Command Area Development Authority-CADA has published Renovation Of Semi Circular Pipe Water Course And Road Crossing At Temple Doli. . Submission Date for this Tender is 04-10-2021. Water Course Tenders in Kota Rajasthan. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 24-Sep-2021 | Corrigendum | Date | 04-10-2021 |
Sl. No. | Item Description |
1 | Excavation including loading unloading disposal and dressing of excavated earth within initial lead of 50mtr. & lift up to 1.50 mtr. in dry or moist including dressing of excavated area de-watering wherever required complete in all respect. Hard/dense soil. |
2 | Earth work in rough (Borrow area) excavation for embankment in hard soil, moorum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and braking of clods, sorting of grass, pebbles etc. and dressing when compacted by sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of standard proctor density with initial lift of 1.5mtr. (excluding charges for compaction and watering) including loading and unloading where required complete in all respect. (a) with initial lead of 250mtr. |
3 | Compaction of earth or highly weathered strata (a) by manually or plain roller |
4 | Providing and Laying in position of Cement concrete Nominal mix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3(1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusherbroken stone aggregate of maximum size upto 40mm |
5 | Random Rubble stone masonry (using R.R. Stones where 75% stones to be not less than 15 cm in size in any direction and weighing not less than 23 kg) for foundation including curing all leads of all construction materials including curing etc. complete in cement sand mortar (1:5) |
6 | R.R. stone masonry (using R.R. stones where 75% stones to be not less than 15cm in size in any direction and weighing not less than 23kg) for super structures including curing all leads of all construction materials including curing etc. complete in cement sand mortar (1:5) |
7 | Providing and laying cement concrete coping in (1:2:4) withmaximum size of crusher broken aggregate upto 20mm including shuttering etc. with all leads of material complete in all respect in thickness of: |
8 | Plaster in cement sand mortar 1:4 including racking of joints, smooth finishing & curing etc. complete including all leads of all construction materials of thickness: |
9 | Providing, laying and fixing in position RCC spun or hume pipe with collars (ISI 458-2003) in required size packed in gasket for hume or spun yarn & neatly finished with rich grout of cement mortar 1:3 perfectly air tight including testing of joints. |
10 | ProvidingandLayinginpositionofCementconcreteNominalmix (1:2:4) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excludingthe cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20 mm |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail