Kerala State Electricity Board-KSEB has published Constructing 1425M 11Kv Sc Line From Uppoodu To Cherupoika For Avoiding Cross Country Under Ele.Section, East Kallada Work Code 458334112100111 Constructing 1425M 11Kv Sc Line From Uppoodu To Cherupoika For Avoiding Cross Country ( Adalath 2020 Work . Submission Date for this Tender is 15-09-2021. Transmission Line Tenders in East Kallada Kerala. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). |
2 | Loading HT "A" type pole from the stacking place and unloading the same at work site (transport by vehicle). |
3 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading. |
4 | Transporting poles by hired vehicle to a distance beyond 5km and carrying upto 4 poles. (Running km). |
5 | Dismantling (without damage) one 11kV PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. |
6 | Dismantling one Channel cross arm from existing DP structure, and bringing back to section store. |
7 | Drilling hole of various sizes on existing Channel/Cross Arm. |
8 | Drilling oval shaped hole of various sizes on existing Channel/Cross Arm/GI/MS cleat etc. |
9 | Fitting and erecting one HT PSC Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads. |
10 | Fitting and erecting one HT "A" type Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads. |
11 | Additional rate for providing one disc set on any type of HT pole for making cut point. |
12 | Fitting and erecting one HT DP using PSC pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads. |
13 | Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit. |
14 | Fitting and providing one Strut using HT PSC pole incl. digging & back filling pit. |
15 | Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole incl. digging & back filling pits. |
16 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite. |
17 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Soft Rock. |
18 | Additional rate for excavation of Pit for "A" type pole in Laterite. |
19 | Stringing of one km 11kV line with ACSR Raccoon (3 conductors) incl. cutting and removing tree branches wherever necessary. |
20 | Providing one Earth using earth pipe incl. digging separate pit at standard distance away from the pole/structure & backfilling. |
21 | Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling. |
22 | Fitting one set AB switch and giving connection |
23 | Conveyance of one km 11kV line materials from section store/stacking place to the work site (excluding poles). |
24 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole incl. conveyance of materials. |
25 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP incl. conveyance of materials. |
26 | Fitting one Additional 2.4m/3m Channel cross arm (75x40x6mm), in existing 11kV DP incl. conveyance of materials. |
27 | Insertion of one HT PSC pole in existing HT/LT line incl. digging & back filling pit, fitting cross arm, insulator, binding etc. |
28 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. |
29 | Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. |
30 | Dismantling (without damage) LT stay incl. digging pit in all classes of soil and backfilling |
31 | Dismantling (without damage) one LT PSC/RCC Strut pole incl. removal of clamps and stacking. |
32 | Transferring LT Sph 2/3 wire OH line to newly erected HT/LT pole and refitting all items to the new pole. |
33 | Transferring LT 3ph 4/5 wire OH line to newly erected HT/LT pole and refitting all items to the new pole. |
34 | Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion. |
35 | Dismantling (without damage) one km LT 3ph 4 wire OH line, cross arms, insulators and stacking the conductors in rolls. |
36 | Dismantling (without damage) one km LT additional conductor line, cross arms, insulators and stacking the conductors in rolls. |
37 | Stringing one km LT Sph 3 wire line (Rabbit for Ph&N, Weasel for St.main) incl. fitting cross arm etc. removing touchings and conveyance of materials. |
38 | Stringing one km LT 3ph 5 wire line (Rabbit for Ph and Weasel for N&St.main) incl. fitting cross arm etc. removing touchings and conveyance of materials. |
39 | Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole and reconnecting. |
40 | Dismantling one 1x40W fluorescent tube fitting from the existing pole and refitting the same on newly erected pole and reconnecting. |
41 | Providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of all material (as per specification). |