|
| 1 | Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc. complete. complying with std. specifications.SS 20 B |
| 2 | Collection, supply and filling with well gravel including cost and conveyance of all materials and stacking them at road side to departmental gauge for pre-measurement including all labour charges for filling etc., complete as per standard specification. |
| 3 | Plain Cement Concrete 1:4:8 Mix (one part cement, Four part sand and Eight part of aggrigate) using 40mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications. |
| 4 | Supplying and erecting Centering for sides and soffits including supports and strutting upto 3.29 m high for plane surfaces such as RCC slabs, Rectanular beams, Lintels and Stair case waist slabs conopy etc., in all floors with all cross bracings using mild steel sheets of size 90cm x 60cm and BG 10 stiffened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over country wood joists of size 10cm x 6.50cm spaced at about 90cm centre to centre and supported by Casuarian props of 10cm to 13cm dia spaced at 75cm centre to centre etc., complete and as directed by departmental Engineers. |
| 5 | A)Footing |
| 6 | B) Columns |
| 7 | Supplying fabricating and placing in position of steel rods using TMT. or Ribbed Tor Steel including cost of binding wire, cost of labour charges for fabrication and placing in positionetc. Complete. Complying with std. specifications. |
| 8 | Reinforced Cement Concrete 1:1½:3 Mix (One part cement, one and half part sand and three part of aggregate)using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing but excluding cost of reinforcement etc.Complete with std.Specifications. |
| 9 | Brick Work in Cement Mortor 1:5 Mix (one cement, five sand) using new best II Class Bricks of size9 ” x 4 3/8 “x 2 3/4 ”from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications |
| 10 | Supplying and fixing of M.S.grill of approved design for doors. Windows and ventilators using necessary mild steel flats for inner and outermembers which should be fixed to window frames inclusive of priming coat of best approved quality red oxide primer etc., complete complying with standard specifications. |
| 11 | Plastering with cement mortar 1:5 (one cement three sand) mix to 12mm thick and including hacking the surfaces and providing necessary cement mortar nosing beading as per size, specification wherever necessary using the same mix as directed by the departmental officers etc., complete complying with standard specifications. |
| 12 | Plastering with cement mortar 1: 3 mix to 12mm thick including cost and conveyance of all materials to site including curing etc.,complete as per standard specification |
| 13 | Painting the new walls two coats over one coat ofpriming with best Emulsion paint ofapproved colour andquality includingpreparation ofsurfaceandfinishing neatly etc., complete complying with standard specification and as directed by the department officers etc., complete complying with standard specifications. |
| 14 | Painting two coats over new iron works such as steel door, windows, ventilators, window bars, balustrades etc., with best quality enamel paint approved colour over the existing priming coat etc., complete complying with standard specifications and as directed by the departmental officers. |
| 15 | Supply and Fixing of FRP Standard Slide incuding all cost of materials.etc., complete complying with standard specifications and as directed by the departmental officers. |
| 16 | Supply and fixing of FRP Double Swing chair seat incuding all cost of materials.etc., complete complying with standard specifications and as directed by the departmental officers. |
| 17 | Supplying and fixing of 4 Seater See saw(FRP) and using 1 1/2 \" Galvanished \" B \" Class pipe Frame and 2\" Galvanished \" C \" Class pipe See saw Rail ,and FRP Seat (Glass Fibre) Heigh of 1 1/2\" FT , Width of5\" FT Including Cost of all Material And Labour Charges etc. |
| 18 | Supply and fixing of FRP Park BenchIncluding Cost of all Material And Labour Charges etc.. complete complying with standard specifications and as directed by the departmental officers. |
| 19 | Supplying of garden decor rabbitDust bin 4 feet height and using Glass Fibre(6 Layer Bonding) Including Cost of all Material And Labour Charges etc.. complete complying with standard specifications and as directed by the departmental officers. |
| 20 | Geophysical Investigation charges including preparation of geophysical report as per TWAD Board type circular including all cost of transportation and handling charges etc.,complete |
| 21 | Drilling of 150mm(6\") diaVertical clear bores in Hard rock in any habitation any where in Salem District to any required depth as directed b y the officers concerned including labour charges for insertingM.S/P.V.C Casing pipes to any required depth , assembling in the drilled hole including welding joints if necessary . Grouting the casing pipes including conducting proper yield test at final depth (by providing90 \" V\"Notch fitted in a formed channel and the correct yield at the time of free flow in the channel while flushing the bore after completion of drilling process should be ascertained of and reported )including Bore cover transportation. crew and fuel charges for rigs and supporting Vehicles from one place to another etc Complete and as directed by officers Concerned. |
| 22 | Drilling of 150mm dia.bore wells in overburden soil including labour charges for insertion of casing pipes |
| 23 | Drilling of 150mm dia.bore wells in hard rock areas any where in Tamil Nadu including transportation to the worksite in hard rock areas and developing the bore wells |
| 24 | Supply and delivery of150mm (CM)6KSCpvc casing pipe (PVC CASING PIPEAS PER IS 12818) for bore well including cost and conveyance of material and labour charge etc complete. |
| 25 | Supply and delivery of wet type 50LPM x 200m HeadThree phase Bore well submersible pumpset with motor and confirming to IS 8034/2002with ISI markingas per standard specification. The pump set should be supplied with 5Mflat submersible motor etc.,complete. complying with std. specifications. |
| 26 | Supply and deliveryof 5hp three phase DOL panel board as per standard specification with two level guard and auto start etc.,complete. complying with std. specifications. |
| 27 | Supply and deliveryof 50mm UPVC column as per standard specification with two level guard and auto start etc.,complete. complying with std. specifications. |
| 28 | Supply and delivery of 4.00sqmm flat type PVC insulated 3core copper cable confirming to IS694/1990 with ISI Marking suitable for submersible pump set etc complete. |
| 29 | Supply and run of 4x6sq.mm. (84/0.3) PVC insulated SC unsheathed copper conductor of 1100V grade in 32mm dia GI pipe (Class\"B\") suitably bent at both ends with necessary angle iron upright and end supports for mains SD 73 |
| 30 | Supply and run of 4x6sq.mm. (84/0.3) PVC insulated SC unsheathed copper conductor of 1100V on 7/20 GI bearer wire for service connection mains SD 68 |
| 31 | ?Supply and fixing of TNEB meter board suitable for 32A three phase service connection with 3Nos. 32A fuse unit (500V) 32A neutral link and earth link (1\"x1/8\"copper flat) on TW plank of size 600mmx450mmx19mm with supporting TW reepers of 1\" thick an either side with painting with suitable bolt and nuts for fixing the TW plank on wall with earth connection and interconnection with 7/20 PVC insulated copper wire from EB meter to fuse unitSD 127 |
| 32 | Labour charges for the erection of submersible pumpset in borewell/openwell including fixing and jointing submersible cable with proper clamps upto the starter to required depth and also fixing of riser pipes to the required depth valves erection clamps, pressure gauges upto the exterior wall of pump room and erection of panel board consisting of TPICN switches starter, Voltmeter, Ammeter, three pilot (indicating) lamps capacitor single phasing preventor,water level guard and laying and jointing the cables and twin earthing as per IE rules etc., complete and testing the pumpset and trail run for 10 days. |