Construction Of Link Road From Main Road To Khangbu Mohallah Alchi By Way Of R/Wall,B/Wall Etc For Creation Of Parking Place.(Under District Plan) Construction Of Link Road From Main Road To Khangbu Mohallah Alchi By Way Of R/Wall,B/Wall Etc For Creation
Tender Overview
Project Description
Construction Of Link Road From Main Road To Khangbu Mohallah Alchi By Way Of R/Wall,B/Wall Etc For Creation Of Parking Place.(Under District Plan) Construction Of Link Road From Main Road To Khangbu Mohallah Alchi By Way Of R/Wall,B/Wall Etc For Creation Of Parking Place.(Under District Plan)
BOQ
| Sl. No. | Item Description |
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.:All kinds of soil : |
| 2 | Hard Rock (Required Blasting) |
| 3 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth asdirected: All kinds of Soil |
| 4 | Random Rubble masonry with hard stone from qyarry in foundation and plinth including levelling up with cement concrete1:6:12 (1 Cement: 6 coarse sand: 12 graded stone aggregate 20mm nominal size) upto plinth level with cement mortar 1:6 (1 Cement: 6 coarse sand) including carriagecomplete job. |
| 5 | Dry random rubble masonry with hard stone in foundation and plinth:Using Nallah Stonewithout bond stone. complete job. |
| 6 | .Dry random rubble masonry with hard stone in foundation and plinth:Using Nallah Stonewithout bond stone. Stone Available at Site. |
| 7 | Providing and laying in position cement concrete of specified grade including the cost of centring and shuttering- All work upto plinth level. 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 40mm nominal size) including carriage complete job |
| 8 | Dumping of Stone excluding cost of Stone on Horizontal on level. |
| 9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. |
| 10 | Demolishing Dry stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.