|
| 1 | PROVISIONING OF PRE-FABRICATED STRUCTURE FOR NEXT GENERATION SONAR CORE TEAM ON 5TH FLOOR TERRACE & TECHNOLOGY DEMONSTRATOR ROOM ON IST FLOOR OF MAIN ADMIN BUILDING DGNP(V) |
| 2 | Surface Preparation for Erection of the Pre-Fabricated Structures and laying of Vitrified Floor Tiles |
| 3 | Erection of Poly Urethane Foam (PUF) Modular Outer Walls with two doors and Nine Windows (powder coated aluminium frame with glass, ACP Sheet &99% heat rejection film) |
| 4 | Internal network, 24 port managed network switch |
| 5 | False Ceiling with PUF sheet |
| 6 | Rolling Blinds for all windows and glass partitions |
| 7 | Electrical Fittings (Switches, Elect Panel, LED lights, wall mount fans, exhaust fans etc) and Accessories. |
| 8 | Vitrified Floor Tiles with side scutting |
| 9 | Humidity control cooling device with all accessories 1.5 TR (02 Nos)with cable, copper pipe (1.5T) |
| 10 | Erection of PUF Modular Roof. |
| 11 | Modular furniture Executive Office Table, modular partitioned workstations, executive & visitor chairs, storage cupboard, wardrobe L shaped sofa etc) in all the partitioned areas |
| 12 | Internal cabling for LAN and Telephone |
| 13 | Powder coated aluminium frame partitions (with glass, ACP Sheet & stickering) inside the structure with main isolating partitions made of PUF, 06 doors (powder coated aluminium frame with glass, ACP Sheet & stickering) |
| 14 | Fabrication of basement with 8’inch x 4’ inch iron channel with 8’ mm thick iron sheet on top |
| 15 | Design supply and fixing of fabric ceiling withgyp boardnecessary frame / channel in gauge |
| 16 | Supply and fixing of 32W LED lighting |
| 17 | Supply and fixing of wall paper in metallic / aluminium designer wall paper |
| 18 | Wall panelling with 18mm hardwood channel and fixing withveneer melamine finish |
| 19 | Supply and installation of electrical wiring with cancelled pvc pipe & fire resistance copper wires 5am/15am socket switches |
| 20 | Humidity Control Cooling device with all accessories 2.0 TR 01 Nos) with cable, copper pipe |
| 21 | Setting of Toughened glass/door with locking and floor spring |
| 22 | Refurbishment of floor covering vitrified lay 08mm thickness with side skirting |
| 23 | Transport and Installations |
| 24 | Total in Figures |
| 25 | Total quoted amount including all taxes in Words |