}

Consultancy For Soil Investigation And Topographical Survey Of Certain Area At Af Stn Halwara Consultancy For Soil Investigation And Topographical Survey Of Certain Area At Airforce Station Halwara, HALWARA-Punjab

Military Engineer Services-MES has published Consultancy For Soil Investigation And Topographical Survey Of Certain Area At Af Stn Halwara Consultancy For Soil Investigation And Topographical Survey Of Certain Area At Airforce Station Halwara. Submission Date for this Tender is 23-09-2021. Soil Survey Tenders in HALWARA Punjab. Bidders can get complete Tender details and download the document.




Tender Notice

29093008
Consultancy For Soil Investigation And Topographical Survey Of Certain Area At Af Stn Halwara Consultancy For Soil Investigation And Topographical Survey Of Certain Area At Airforce Station Halwara
Open Tender
Indian
Punjab
HALWARA
23-09-2021

Tender Details

Consultancy For Soil Investigation And Topographical Survey Of Certain Area At Af Stn Halwara Consultancy For Soil Investigation And Topographical Survey Of Certain Area At Airforce Station Halwara

Key Value

Document Fees
INR 500 /-
EMD
INR 48000.0 /-
Tender Value
INR 24 Lakhs /-

BOQ Items

Name of Work:CONSULTANCY FOR SOIL INVESTIGATION AND TOPOGRAPHICAL SURVEY FOR CERTAIN AREA AT AF STN HALWARA
Sl. No. Item Description
1Carrying out the soil investigation and determining SBC by field work and laboratory studies including and comprising of :- (a) Mobilisation of plants equipments including men and materials required at site of soil investigation, setting of boring/drilling as required anddemobilization of plants and equipments on completion of worketc complete (which includes conveyance of sample collected to testing lab as required for the purpose of testing). (b)Shifting of entire arrangement from one bore to another bore hole location and setting of boring/drilling as required and directed. (c) Carrying out for sub surface boring / drilling4’’ diameter bore holes upto 3.0 m depth (or refusal if met earlier) in soil strata with boulders, gravels. Arrangement for drilling / boring must be catered for by the consultants and no excuses for assuming any kind of strata shall be acceptable. “Open test pits of any depth (0.6 m to 3.0 m) will not be allowed to be performed as the sites of boreholes are in close proximity to the runway / manoeuvring surfaces.”. The graphic log should include the following :- (i) Location (ii) Date Performed (iii) Type of Exploration (iv) Surface Elevation (v) Depth of Material (vi) Sample Identification Number (vii) Classification (viii) Water Table (viii Standard Penetration Test.
2Serial Item No. 1.00 (Continued) (d) Collection of disturbed samples at every 60 mtr intervals of 3 mtr depth of bore hole dia size 100 mm or change of strata including packing and handling all complete. (e)Carrying out laboratory tests as per relevant IS for :- (i) Particle Size Analysis & Determination of Soil Constant asper IS 2720 (PART I) 1963 (ii) Natural moisture content (iii) Specific gravity (iv) Bulk and dry density (v) Shear characterstics of undisturbed samples using direct shear/triaxial shear test. (vi) Unconfined compression test (vii) Consolidation test (viii)Moisture Density relation of soils Test as per IS 2720 (f) The report to include clearly the following parameters :- (i) Safe bearing capacity of the soil (ii) Weather effect of high water table been considered or not in working out SBC (iii) Type of soil (iv) Liquid limit, Plastic Limit, and Pasticty index of soil as per IS 2720 (Part V) 1975
3Conducting Test for CBR (California Bearing Ratio) of Laboratory Compacted Soils as per IS 2720(PART XVI)1965.
4Determination of Modulus of Subgrade Reaction (K value in Kg / cubic cm) as per IS 9214: 1979 by using 75 cm diameter Plate at locations on the Left and Right side of the Runway and Parallel Taxi Track in a staggered manner as directed by the GE. *IS 2720-1 (1983) is not relevant for determination of Modulus of Subgrade Reaction test.
5Counsultancy charges for digital topographical survey using electronic total station covering features, structures, pavements, sewage lines, drains, culverts, tension wire, roads, kutcha/pacca paths, utilities, major trees, manholes, boundary wall/fencing etc. as per site requirements. The instrument to be shifted after 30m Interval. The Total Station Used should have least count 1" to 2". The BM to be established every 30m so that the instrumnet may be placed between the BM and checking of level be done from both the BM. The survey should start from one point and it should end at the same point where it had started. The grid for pavement facilities to be 2m x 2m and the grid for shoulder and remaining Air Field to be 10m x 10m. The qty calculation for grade correction, earth work and darins to be submitted along with level sheet of all facility. Submit two sets of drawings alongwith soft copy of map in autocard, contour at 0.50 mtr interval including all tools, plants, equipment and manpower etc. to be marked on the plan separately complete.Submission ofdetailed report by doing and including the followingas per direction and satisfaction of Engineer-in-Charge :- (a) Analysis of existing drainage pattern (with the help of drawings) of surface run-off of rainwater based on topography in the Airfield Area (which includes the complete area surrounding the Main Runway, Parallel Taxi Track and other areas as directed). Note :- This report shall include drawings indicating existing drains and their capacity, dimensions etc
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail