Procurement Of Spares For Su-30 Mki Aircraft Procurement Of Spares For Su-30 Mki Aircraft , Generator Of Oxygen , Collar Spring , Insert , Spring , Bearing , Gasket , Extractor For Gun , Brech Block Lever For Gun , Blanking ,
Tender Overview
Project Description
Procurement Of Spares For Su-30 Mki Aircraft Procurement Of Spares For Su-30 Mki Aircraft , Generator Of Oxygen , Collar Spring , Insert , Spring , Bearing , Gasket , Extractor For Gun , Brech Block Lever For Gun , Blanking , Brech Block For Gun , Bellows , Spring , Clamp , Filter , Lever , Fairing Pin , Loom , Pipe , Profile , Washer , Outlet Pipe Line , Valve , Sealing Ring For Ork-115 Lower Block , Outlet Tubing , Valve Lh For Gun , Gyro Horizon From Rif-03 Complete Set , Hose Drum Drive Chain Asembly , Chain Assembly ( Tensator Drive €“ Primary ) , Air Speed And Mach-Number-Indicator , Signal Lamp Assembly , Hud Camera Chvc ( Dvrs ) , Motor Drive Unit Fr 101 , Chain Assembly ( Tensator Secondary Drive ) , Motor Unit Assembly , Hose Drum General Arrangement , Temperature Transducer , Tensator Drive Assembly
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 20-Sep-2021 | CORRIGENDUM NO.1 | Other | 29-Sep-2021 |
| 2 | 27-Sep-2021 | CORRIGENDUM NO. 1 | Date | 18-Oct-2021 |
| 3 | 30-Sep-2021 | CORRIGENDUM NO.2 | Other | 18-Oct-2021 |
BOQ
| Sl. No. | Item Description |
| 1 | GENERATOR OF OXYGEN |
| 2 | COLLAR SPRING |
| 3 | INSERT |
| 4 | SPRING |
| 5 | BEARING |
| 6 | GASKET |
| 7 | EXTRACTOR FOR GUN |
| 8 | BRECH BLOCK LEVER FOR GUN |
| 9 | BLANKING |
| 10 | BRECH BLOCK FOR GUN |
| 11 | BELLOWS |
| 12 | SPRING |
| 13 | CLAMP |
| 14 | FILTER |
| 15 | LEVER |
| 16 | FAIRING PIN |
| 17 | LOOM |
| 18 | PIPE |
| 19 | PROFILE |
| 20 | WASHER |
| 21 | OUTLET PIPE LINE |
| 22 | VALVE |
| 23 | SEALING RING FOR ORK-115 LOWER BLOCK |
| 24 | OUTLET TUBING |
| 25 | VALVE LH FOR GUN |
| 26 | GYRO HORIZON FROM RIF-03 COMPLETE SET |
| 27 | HOSE DRUM DRIVE CHAIN ASEMBLY |
| 28 | CHAIN ASSEMBLY (TENSATOR DRIVE – PRIMARY) |
| 29 | AIR SPEED AND MACH-NUMBER-INDICATOR |
| 30 | SIGNAL LAMP ASSEMBLY |
| 31 | HUD CAMERA CHVC(DVRS) |
| 32 | MOTOR DRIVE UNIT FR 101 |
| 33 | CHAIN ASSEMBLY (TENSATOR SECONDARY DRIVE) |
| 34 | MOTOR UNIT ASSEMBLY |
| 35 | HOSE DRUM GENERAL ARRANGEMENT |
| 36 | TEMPERATURE TRANSDUCER |
| 37 | TENSATOR DRIVE ASSEMBLY |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender