| 1 | Earthworkexcavationinallclassofsoilsexcepthardrocksrequiringblastingsuchashardstiftclaycottonhardearthshalesmurramsgravelstoneyearthandearthmixedwithsmallsize withinitialleadandliftincludingallincidentialchargessuchasremovingboulderssharing,strutting,wateringbailingoutwateritnecessaryincludingalllabourchargesetc.,Completeforfoundation. |
| 2 | Cement Concrete of mix 1 : 4 : 8 (One Cement four sand eight aggregates) using 40mm gauge hard broken including cost conveyance of all materials to site including formwork and centering labour charges, transporting and placing in position including shoring, strutting, forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification. |
| 3 | Supply delivery and filling of River sand in Layer of not more than 15cm thick including watering with all layers and consolidation complying with standard specification including cost and conveyance of sand at site and all labour charges and all other incidential charges etc., complete as per Standard Specification |
| 4 | Supplying and errecting centering to sides and soffits including supports and struttingfor drainage sides andculvert body wall sidesusing M.S Sheets of size90cm x 60cm and B.G 10stifenedwith welded mild steel angles of size 25mm x 25mm x 3mm for boardinglaid over( silver oak joists ) of size 10cm x 6.50cm spread at about 90cm including all labour charges and cost and conveyance of all materials to site etc. complete Complying with Standard Specification as per TNDSS No.30&86 (For Side Wall,Deck slab & Retainingwall) up to 1.00m Height |
| 5 | a) Grade Beam |
| 6 | b) Column |
| 7 | Plain Cement Concrete 1:3:6 Mix (one part cement, three part sand and six part of aggrigate) using 20mm ISShard broken granite metal including cost and conveyance of all materials to work site and all labour charges etc., for mixing laying , consolidating,levelling and curring etc., complete Complying with Standard Specification as per TNDSS No.30&86 |
| 8 | Supplying, fabricating and placing in position mild steel or deformed steel bars for all Reinforced Cement Concrete items of work including cost of steel, transporting, straightening, cutting, bending, cranking, binding etc., including cost of binding wire etc., complete as per standard specificaitons. |
| 9 | Reinforced cement concrete 1:1.5:3 mix (One cement One and half sand Three aggregate) using 20mm ISS gauge HBBG metal from the approved quarry including mixing, laying, consolidating, curing cost and conveyance of all materials to site and all labourcharges etc., complete as per standard specification |
| 10 | Brick work in cement mortar 1:5 mix using country bricks of size 8 3/4\" x 4 1/4\" x 2 3/4\" for foundation and basement including all labour charges etc.,complet as per standard specification |
| 11 | Plastering in cement mortar 1:5 mix (one Cement and five sand) 12 mm thicketc., complete as per standard specification. |
| 12 | Painting two coats with ready mixed plastic emulsion paint of 1st class quality and of approved color over a priming coat including through scraping clean removal of dirt etc., complete and including necessary plaster of paris putty wherever required |
| 13 | SupplyingandFixingofSteel Gate and Grill inusing Square rods includingallcostofmaterialandLabourincludingallincidentalchargesetc.,completecomplyingwithstandardSpecifications. |
| 14 | Painting two coats new iron work for doors, windows and ventilators using iron bars, window grills weld mesh screen in opt courtyard etc., with two coat synthetic enamel paint and approved quality and color including priming coat in all floors.The rate is inclusive of cost of all materials, labour brushes and scaffolding charges etc., complete complying with standard specifications. |
| 15 | Supplying and laying rabbrazedinterlock concrete paver blocks of approved make as per Vendor list,with M40 grade concrete blocks with minimum thickness of 80 mm and providing minimum 50 mm thick sand cushion below the pavers as sub base, sand filing between the pavers and compacting the same as per spcifications including all cost and conveyance of materials to worksite and including all labour charges andas per directions of departmental officers.ls and all other expenses etc., complete |
| 16 | Geological investigation charges preparation ofgeological survey report etc., complete |
| 17 | Drilling of 150mm Dia bore well in hard rack area in including labour charges for drilling and development charges for erection of caching pipe in over burden soils all cost and conveyance etc., complete |
| 18 | Drilling of 150mm Dia Bore wells in hard rock areas including transportation to the work site in hard rock areas and developing the bore wells |
| 19 | Supply and delivery of wet type 3.00 HP (50 lpm x 125200 m head) submersible pumpset with motor and confirming to IS 8034/89 and IS 9283/79 with ISI marking with D.O.L pannel board as per standard specification. The pump set should be supplied with 5Mflat submersible motor etc.,complete. complying with std. specifications. |
| 20 | Supply and Delivery of following specials with ISI making as per standard specifications (MEDIUM) |
| 21 | 150mm PVC Casing Pipe |
| 22 | 40mm upvc pipe |
| 23 | 4.00 Sq.mm 3 core copper cable |
| 24 | 150mm PVC End cap |
| 25 | 50mm PVC Pipe |
| 26 | 50mm PVC Elbow |
| 27 | 50mm PVC Tee |
| 28 | 50mmx20mm PVC Reducer |
| 29 | 50mm GM Gatevalve |
| 30 | Supply and delivery and fixing of 1000 Ltr capacity HDPE tankas per IS 12701 / 1996 including loading, unloading, transportation and labour charges for fixing of the GI pipes and specials for pipe connection works including cutting, threading and fixing charges etc. |
| 31 | construction ofSintex tank pedestal work including earthn work 1;4;8 pcc B W in cm 1;5plastering work with collour washing etc complete |
| 32 | construction of kisok box pillarwork including earthn work 1;4;8 pcc B W in cm 1;5plastering work with collour washing etc complete |
| 33 | Supply and run of 4 x6 sq.mm.(56Nos/0.3mm.Dia) PVC insulated single core unsheathed copper conductor cable of 1100 V on 7/20 G.I. bearer wire for service connection mains (SD 68) |
| 34 | Supply and Run of 4x4 sq.mm(84/0.3) PVC insulated Sc unsheathed Cu.Conductor of 1100V grade in 25mm dia G.I pipe (\"B\"class) suitable bend at both ends with necessary angle iron up right and end supports for mains.SD-73) |
| 35 | Supply and delivery of MS Kiosk of size 0.75m x 0.45m x 0.75m made up of MS angle of size 50mm x 50mmx 4mm alround covered with 16 gauge MS sheet and kiosk door made up of MS plates of size 25 mm x 3 mm including cutting, welding, grinding, locking arrangements etc., |
| 36 | Labour charges for the erection of submersible pumpset in borewell/openwell including fixing and jointing submersible cable withproper clamps upto the starter to required depth and also fixing of riser pipes to the required depth valves erection clamps, pressure gauges upto the exterior wall of pump room and erection of panel board consisting of TPICN switches starter, voltmeter, Ammeter, three pilot (indicating) lamps capacitor single phasing preventor, water level guard and laying and jointing the cables and twin earthing as per IE rules etc., complete and testing the pumpset and trail run for 10 days. |
| 37 | Korean Gross, The areas to be developed with the green carpet of Korean grass would be leveled with a mild uniform slope to void water stagnation problem and toe provide clear view of the landscape from any point of the premise, after Leveling the prepared soil bed is raised to the necessary height and slope using rich soil mixture of red soil FYM ( farm Yard Manure’s) Micro nutrients, Fungicides would be spread Micro nutrients, Fungicides would be spread over the leveled ground for an height of 0.15mts. Then the ground would be watered for a week to enable the weeks in the prepared soil bed to germinate. The germinated weeds soil be removed completely. Then the developed lawn Tufts is spread over the prepared area form the lawn within 1 week (turfs are developed in our nursery in controlled chamber and treated to give resistance against the Fungal activities). Then the lawn has to be watered regularly so as to maintain its lush every day for a period of I month after planting / Turfing, But at the same time stagnation of water should be avoided as well as the weeding also be done to maintain the weds free Lawn. Hence the Grass would cover the ground so as form a etc., Complete. As per Std Specifications. |
| 38 | Tree Planting with following items including cost and conveyance to site and all labour charges etc., complete. |
| 39 | A) Duja Tree |
| 40 | B) X-Mas Tree |
| 41 | C) Dulip Tree |
| 42 | D) Musanda |
| 43 | B) Merri-go-roundSupply fabrication and erection of Merri-go-round of 5\" dia.with a base of 2\" dia. GI pipe and top set with ball bearing with 4 leafs of 4 seat with wooden planks and a hand grip of 20 mm dia. GI pipe with painting etc., complete. |
| 44 | See-sawSupply fabrication and erection of siesa by using 2\" dia. GI pipe which bend astype with pair to a height of 2\" and jointed at top with same dia. of pipe. At middle of jointing pipe another pipe fixed perpendicularly with rotation type as shaft method. Both the free ends the wooden planks fittedas seat and a hand grip of 20 mm dia. GI pipe including fixing and painting etc., complete. |
| 45 | SwingSupply fabrication and erection of swing which consists of one side ladder and one side of M.S.sheet of 16 Gauge and bend as smooth curve. The ladder shouldbe a clear width of45 cm and the steps welded at an intervals of 15 cm with side hand rails. Both ladder and curved plate fixed in opposite direction to a centre support of 2\" dia. GI pipeincluding fixing and painting etc., complete. |
| 46 | SlideSupply fabrication and erection of slide which consists of one side ladder and one side of M.S.sheet of 16 Gauge and bend as smooth curve. The ladder shouldbe a clear width of45 cm and the steps welded at an intervals of 15 cm with side hand rails. Both ladder and curved plate fixed in opposite direction to a centre support of 2\" dia. GI pipeincluding fixing and painting etc., complete. |
| 47 | Granite stone (3 seater) |
| 48 | Lighting (15mt mt interval) |