Military Engineer Services-MES has published Repair / Maint Of Solar Water Heating System, Geysers And Summer Appliances Including Allied Works At Nams. Repair / Maint Of Solar Water Heating System, Geysers And Summer Appliances Including Allied Works At Nams.. Submission Date for this Tender is 27-09-2021. Air Conditioner Tenders in NAMS CANTT Punjab. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 06-Sep-2021 | Amendment No 1 | BOQ | 20-09-2021 |
2 | 20-Sep-2021 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 27-09-2021 |
Sl. No. | Item Description |
1 | BOQ |
2 | Servicing/ Inspection of water cooler of any cap/type/make installed at different units at NAMS on site including disconnecting electric and water connection of water cooler finding of defect including dismantling of compressor, relay, capacitor, thermostat, motor, PVC hose pipe, condensing coil including fixing new spares complete as required all as specified and directed by Engineer -in-charge. Note (i) The new spare parts required to make the water cooler serviceable shall be measured and paid separately under relavent items & cost of fixing ofthe same included in this item. (ii) Transportation charges for carrying the plant from site to workshop and back at site incl testing & fixing are deemed to be included in quoted rates. (iii) Replacement of minor spare parts whose cost are less than 100 rupees including cleaning of water tank, serciving etc are deemed to be included in quoted rates. no extra cost shall be paid for the same. (iv) Rectifying, detecting the Gas leakage, Flexing, Pressuring, vacumising, filling for charging of refrigerant gas shall be included in the quoted rate no extra cost paid to the contractor for the same. Refrigerant gas shall be measured and paid seperately under relevent item. |
3 | Supply only Hermetic compressor unit for water cooler of 40/80 ltr Complete all as specified and as directed by Engr-in-Charge. |
4 | Supply only Hermetic compressor unit for water cooler of 60/120 ltr cap Complete all as specified and as directed by Engr-in-Charge. |
5 | Supply only Hermetic compressor unit for water cooler of 150 ltr cap Complete all as specified and as directed by Engr-in-Charge. |
6 | Supply only starting relay CAJ-2612 Complete all as specified and as directed by Engr-in-Charge. |
7 | Supply only over load protection relay suitablefor any cap of water coolerComplete all as specified and as directed by Engr-in-Charge. |
8 | Supply only starting capacitor 40-80 Mfd for any cap of water cooler Complete all as specified and as directed by Engr-in-Charge. |
9 | Supply only starting capacitor 100-120 Mfd for any cap of water cooler Complete all as specified and as directed by Engr-in-Charge. |
10 | Supply only thermostat suitable for any cap water cooler Complete all as specified and as directed by Engr-in-Charge. |
11 | Supply only fan motor of capacity 1/10 to 1/35 HP 50c/s, 230 voltsComplete all as specified and as directed by Engr-in-Charge. |
12 | Supply only PVC hose waste pipe with SS clamp suitable for water cooler of any capacity Complete all as specified and as directed by Engr-in-Charge. |
13 | Supply only drain tray , stainless steel for water cooler of any cap complete all as specified and as directed. |
14 | Material and Labourfor replacement of old damage rusted water cooler body with new water cooler body fabricated from MS Sheet 18 Guage thick, necessary angle iron work of required size, cleaning, washing the sheetwith moderate solution, duly painted with two coats of synthetic enamel paint over one coat of red oxide primer including writing MES/SM number with white paint of appropriate size complete all as directed byEngineer InCharge. |
15 | Servicing /Inspection of refrigerators of any cap/type/make installed at different units atNAMS on site, finding of defect including dismentling of compressor, relay, capacitor, thermostat, motor, condensing coil , door, rubber gasket, ice box assembly including fixing new spares complete as required all as specified and directed by Engineer -in-charge. Note (i) The new spare parts required to make the water cooler serviceable shall be measured and paid separately under relavent items & cost of fixing ofthe same included in this item. (ii) Transportation charges for carrying the plant from site to workshop and back at site incl testing & fixing are deemed to be included in quoted rates. (iii) Replacement of minor spare parts whose cost are less than 100 rupees including cleaning of water tank, serciving etc are deemed to be included in quoted rates. no extra cost shall be paid for the same. (iv) Rectifying, detecting the Gas leakage, Flexing, Pressuring,,vacumising, filling for charging of refrigerant gas shall be included in the quoted rate no extra cost paid to the contractor for the same. Refrigerant gas shall be measured and paid seperately under relevent item. |
16 | Supply only hermetic compressor unit for refrigerator of capacity 165-200 Complete all as specified and as directed by Engr-in-Charge. |
17 | Supply only hermetic compressor unit for refrigerator of capacity 210-360. Complete all as specified and as directed by Engr-in-Charge. |
18 | Supply only over load protection relay for refrigerator of any capacity any type Complete all as specified and as directed by Engr-in-Charge. |
19 | Supply onlystarting relay for refrigerator of any cap/ any type Complete all as specified and as directed by Engr-in-Charge. |
20 | Supply onlythermostat for refrigerator of any capacity/any type Complete all as specified and as directed by Engr-in-Charge. |
21 | Supply onlyRefrigerator shelve(jaali type) for refrigerator of cap 170 Ltrs - 360 Ltrs Complete all as specified and as directed by Engr-in-Charge. |
22 | Supply only PC Board for 270 to 360 ltr refrigerator suitable make all as specified and as directed by Engr-in-Charge. |
23 | Supply only timer for refrigerator complete all as specfied and as directed. |
24 | Servicing /.Inspection of Deep Freezer of any cap/type/make installed at different units atNAMS on site, finding of defect including dismentling of compressor, relay, capacitor, thermostat, motor, condensing coil , door, rubber gasket, ice box assembly including fixing new spares complete as required all as specified and directed by Engineer -in-charge. Note (a) The new spare parts required to make the water cooler serviceable shall be measured and paid separately under relavent items. (b) Transportation charges for carrying the plant from site to workshop and back at site incl testing & fixing are deemed to be included in quoted rates. (c) Replacement of minor spare parts whose cost are less than 100 rupees including cleaning of water tank, serciving etc are deemed to be included in quoted rates. no extra cost shall be paid for the same (iv) Rectifying, detecting the Gas leakage, Flexing, Pressuring,,vacumising, filling for charging of refrigerant gas shall be included in the quoted rate no extra cost paid to the contractor for the same. Refrigerant gas shall be measured and paid seperately under relevent item. |
25 | Supply onlyhermetic compressor unit ofdeep freezer of 300-400 ltr capacity Complete all as specified and as directed by Engr-in-Charge. |
26 | Supply onlyhermetic compressor unit ofdeep freezer of 100-205 ltr capacity Complete all as specified and as directed by Engr-in-Charge. |
27 | Supply onlyfan motor for deep freezer upto 400Ltrs cap Complete all as specified and as directed by Engr-in-Charge. |
28 | Servicing/ Inspection of AC window type of any cap/type/make installed at different units atNAMS on site, finding of defect including dismentling of compressor, blower motor, evaporating coil, relay,thermostat,condensing coil , including fixing new spares complete as required all as specified and directed by Engineer -in-charge. Note (i) The new spare parts required to make the water cooler serviceable shall be measured and paid separately under relavent items & cost of fixing ofthe same included in this item. (ii) Transportation charges for carrying the plant from site to workshop and back at site incl testing & fixing are deemed to be included in quoted rates. (iii) Replacement of minor spare parts whose cost are less than 100 rupees including cleaning of water tank, serciving etc are deemed to be included in quoted rates. no extra cost shall be paid for the same. (iv) Rectifying, detecting the Gas leakage, Flexing, Pressuring,,vacumising, filling for charging of refrigerant gas shall be included in the quoted rate no extra cost paid to the contractor for the same. Refrigerant gas shall be measured and paid seperately under relevent item. |
29 | Supply onlyrotary hermetic compressor unit for window air conditioner 2 Ton capacity,specifications as per existing Complete all as specified and as directed by Engr-in-Charge. |
30 | Supply onlyrotary hermetic compressor unit for window air conditioner 1.5 Ton capacity,specifications as per existing Complete all as specified and as directed by Engr-in-Charge. |
31 | Supply only condensing coil for window air conditioner of cap 2 ton capacity Complete all as specified and as directed by Engr-in-Charge. |
32 | Supply only condensing coil for window air conditioner of cap 1.5ton capacity Complete all as specified and as directed by Engr-in-Charge. |
33 | Supply only evaporating coil for window air conditioner of cap 2ton capacity Complete all as specified and as directed by Engr-in-Charge. |
34 | Supply only evaporating coil for window air conditioner of cap 1.5ton capacity Complete all as specified and as directed by Engr-in-Charge. |
35 | Supply only thermostat for window AC 1.5/2 ton as per existng make complete all as specifeid and directed. |
36 | Supply onlymicron filter suitable for 1.5/2 Ton window AC Complete all as specified and as directed by Engr-in-Charge. |
37 | Supply onlyblower motor for window air conditioner of capacity 1.5 /2 ton, type & specification as per existing Complete all as specified and as directed by Engr-in-Charge. |
38 | M&L for Window AC front grill complete as per existing for 1.5 Ton Complete all as specified and as directed by Engr-in-Charge. |
39 | Servicing / Inspection of AC Split type of any cap/type/make installed at different units atNAMS on site, finding of defect including dismentling of compressor, blower motor, evaporating coil, relay,thermostat,condensing coil , including fixing new spares complete as required all as specified and directed by Engineer -in-charge. Note (i) The new spare parts required to make the water cooler serviceable shall be measured and paid separately under relavent items & cost of fixing ofthe same included in this item. (ii) Transportation charges for carrying the plant from site to workshop and back at site incl testing & fixing are deemed to be included in quoted rates. (iii) Replacement of minor spare parts whose cost are less than 100 rupees including cleaning of water tank, serciving etc are deemed to be included in quoted rates. no extra cost shall be paid for the same. (iv) Rectifying, detecting the Gas leakage, Flexing, Pressuring,,vacumising, filling for charging of refrigerant gas shall be included in the quoted rate no extra cost paid to the contractor for the same. Refrigerant gas shall be measured and paid seperately under relevent item. |
40 | Supply onlyhermetic compressor unit for split air conditioner 2Ton capacity and specifications as per existingcomplete all as specified and directed by Engineer-In-Charge. |
41 | Supply onlyhermetic compressor unit for split air conditioner 1.5Ton capacity and specifications as per existingcomplete all as specified and directed by Engineer-In-Charge. |
42 | Supply onlycondensing coil for split air conditionner of cap 1.5 ton capacity, complete all as specified and directed by engineer-in-charge |
43 | Supply only evaporating coil for split air conditioner of cap 1.5/2ton capacity, Complete all as specified and as directed by Engr-in-Charge. |
44 | Supply onlyblower motor for outdoor unit of split air conditioner of capacity 1.5 ton, specification as per existing complete all as directed by engineer-in-charge |
45 | Supply only PCB for split air conditioner of capacity 1.5/2 ton, complete all as specified and directed by engineer-in-charge . |
46 | Supply only thermostat for Split AC 1.5/2 ton as per existng make complete all as specifeid and directed. |
47 | Supply onlyremote control for split/window AC of existing make Complete all as specified and as directed by Engr-in-Charge. |
48 | Supply onlyswing motor, 230 v AC, 4-6 RPM for split/window AC of any make complete all as specfied and as directed. |
49 | Supply only micron filter suitable for 1.5/2 Ton split AC |
50 | Supply only filter strainer brass/copper for 1.5/2 ton. |
51 | Supply onlyfan motor for indoor unit of 1.5/2 Ton split ACComplete all as specified and as directed by Engr-in-Charge. |
52 | Supply onlywater overflow PVC pipe heavy duty on wall/floor of size15mm dia for water drainage. |
53 | Supply onlycopper tubing 6mmto12 mm dia andthickness of copper tubing shall not be less than as per OEM. |
54 | Taking out and refixing at another location window type and split typeAC 1.5 Ton/2 Ton including making hole in wall required sizeand making good disturb surface including electrical connection complete all a specified and directed. |
55 | M & Lin replacement of split Air conditioner outdoor unit wall mounting stand for suitable size of 1.5/2.0 TR split AC complete all as specified. |
56 | Supply onlyblower motor for desert cooler 230volts, 1/5 HP , specification as per existing complete all as directed by engineer-in-charge . |
57 | Repalcement of old unsv/damage khas-khas pads for three sides, for desert cooler complete all as specified and directed by engineer-in-charge. |
58 | S&Fing in replacement of old worn out/rusted desert cooler body frame of capacity 4000 Cum/Hr made of 20 gauge PGI sheet suitable for evaporative type desert cooler of size 67x67x87 cm including side panel - 03 Nos with 20 gause PGI sheet and water tank height 20 cm & grill with fins electrical wiring and connection with ON/OFF switch piano type with distribution PVC cup and elbow PVC pipe connection ,including duly painted complete body internally and externally and all side panel inner and outer side with two coat with synthetic enamel paint of approved colour over a coat of red oxide primer complete all as specified and as directed. |
59 | S&F in repairs side shutter as perduly painted complete all as specified and directed by Engineer in Charge . |
60 | Replacement of old unserviceable/damage submersible water pump with new submersible water pump , AC operated, single phase, capacity 1/20 HP, 240 Volts suitable for desert cooler and making necessary connection to power supply including flexible PVC tubing of required size,complete all as specified and directed byEngr-in-charge. |
61 | Replacement of old unserviceable/ damage capacitor, 4 Mfd, 50Hz, complete all as specified and as directed by Engineer-In-Charge |
62 | Replacement of old unserviceable/ damage selector switch 3 speeds, 240 volts, 50Hz, complete all as specified and as directed by Engineer-In-Charge |
63 | S&F in repairs switch piano type 5 Amp, flush type, single pole complete all as specified. |
64 | Material and Labour for spray painting of Desert cooler of any Capacity & Make with onecoat of synthetic paint after scraping & cleaning the surface complete as directed by Engr-in-charge. |
65 | S&F fan blades (Steel) for desert cooler in replacementas per sample all as specified. |
66 | S&F PVC distributorsin replacement with PVC Elbows/junction/bend for desert cooler |
67 | M&L for PVC pipe 3/8 for desert cooler in replacement complete all as directed by Engr-in-Charge. |
68 | Supply only refrigerant gas of" R 134a " suitable for compressor of water cooler/Refrigerator/Deep freezer and AC of any make, capacity and type complete all as specified and directed by Engineer-in-charge. |
69 | Supply only refrigerant gas of" R 410 " suitable for compressor of water cooler/Refrigerator/Deep freezer and AC of any make, capacity and type complete all as specified and directed by Engineer-in-charge. |
70 | Supply only refrigerant gas of" R 22 " suitable for compressor of water cooler/Refrigerator/Deep freezer and AC of any make, capacity and type complete all as specified and directed by Engineer-in-charge. |
71 | S&F in replacementPVC cable flexible round/flat 3 Core Copper conductor cable 6 sqmm including taking out old unsv burnt out cable complete all as specified and directed by Engineer-in-charge. |
72 | S&F in replacementPVC cable flexible round/flat 3 Core Copper conductor cable 1.5 sqmm including taking out old unsv burnt out cable complete all as specified and directed by Engineer-in-charge. |
73 | S&F in replacement sheet metal powder enclosure powder coated versatile double door 2way (SPN) distribution board for MCB provisions 230Volt, 50Hz AC with neutrallink , earth bar complete all as specified. |
74 | S&F 3 pin Plug Top 15 Amp in replacementISI Mark. |
75 | S&F 3 pin Plug Top 5 Amp in replacement Complete all as specified and as directed by Engr-in-Charge. |
76 | S&Fin replacement MCBs single pole (SP) 5 to 32 Amps with 10 KA breaking capacity of "C" series in distribution boards Complete all as specified and as directed by Engr-in-Charge. |
77 | S&F in replacementMCBs single pole and neutral (SPN) 40 Amps with 10 KA breaking capacity of "C" series in distribution boards Complete all as specified and as directed by Engr-in-Charge. |
78 | Dismantlingand taking out of voltage stabilizer of capacity 0.5 KVA to 5.0 KVA single phase 50 HZ detecting and rectifying faults and refixing , the repair of parts will be paid and measured seperately under items No 61 & 63 complete all as specified and directed |
79 | Dismantling of main transformer copper wound 160-250 volt stamping and material & labour for reassembling the stamping re-winding of main transformersinglephase 50HZ with supper enameled copper winding wire of correct size tums taping an vanishing of size 0.5 KVA to 1KVA for PCB relay, resistance bakeilts mounted 2 to 3 pin connection with brass strip, Amp meter (0-30) Amps, Voltmeter(0-30)volts Kit Kat indicator and replacement to flexible wire 3 Core up to 40.0.0075 size round, cooper conductor and plug top 3 pin 5 to 15 Amps and reassembling testing complete all as specified and directed by Engineer-in-Charge |
80 | All as per item No 61 here in before but for 4 KVA to 5 KVA |
81 | S&F in repair / replacement of Voltage stabilizer for automatic operation single phase naturally air cooled indoor type and designed for input variation between 90 V to 270/300 volt with output voltage stabilized at 230 v with accuracy of+ 2.5 % and of cap 2 KVA having digital display to show input and output voltage Complete all as specified and as directed by Engr-in-Charge. |
82 | S&F in repair / replacement of Voltage stabilizer for automatic operation single phase naturally air cooled indoor type and designed for input variation between 90 V to 270/300 volt with output voltage stabilized at 230 v with accuracy of+ 2.5 % and of cap 4 KVA having digital display to show input and output voltage Complete all as specified and as directed by Engr-in-Charge. |
83 | S&F in repair / replacement of Voltage stabilizer for automatic operation single phase naturally air cooled indoor type and designed for input variation between 90 V to 270/300 volt with output voltage stabilized at 230 v with accuracy of+ 2.5 % and of cap 5 KVA having digital display to show input and output voltage |
84 | S&F in replacement push cock/ bib cock and stop cock unserviceable/damage push cock with new push cock, chromium plated, for 15 mm bore pipe internal/external thread, suitable for water cooler of any type and any capacity, complete al as specified and as directed by Engineer-In-Charge. |
85 | Taking out old unserviceable gate valve and S&F new 15 /20 mm dia bore gun metal gate valve conforming to IS with iron wheel head screwed both ends for iron pipe all as specified and directed. |
86 | S&Fin replacement GI pipe Medium grade galvanized of15 mm dia bore size in any lengths laid in trenchs or laid on floors or fixed with walls with all fittings in such as tees, bend, elbows, sockets, reducer , connectors, back nuts, diminishing pieces, caps, plugs, nipples and union complete incl taking down old rusted/unserviceable pipe all as specified and directed. |
87 | M&L in replacement of old unserviceable/damage ball valve with new ball brass valves, high pressure, with polythene float and flynut, screwed for iron pioe or brass ferrule and fixed for 15mm bore pipe, complete all as specified and as directed by Engineer-In-Charge. |
88 | Fabricated from Mild steelangle sections in replacementincluding nuts, bolts, washers, welding, bending cold or hot,drilling holes for bolts, in any shape or size as indicated or directed and inclusive of one primer coat, one under coat and one finishing coat of paint all as specified & directed. |
89 | Taking down geysers of any make & size from existing position of any height for repair, mainteance and refixing the same after neccesary repair complete all as directed. Notes (i) The defective parts to be replaced shall be measured and paid separately under relevant item of Sch . (ii)Cost of minor items i.e. Screws, nut & bolts etc shall be deemed to be included in the above item. |
90 | S&F in replacement heavy duty stainless steel connection pipe 15 mm bore size with PTMT nuts,rubber washers etc complete of length 450 mm long complete all as specified. |
91 | S&F in replacement stainless steel connection pipe connection 15 mm bore size with PTMT nuts,rubber washers etc complete of length 600 mm long complete all as specified. |
92 | S&F in replacement geyser element 2.0 KW, ISI marked with gasket, nuts, bolts suitable for the existingtriangular/round shape/make of the geyser under repair complete all as specified. |
93 | S&F in replacement geyser element 1.5 KW, ISI marked with gasket, nuts, bolts suitable for the existingtriangular/round shape/make of the geyser under repair complete all as specified. |
94 | S&F in replacement thermostat (ISI marked) suitable for existing make of the geyser under repair of cap 50/25 Ltrs complete all as specified. |
95 | S&F in replacement geyser safety valve (pressure release valve) for the exsiting make & capacity of geyser complete all as specified. |
96 | M&L for painting of geysers of any cap 25/50 Ltr with 2 coats of synthetic enamelled paint after scraping the existing old painted surface complete all as directed. |
97 | S&F in replacement shyphon assembly suitable for 50 ltr geysers of any make, any type complete all as specified and as directed by Engr -in-Charge. |
98 | S&F in replacement shyphon assembly suitable for 25 ltr geysers of any make, any type complete all as specified and as directed by Engr -in-Charge. |
99 | S&F in replacement inner tank made up of stainless steel conforming to IS suitable for 25 /35 ltr gyser vertical type including rubber gasket complete all as specified and directed. |
100 | S&F in replacement inner tank made up of stainless steel conforming to IS suitable for 50 ltr gyser vertical type including rubber gasket complete all as specified and directed. |
101 | S&F in replacement outer body made up of steel duly painted including base cover and indicator assembly suitable for 50 ltr gyser complete all as specified and directed. |
102 | S&F in replacement outer body made up of steel duly painted including base cover and indicator assembly suitable for 25 ltr gyser complete all as specified and directed. |
103 | S&F in replacement 3 Core PVC insulated PVC sheathed flexible copper wire multistrandedof size 2.5 sqmmcomplete all as specified and directed. |
104 | S&F in replacement indicator lamp any type/size 230 Volts complete all as specified and as directed. |
105 | S&F in replacement of brass non-return valve 15mm dia horizontal/verticle type ISI marked complete all as specified and as directed. |
106 | S&Fing in replacement of metal clad plug top 20 Amps complete,all as specified and directed. |
107 | S&Fing in replacement of metal clad socket 20 Amps complete,all as specified and directed. |
108 | S&Fing in replacement ofmetal clad socket and plug top complete with sheet metal enclosure complete,all as specified and directed |
109 | Material and labour for repair/servicing of water purifier , RO system , UF stabilized TDS controller of kent Elite MRO model through authorized service representative and replace the defective components and RO made functional, |
110 | S&F in replacement membrane suitable for RO kent, |
111 | S&F in replacement candle for sedimentation filter |
112 | S&Fin replacement candle for pre/ post carbon filter |
113 | S&F in replacement PVC connector for RO complete all as specifed and as directed. |
114 | S&F in replacement booster pump for RO complete all as specified and as directed |
115 | S&F in replacement for TDS controller of RO complete all as specfed and as directed. |
116 | Material and labor for replacement of unsv split AC inner unit body, unsv AC junction box, unsv voltage relay , unsv blower fan and motor,burnt swing motor, unsv PCB and Evaporator and replacement of all filter complete make the AC serviceable all as specified and as directed. |
117 | Repair to hot water storage tank of solar water heating system including detecting theleakage, cleaning of inner tank, bracing to leakage portion testing for leakageetc for any type, capacity of solar water heating hot water tank including removing, diamantling, assembling refixing and making water and electric connections complete,all as specified and directed. |
118 | S&F in replacement of heating elements for solar water heating system5 KW with rubber gasket for any type of geyser |
119 | S&F inreplacement of solar water steel tank cap 500 to 750 ltrs complete all as specified and directed. |
120 | S&F inreplacement of solar water steel tank cap 300 to 400 ltrs complete all as specified and directed. |
121 | S&F inreplacement of Syntex tank cap 1000 ltrs complete all as specified and directed. |
122 | S&F inreplacement of Syntex tank cap 500 ltrs complete all as specified and directed. |
123 | S&F inreplacement of GI Pipe medium grade with insulation dia 20mm complete all as specified and directed. |
124 | S&F inreplacement of GI Pipe medium grade dia 20mm complete all as specified and directed. |
125 | S&F inreplacement thermostat forSolar water heater, AC, SP 220 volts including making necessary connection, ISI marked, complete all as specified and as directed. |
126 | S&F inreplacement of temparature gauge for water heating systemISI marked, complete all as specified and as directed. |
127 | Material and labour in replacement of solar glass panel complete all as specified and directed including collant quiet, absorbing plates , flow tube , insulation coolant outlet certificate for transmissibly will be provided from approved company complete all a specified and directed. |
128 | S&F in replacement modular single phase motor starter , 250VAC, 25 Amp,2 module, panel mounting type as per existing make complete all as specifed and as directed. |
129 | Material and Labour for replacement of unsv Split AC 1.5 Ton outdoor unit , unsv compressor, unsv fan motor with blade and unsv rusted outer body, and capacitor, unsv condenser replace all the unsv part and make the outdoor unit to serviceable condition complete all as specified and as directed. |
130 | M&L for replacement of geyser assembly including heating element , relay , thermostat etc completesuitable for 25 ltr cap geysers as per existing make Complete all as specified and as directed by Engr-in-Charge. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail