockable roof with nut bolt including base frame made with heavy duty angle stand suitable for Battery Bank & Charge Controller complete in all respects |
| 3 | Supply & Erection of LED aspects as perFollowing specifications & Standards:-Polycarbonate signal aspects of impact resistance, UV stabilized, Fast dyed, Unbreakable, rust & rain proof & anticorrosive, no metallic components parts used single walled including aluminum basket for led,s retrofit kit with brass nb, texture non reflective from surface ,hdpe detachable sun visors and LED’s based lamp from giving balanced light output intensity with tolerable limit and with appropriate colors & necessary mounting arrangements. A) RED/Amber Led,s Signal Aspect 12 Led’s Viewing angle -23deg.NEW age Matrix Design with Energy efficient circuitry system. Led,s Forward current-20maTotal no of Led’s -190no.Total consumption -10W max.Intensity of Led aspect-260cd minimumEnergyconsumputionupto 8.5 watt |
| 4 | B) Green Colour LEDs Signal Aspect/Pedestrian Green New age Matrix Design with Energy efficient circuitry system. Led’s Viewing angle -23deg.Led,s Forward current-10maTotal no of Led’s -66no.Total consumption -4W max.Intensity of Led aspect-260cd minimum |
| 5 | C) Green Colour LEDs Signal Aspect/Pedestrian Green Led’s Viewing angle -23deg.Led,s Forward current-10maTotal no of Led’s -66no.Total consumption -4W max.Intensity of Led aspect-260cd minimum |
| 6 | D) Red Colour LEDs Signal Aspect/Pedestrian Red Led’s Viewing angle -23deg.Led,s Forward current-10maTotal no of Led’s -66no.Total consumption -4W max.Intensity of Led aspect-260cd minimum QUALITY ASSURENCETUV Certified , IP65 tested approved ,EN12368 Certified In Energy Efficient Tested & Certified Makes Safetrans/Swarco/Siemens/Nippon/Philips |
| 7 | Supply & erection of8 mtr, pole with suitable 10 feet 2:” diaGalvanized bracket for overhand traffic signal aspects complete with standard specification including making suitable plinths,C.C Basefoundation with grooved nut bolts complet in all respect, Designed as per International Traffic rules & Standards.) |
| 8 | Supply of Turner type Black sheathed PP 10corecontrolcable 1mm copper Polypropylene super cable with full sheathedas per site requirement |
| 9 | b) PP 4 corecontrolcable 1mm copper Polypropylene super cable with full sheathed |
| 10 | Aspect holding Stands (Arms):-Aspect stands suitable for moving of aspects L/R & S/F position according Traffic waves. The aspect stand made withStrips duly auto tight clamps complete with all respects, |
| 11 | Power Source:-Supply & erection of UPS SYTEMS Input: -160-280a) Output: -230VAC + 0.5b) Charger:-Solar Charge Controller/SMPS basedCharging System.0-20Amp c) Power source tech (EPG):- MPWMM, Efficiency-90%d) Technology: -MBTMakes (Convergence, Green dot, Pro/Eco-lite/)This system include having Heavy Guage Sheet made Cabinets including Approved Powder Coated Finish , Theft Proof heavy Duty Angle Iron Frame Grill & Locking arrangementsfor Working Cabin etc Complete in all respects |
| 12 | Supply & erection of Sintex make Junction Boxes complete with connectors, clamps, wiring Jacks etc complete in all respects |
| 13 | Supply & erection of Side walls made with ACP/pipeFrame with Black paint/polishedas per IRC standards with HIPWhite base complete with Clamps including fitting for Aspects Modules (set of 4 or 5) |
| 14 | Supply & erection of Jumbo Big Display Count Down Timer with Three stages Display with 12 height”Digit display in Red Leds, Complete showing Red/Amber/Green Timings according IRC specifications etcADSL Connectivity with controller Make SafetransITS /Dimits / CEL/Philips/Keletron (operative with Slave & 12Volt Power source) |
| 15 | Supply & erection ofGalvanizedTraffic light pole with 6 mtr but without Brackets including Hinges,sockets complete with standard specification including making suitable plinths,C.C Basefoundation with grooved nut bolts complete in all respect, Designed as per International Traffic rules & Standards.) |
| 16 | Supply and erection Controller Co- Coordinator –Wired 220/24 operateableAndroidattachmentSystems workingwith 24V10Amp Power source. Drives 16 lamps per controller and delivers current of 2A max channel, Software Enabled working without wireless , it also working with wireless Vehicle sensor Modules Interface/Vehicle loop Camera Interface, 24VDC operation at 2.4 Watts, Accepting the command packet from AndroidDevice/system and Operating, switching of lamps as per the information command received, Packet handling (Error handling, Extraction),self programming unit 2. Technology: Micro-controller No of outputs 16 Makes Safetrans/Swarco/ANNITEC /FLAIR/SIEMENS/KELTRON/NIPPONNote:- With 5 year Free Maintenance and replacements against any manufacturing defect or malfunctioning |