| 1 | Earthworkexcavationinallclassofsoilsexcepthardrocksrequiringblastingsuchashardstiftclaycottonhardearthshalesmurramsgravelstoneyearthandearthmixedwithsmallsize withinitialleadandliftincludingallincidentialchargessuchasremovingboulderssharing,strutting,wateringbailingoutwateritnecessaryincludingalllabourchargesetc.,Completeforfoundation. |
| 2 | Supply delivery and filling of River sand in Layer of not more than 15cm thick including watering with all layers and consolidation complying with standard specification including cost and conveyance of sand at site and all labour charges and all other incidential charges etc., complete as per Standard Specification |
| 3 | Cement Concrete of mix 1 : 4 : 8 (One Cement four M sand eight aggregates) using 40mm gauge hard broken including cost conveyance of all materials to site including formwork and centering labour charges, transporting and placing in position including shoring, strutting, forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification. |
| 4 | Supplying ,errecting and CenteringforSideandSoffiotsincludingnecessarysupports for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90x60cm & 10 gauge stiffened, welded with steel angle of size 25x25x3mm for boarding laid over silver oak joists (Country wood) of size 10x6.5cm spaced @ about 90cm c/c and supported by casurina props of 10 -13cm dia.spaced @ 75cm c/c etc., complete complying with standard specifications for Side wall etc., Complete.Mat and Kerb wall |
| 5 | Column |
| 6 | Brickworkincementmortor1 : 5(One Cement and five Sand)usingbest quality of countrybricksof size 83/4x41/4x23/4 includingall costof materialsand Labour Charges including Curing charges etc., Complete as per standard specification. |
| 7 | PlasteringinC.M. 1 : 5 (one cement, five sand) to12 mmthickincludingallcostandconveyanceofallmaterials tositeincludingcostofcementwhichwillbepurcharedlocallybythecontractor and conveyanceofthesametotheactualworksiteandcostformworkincludingwatering curingandallleadsofgoodpotablewaterandallother. |
| 8 | Rubberised Interlocking Paver Block M40 grade providing and laying of 63 mm thick heigh strength type confiriming IS 15658 - 2006 of Rubberised Interlocking Paver Blockin required size of mininmum compressive strength of 40N/mm2 in uniform shape of approved make to be laid in flumying bore pattern with approved nin - sticking surface in the top and the rate including levelling the base Stone dustcushion 100mm thick laying out the pavement cut the pieus to fit edge, vibrating pavers, sweeping transporting leading unloading as per standard specification. |
| 9 | R.C.C.1 : 11/2 : 3 (One Cement one point five sand three aggregates) using 20mm gauge hard Granite broken stone jellyincluding cost curing, etc., complete as per standard specification and as directed by Engineer incharge. Below Ground Level |
| 10 | Above Ground Level |
| 11 | Supplying and Fabrication of Steel and placing in position MS / Ribbed tor steel grills for RCC works as per design given including cost of steel and GI binding wire in Floors etc., Complete complying with standard specification in force per Kilogram. |
| 12 | P.C.C.1 : 3 : 6 (One Cement three sand six aggregates) using 20mm gauge hard Granite broken stone jellyincluding cost curing, etc., complete as per standard specification and as directed by Engineer incharge. |
| 13 | Supplying and Painting thewalls with TwoCoatsCement Paint over one coat of cement primer as instructed by the departmrntal officers includingPreparation of surface curing, etc complete in all floorscomplying with standard specification. ( The Colour and shade of the paint shall be got approved by the departmental officers.) |
| 14 | SupplyingandFixingofSteel Gate and Steel Grill inusing Square rods includingallcostofmaterialandLabourincludingallincidentalchargesetc.,completecomplyingwithstandardSpecifications.Steel Gate |
| 15 | Steel Grill |
| 16 | Painting the new iron works such as steel doors, Windows,Ventilators windows bars,balustrades etc,in all floor withtwo coats of best approved first quality and colour of synthetic enamel paint of approved quality, colour and brand (to be approved by executive engineer before use on works ) over one the existing red oxide priming coat in all floors excluding cost of priming coat etc,complete complying with Standard Specification. ( The Make, Quality and colour of paint should be got approved bythe engineer in charge before use on works )( TNSS NO or NBC No 61 V VI (54) 3) |
| 17 | Supplying and filling of red soil for lawn area for plants including cost and conveyance of allmaterials to site including labour charge for all complete as per standard specification. |
| 18 | Design supply and erection of standared swing with two moulded grip seats as per the following specification. The unit is a pair swing with one frame. The unit is mainly made of good quality galvanized iron tubings of class \"A\" section. The beam is 2.4m long made of 50mm nominal bore tubes (59mm00). provided with four numbers of ball bearing assembly units each housing two deep groove ball bearings ,pre - lubricated and dust protected. The beam is provided with two corner heads made of cast iron which is supported at a height of approximately 2.1m to the footings. Two numbers of fibre glass seats,steel reinforced with four numbers of chains each are suspended form the ball bearing assembly units. The footings are in four in number made of 32mm nominal bore tubes (40mm OD ) each pair inclined to beam at an angle of about 15 degrees between two members of the pair of footings. This gives effective sturdity for lateral movement also. |
| 19 | Design supply and erection of Stainless steel Slide as per the following specification. The unit is a made of good quality galvanized iron tubings of class. \"A\" section with stainless sheet. The unit is of 1.65m dia and 1.75m high from ground leval. A good quality ball bearing assembly is provided for smooth rotation of the wheel. The ball bearings are pre - lubricated and dust protected. The wheel easily rotates on the vertical axis freely with the use of ball bearings. The units footing is provided with adequate foundation extension and cross bars for grouting into the ground with cement concrete of standard mix. The unit is painted in multicolours with two coats of bright, good quality synthetic enamel paints over a coat protective red oxide primer under coat. |
| 20 | Supplying and fixing of see-saw four seater with standard specification including cost and conveyance of all other labour and material charges to site etc., complete complying with standard specifications. |
| 21 | Supplying and fixing of merry go round 6 seater with standard specification including cost and conveyance of all other labour and material charges to site etc., complete complying with standard specifications. |
| 22 | Supplying and planting of Mexican lawn in & australian dipling method etc., Complete with all laboour, lead and lift and as directed by the engineer-in charge.(All labour, materials, tools and plants etc., by contractor) |
| 23 | Excavation of soil for plants , refilling the pits and trench with red earth , sand and enriched farm yard manure application of basal fertilizer like super potash DAP gypsum Neem cake supplying and planting of following plants, Maintaining the plants for Areca palms |
| 24 | Specimen plants (ie, Ficus Sps) |
| 25 | Hedge plants |
| 26 | border plants |
| 27 | Supply and fixing of pole mounted junction box for street lighting for 3 phase/4 core high wattage HPSV/HPMV/MH based lighting system for industrial application and rate included for 2 \" 1.5 metre poleincluding excavation and concreting for pole and labo |