|
| 1 | Repair/renew of 60Ton derrick crane barge control panel - Qty 1 AU |
| 2 | Repair of Main Engine Control & Monitoring Console (02Nos) |
| 3 | Repair of Ballast Pump & Fire pump Control1 no. |
| 4 | Repair of Derrick Crane Control Console. 1 no. |
| 5 | Repair of Propulsion Control. - 1no. |
| 6 | Repair of Crane Boom Angle Indicator along with dynamometer.- 1no. |
| 7 | Repair/replace Crane Lift Load Indicator along with 3 nos. load cell |
| 8 | Repair of Safety Device control & Alarm Cut off |
| 9 | Complete crane trials with weight load testing |
| 10 | All crane pulley to be inspected and greased |
| 11 | Repair/renew of Crane Winch-Qty 1 AU |
| 12 | Renew 02Nos Hydraulic Motors with block |
| 13 | 03 Nos Winch Drum Bearing to be Inspected & Lubricated, Gear Oil to be renewed |
| 14 | Solenoid Valve of 3 nos. winches to be replaced |
| 15 | Replace Solenoid Valve of 3 nos.winch drum brake |
| 16 | Replace Solenoid Valve of 1 no winch for slewing operation |
| 17 | Replace Solenoid Valve of 1 no winch for slewing brake operation |
| 18 | Replace Control Block & Manifold block for 3 nos. winches |
| 19 | Replace Limit Switches on 3 nos. Winches |
| 20 | Replace Limit Switches onWinch for swing operation (2 nos.) |
| 21 | Unwound and recoil properly the Main Hook Rope for correct operation |
| 22 | Inspection and recertification ofall crane winches wire rope |
| 23 | Replace miscellaneous pipes & Pipe fittings (approx. 40 nos..) |
| 24 | Replace miscellaneous Hoses & Hydraulic Hoses |
| 25 | Replace all removed fasteners |
| 26 | Repair/renew of Crane Hydraulic oil Tank-Qty 1 AU |
| 27 | Replace Solenoid valve of Main hydraulic pumps- 06 Nos |
| 28 | Replacerelief valve |
| 29 | Replace hoses - 10 nos. |
| 30 | Replace Butterfly valve ( 100mm), bellow and cut off solenoid valve |
| 31 | Replace miscellaneous pipes & Pipe fittings - 20 Nos. |
| 32 | Replace all removed fasteners |
| 33 | Repair/renew of Hydraulic Pump, Gear box-Qty 1 AU |
| 34 | Replace 2 Nos. main hydraulic pumps |
| 35 | Replace 2 Nos. of Twin disc gear box (pump side only) |
| 36 | Checked & repaired engine speed electronic control panel |
| 37 | Replace rubber bellows & hydraulic bellows- 4 nos. |
| 38 | Replace set of hydraulic hoses |
| 39 | replace miscellaneous pipes & Pipe fittings (approx. 10 Nos) |
| 40 | Replace all the removed fasteners |
| 41 | Replace hydraulic oil of complete system |
| 42 | Repair/renew of 2 nos. Main Engine |
| 43 | Carry out 3000 hrs routine of 2 nos. main engine |
| 44 | Replace engines oil of 2 nos. main engine |
| 45 | Replace oil filter & air filter of 2 nos. main engines |
| 46 | Carry out tappet setting of 2 nos. main engine. |
| 47 | Repair/renew of 2 nos. Anchor Winch |
| 48 | Overhaul 2 nos. Anchor winch |
| 49 | Replace set of hydraulic hoses |
| 50 | Replace 4 nos. Control valve Block |
| 51 | Overhaul 2 nos. hydraulic pumps |
| 52 | Inspect and overhaul winch gear box |
| 53 | Check brake liner |
| 54 | Replace all the removed fasteners |
| 55 | Repair/renew of 2 nos. Mooring Winch |
| 56 | Overhaul 2 nos. Mooring winch |
| 57 | Replace complete set of hydraulic hoses |
| 58 | Replace 4 nos. Control valve Block |
| 59 | Overhaul 2 nos. hydraulic pumps |
| 60 | Inspect and overhaul the winch gear box |
| 61 | Check brake liner |
| 62 | Replace all the removed fasteners |
| 63 | Repair/renew of Main Engine Box Cooler-Qty 1 AU |
| 64 | Remove the old box cooler-1 no. |
| 65 | Replace the new box cooler-1 no. |
| 66 | Replace 4 inch gate valves- 8 nos. |
| 67 | Modification of pipe line as per new box cooler |
| 68 | Repair/renew of Fire Pump & Ballast pump-Qty 1 AU |
| 69 | Replace 4 nos. solenoid valves |
| 70 | Replace 1 no. relief valve |
| 71 | Replace hydraulic hoses (approx. 20 nos.) |
| 72 | Replace all the removed fasteners |
| 73 | Replace 2 nos. rubber bellows |
| 74 | Repair/renew of Generator-Qty 1 AU |
| 75 | replace and make operational the control panel of generator |
| 76 | Repair/renew of Main Engine-Qty 1 AU |
| 77 | Increse the height of 2 nos. engines water expansion tank at required level |
| 78 | Underwater Hull Repair and Steel Work-Qty 1 AU |
| 79 | Chipping and painting of all tanks (approx. internal area- 2500 sq mtrs.) |
| 80 | Carry out inspection, blasting and painting of underwater hull (approx. external area-1 500 sqm.) |
| 81 | Renewal of underwater hull steel (approx.- 2 tons) |
| 82 | Replace 3 nos. fairleads |
| 83 | Fabricate guard rails and stanchion (approx. 40 mtrs.) |
| 84 | Roller Fairlead to be manufactured new and fabricated on board |
| 85 | Main Propulsion unit-Qty 1 AU |
| 86 | Inspect 2 nos. propulsion units, clean propellors and replace suitable gear oil |
| 87 | Steering System-Qty 1 AU |
| 88 | Overhaul 2 nos. steering system control console,clean steering gear oil tanks, replace the oil filters and chage oil |
| 89 | Crane Boom/Jib-Qty 1 AU |
| 90 | Clean & paint crane boom/jib (approv area- 1000 sqm.) |