Tender For Rou Standing Order invited to carryout ROU Works at MPSPL Hazarwadi as per the terms REQUEST FOR QUOTATION 1 SPLY & FAB OF STRUCTURAL STEEL 11577-MPSPL PIPELINE Metric Ton 1 995455 27AAACH1 118B1ZC Yes DESCRIPTION => SUPPLYING, TRANSPORTATION, FABRICATING AND ERECTION/FIXING IN POSITION STRUCTURAL STEEL FOR POSTS, STRUTS, INSERTS, BOTTOM PIPE ETC, FOR SHED ERECTION/CHAIN LINK FENCING AND GATE STRUCTURE INCLUDING CUTTING TO REQUIRED SIZES, STRAIGHTENING/BENDING IF REQUIRED, EDGE PREPARATION, BOLTING, WELDING, GAS CUTTING, GRINDING, FIXING IN LINE AND LEVEL WITH TEMPORARY STAGING INCLUSIVE OF ALL BOLTS, SCREWS, FASTENERS LIKE J BOLTS, ETC, FIXING OF GATE RAIL, GROUTING WITH ORDINARY CEMENT GROUT, PREPARING THE SURFACE FOR PAINTING OF PRIMER, SUPPLY AND APPLICATION OF ONE COAT ZINC PHOSPHATE PRIMER AND TWO COATS OF SYNTHETIC ENAMEL PAINT ON STRUCTURAL STEEL POSTS/STRUTS ETC. COMPLETE AS PER SPECS. AND INSTRUCTIONS OF HPCL ENGINEER. PREPARATION OF LINE AND FABRICATION DRAWING, SUBMISSION AND OBTAINING HPCL APPROVAL IS ALSO PART OF THE JOB. 2 EXCAVATION OF EARTH 11577-MPSPL PIPELINE Cubic Meters 800 995433 27AAACH1 118B1ZC Yes DESCRIPTION => EXCAVATION (MANUALLY) IN ALL TYPES OF SOILS INCLUDING SOFT ROCK AND WEATHERED ROCK INCLUDING OBSERVING ALL NECESSARY PRECAUTIONS TO PROTECT THE PIPELINE AND ITS COATING, PROVIDING SHORING AND SHUTTERING ETC SO AS TO PREVENT COLLAPSE OF SIDE SLOPES: PROVISION OF ALL NECESSARY TOOLS, TACKLES, CONSUMABLES: DE-WATERING: PROVISION OF NECESSARY SUPERVISING PERSONNEL ETC ALL COMPLETE IN ADDITION TO ANY OTHER NECESSARY ITEMS. THE EXCAVATED SOIL IS TO BE STACKED IN HEAPS CLOSE TO THE SPOT OF EXCAVATION. 3 SOIL 11577-MPSPL PIPELINE Cubic Meters 200 27AAACH1 118B1ZC Yes DESCRIPTION => ITEM DESCRIPTION:SOIL; MATERIAL:N/A; TYPE:N/A; APPLICATION:BACK FILLING; COLOUR:N/A; SIZE:N/A; APPROVAL TO BE OBTAINED FROM SITE ENGINEER OBTAINED FROM APPROVED QUARRIES OR NEARBY LOCALITY AND TRANSPORTED TO SITE. 4 SPLY AND FILLING OF MURRUM 11577-MPSPL PIPELINE Cubic Meters 400 995432 27AAACH1 118B1ZC Yes DESCRIPTION => SUPPLY, FILLING AND COMPACTION OF MURRUM IN LAYERS OF 300 MM AT THE SITE IDENTIFIED BY HPCL INCLUDING PAYMENT OF ROYALTIES, TRANSPORTATION TO SITE FOR ALL LEADS AND LIFTS, SPREADING IN LOOSE LAYERS, PROFUSE WATERING, TAMPING ETC. ALL COMPLETE AS PER INSTRUCTIONS OF HPCL ENGINEER AT THE SITE IDENTIFIED BY HPCL.FINAL COMPACTED VOLUME SHALL BE CONSIDERED FOR PAYMENT ONLY. DECISION OF EIC WILL BE FINAL. 5 BACKFILLING OF EXCAVATED EARTH 11577-MPSPL PIPELINE Cubic Meters 800 995432 27AAACH1 118B1ZC Yes DESCRIPTION => BACKFILLING THE EXCAVATED/WASHOUT PORTIONS OF ROW WITH SOILS INCLUDING SPREADING AND COMPACTION. SUPPLY OF SOIL IS NOT INCLUDED IN THIS ITEM. 6 HIRING OF JCB 11577-MPSPL PIPELINE Hour 200 996601 27AAACH1 118B1ZC Yes DESCRIPTION => SUPPLY OF JCB ON EMERGENCY BASIS FOR EXCAVATION PURPOSE INCLUDING TRANSPORTATION TO THE SITE AND ALSO INCLUDES CHARGES FOR MANPOWER OPERATING THE JCB. 7 HIRING OF TRACTOR 11577-MPSPL PIPELINE Trip 100 996601 27AAACH1 118B1ZC Yes DESCRIPTION => SUPPLY OF TRACTOR/S INCLUSIVE OF DIESEL CHARGES FOR REMOVAL OF UNWANTED DEBRIS FROM THE SITE AND TRANSPORT IT TO THE NEAREST BUND OR ANY OTHER SUITABLE SITE. 8 SPLY AND LAYG OF PCC 11577-MPSPL PIPELINE Cubic Meters 20 995454 27AAACH1 118B1ZC Yes DESCRIPTION => PROVIDING AND LAYING PCC:(1:3:6) INCLUDING CEMENT, SAND, AGGREGATE, WATER, LABOUR, PROVISION OF TEMPORARY SIDE SHUTTERING, CENTERING KEEPING THE SAME IN POSITION DURING CONCRETING AND REMOVING THE SAME AFTER SPECIFIC PERIOD, RAMMING, TAMPING, SUPPLY OF MANPOWER TOOLS, TACKLES CURING ETC. ALL COMPLETE AS PER SPECIFICATIONS AND INSTRUCTIONS OF SITE ENGINEER. COARSE AGGREGATE SHALL BE 20 MM WELL GRADED AGGREGATE. 9 SPLY&LAYG OF PCC/RCC 11577-MPSPL PIPELINE Cubic Meters 30 995454 27AAACH1 118B1ZC Yes DESCRIPTION => PROVIDING AND LAYING PCC/RCC (1:2:4) INCLUDING CEMENT, SAND, AGGREGATE, WATER, LABOUR, PROVISION OF TEMPORARY SIDE SHUTTERING, CENTERING KEEPING THE SAME IN POSITION DURING CONCRETING AND REMOVING THE SAME AFTER SPECIFIC PERIOD, RAMMING, TAMPING, SUPPLY OF MANPOWER TOOLS, TACKLES CURING ETC. ALL COMPLETE AS PER SPECIFICATIONS AND INSTRUCTIONS OF SITE ENGINEER. COARSE AGGREGATE SHALL BE 20 MM WELL GRADED AGGREGATE. SUPPLY OF STEEL FOR REINFORCEMENT IS NOT INCLUDED IN THIS ITEM. 10 SPLY AND LAYG RR PITCHING 11577-MPSPL PIPELINE Square Meters 100 995456 27AAACH1 118B1ZC Yes DESCRIPTION => PROVIDING AND LAYING STONE/RR PITCHING OF 150 MM. THICK WITH CEMENT MORTAR 1:5 BY FILLING JOINTS IN ANY APPROVED PATTERN FOR SLOPES, BERMS, EMBANKMENTS, ETC, HAND PACKED TO SPECIFIED THICKNESS WITH SURFACE MATCHING SPECIFIED SECTION. RATE TO INCLUDE FILL JOINTS WITH CEMENT MORTAR 1:5, PREPARATION OF SURFACE, DRESSING, CURING OF JOINTS, ETC. ALL COMPLETE AS PER SPECIFICATIONS AND DIRECTIONS OF SITE ENGINEER. 11 SPLY & CONST OF BRICK MASONRY 11577-MPSPL PIPELINE Cubic Meters 50 995456 27AAACH1 118B1ZC Yes DESCRIPTION => PROVIDING AND CONSTRUCTING BRICK MASONRY IN CM 1:4 USING BRICKS OF MINIMUM COMPRESSIVE STRENGTH 35 KG/SQ.CM AND CONFORMING TO IS: 1077-1986 INCLUDING PROVIDING ALL OPENINGS AND PROJECTIONS AS PER THE DRAWING, RAKING THE JOINTS TO 1 CM DEEP, SCAFFOLDING, SOAKING OF BRICKS PRIOR TO USE AND CURING ETC COMPLETE AS PER SPECIFICATIONS FOR SUBSTRUCTURE AND SUPER STRUCTURE OF STRUCTURAL SHED. MEASUREMENT OF MASONRY WILL BE BASED ON ACTUAL THICKNESS OF WALL CONSTRUCTED. COMPLETE IN ALL RESPECT AS PER TENDER SPECIFICATION/SCOPE OF WORK ETC, AS DIRECTED BY HPCL ENGINEER-IN-CHARGE. 12 SPLY AND APPLY OF PLASTERING 11577-MPSPL PIPELINE Square Meters 100 995472 27AAACH1 118B1ZC Yes DESCRIPTION => PROVIDING AND APPLYING 20 MM THICK SAND FACED PLASTER IN 2 COATS (12 MM AND 8 MM) IN CM 1:4 ON EXTERNAL SURFACE OF BRICK WALLS USING SCREENED SAND INCLUDING FINISHING WITH SPONGE, SCAFFOLDING AND CURING ETC. COMPLETE. NO ADDITIONAL PAYMENT WILL BE MADE FOR EXTRA THICKNESS OF PLASTER TO ACHIEVE PERFECT LINE AND LEVEL. 13 PAINTING OF MARKER BOARD 11577-MPSPL PIPELINE Each 250 995473 27AAACH1 118B1ZC Yes DESCRIPTION => CARRYING OUT PAINTING ON THE 550 MM DIAMETER SIGN PLATES OF EXISTING WARNING MARKER BOARDS ALL ALONG THE PIPELINE STRETCH OF MUMBAI PUNE SOLAPUR PIPELINE RUNNING IN SATARA, SANGLI AND SOLAPUR DISTRICTS BY SCRAPPING WITH WIRE BRUSH AND CLEANING THE LOOSE PAINTS ETC. AND APPLYING 2 COATS OF ENAMEL PAINTS AFTER APPLICATION OF ONE COAT RED OXIDE PRIMER INCLUDING LETTERING IN ENGLISH/HINDI/MARATHI AS THE CASE MAY BE AS PER THE ADVISE OF ENGINEER IN-CHARGE FOR COMPLETING THE JOB IN ALL RESPECTS. RATE SHOULD BE QUOTED FOR ONE COMPLETE MARKER BOARD OR WARNING BOARD OR TLP BOXES IS CONSIDER AS 1 UNIT FOR ANY OF THE ABOVE ITEMS. 14 REPAIR OF TLP BOX DOOR 11577-MPSPL PIPELINE Each 10 995479 27AAACH1 118B1ZC Yes DESCRIPTION => CARRYOUT THE REPAIRING OR REPLACEMENT OF TLP BOX DOOR BY EDGE PREPARATION, BOLTING, WELDING, GAS CUTTING, GRINDING, FIXING IN LINE ETC. THE NECESSARY POWER SOURCE FOR WELDING, GRINDING ETC TO BE ARRANGED BY PARTY AT SITE. ALL THE ALLEN SCREWS AND CENTRAL LOCK SHOULD BE OPERATED PROPERLY AND WHEREVER ALLEN SCREWS WERE MISSING SAME NEEDED TO BE REPLACED WITH NEW ONES. PREPARING THE SURFACE FOR PAINTING OF PRIMER, SUPPLY AND APPLICATION OF ONE COAT ZINC PHOSPHATE PRIMER AND TWO COATS OF SYNTHETIC ENAMEL PAINT ON IT COMPLETE AS PER SPECS AND INSTRUCTIONS OF HPCL ENGINEER. 15 DISMANTLING OF PILLAR 11577-MPSPL PIPELINE Each 10 995431 27AAACH1 118B1ZC Yes DESCRIPTION => DISMANTLING OF EXISTING DAMAGED BOUNDARY PILLARS BY EXCAVATION FROM THE FOUNDATION FIXING OF NEW BOUNDARY PILLAR USING 150 MM THICK PCC 1:4:8, FOR THE PURPOSE OF INSTALLATION OF BOUNDARY PILLAR SIZE OF EXCAVATION REQUIRED IS 400 MM LENGTH X 100 MM WIDTH X 400 MM DEPTH. AFTER 150 MM THICK PCC 1:4:8 GROUTS, BALANCE DEPTH SHALL BE BACK FILLED USING THE SOIL EXCAVATED AT SITE. SUPPLY OF BOUNDARY PILLARS AND TRANSPORTATION ARE INCLUDED IN THE SCOPE OF THE WORK. 16 HIRING 5HP DSL DEWATERING PUMP 11577-MPSPL PIPELINE Days 5 996729 27AAACH1 118B1ZC Yes DESCRIPTION => SUPPLY OF 5 HP DIESEL PUMP FOR DE-WATERING INCLUDING THE SUPPLY OF DIESEL, TRANSPORTATION TO SITE AND OPERATING ETC. COMPLETE. 17 HIRING 5KVA DIESEL GENERATOR 11577-MPSPL PIPELINE Days 5 997319 27AAACH1 118B1ZC Yes DESCRIPTION => SUPPLY OF DG (5 KVA) FOR THE PURPOSE OF LIGHTING BULBS FOR PROVIDING SUFFICIENT ILLUMINATION AT SITE IN DARK HOURS AND CARRYING OUT WELDING AT SITE. THIS INCLUDES THE CHARGES FOR TRANSPORTING THE DG TO THE SITE, DIESEL CHARGES AND OPERATING IT BY OBSERVING ALL SAFETY PRECAUTIONS. 18 CUTTING OF GRASS/BUSH-18 MT 11577-MPSPL PIPELINE Square Meters 10000 998597 27AAACH1 118B1ZC Yes DESCRIPTION => GRASS/BUSH CUTTING. THE JOB INCLUDES CLEARING OF THE BUSHES ALONG THE 18 METER WIDE ROU WHICH ARE OBSTRUCTING THE CLEAR VIEW OF THE PIPELINE ROU BY PROVIDING REQUIRED MANPOWER, TOOL AND TACKLES ETC. 19 CUTTING OF TREE 11577-MPSPL PIPELINE Each 200 998597 27AAACH1 118B1ZC Yes DESCRIPTION => CUTTING OF TREE THE JOB INCLUDES REMOVAL OF TRESS GREATER THAN 4 INCH DIAMETER ALONG WITH THE ROU, FROM THE ROOTS. 20 HIRING OF ASSISTANCE 11577-MPSPL PIPELINE Days 100 998513 27AAACH1 118B1ZC Yes DESCRIPTION => SUPPLY OF UNSKILLED MANPOWER ON AS AND WHEN REQUIRED BASIS FOR ASSISTANCE IN THE ACTIVITIES OF ROU AND PLANT DURING ANY EMERGENCY AND UNTOWARD INCIDENTS. 21 SPLY AND LAYG RCC PIPE 11577-MPSPL PIPELINE Meters 20 995424 27AAACH1 118B1ZC Yes DESCRIPTION => SUPPLYING, LAYING, JOINING AND ALIGNING RCC HUME PIPES CONFORMING TO IS-458 LATEST EDITION BELOW APPROACH ROAD AS DIRECTED. RATE TO INCLUDE JOINING WITH CEMENT MORTAR, EXCAVATION UP TO REQUIRED DEPTH AND PROVIDING AND LAYING PCC 1:2:4 HAUNCHING @ 1M C/C , ALSO INCLUDING CUTTING, BENDING AND SUPPLY AND LAYING OF 17 SWG ANNEALED BINDING WIRE INSIDE THE HUME PIPE FOR PULLING CABLES etc