Annual Rate Of Hotmix Material For Various Roads Under (R&B) Division, Navsari (Providing Bsg, Bm, Sdbc, Mss, Asphalt Painting)-Gujarat

Road And Building Department has published Annual Rate Of Hotmix Material For Various Roads Under (R&B) Division, Navsari (Providing Bsg, Bm, Sdbc, Mss, Asphalt Painting). Submission Date for this Tender is 13-09-2021. Coats and Jackets Tenders in Gujarat. Bidders can get complete Tender details and download the document.




Tender Notice

28986124
Annual Rate Of Hotmix Material For Various Roads Under (R&B) Division, Navsari (Providing Bsg, Bm, Sdbc, Mss, Asphalt Painting)
Tender
Indian
Gujarat
13-09-2021

Tender Details

Annual Rate Of Hotmix Material For Various Roads Under (R&B) Division, Navsari (Providing Bsg, Bm, Sdbc, Mss, Asphalt Painting) 26. Providing And Laying 25 Mm Thick Compacted Semi Dense Bituminous Concrete Using Stone Chips As Per Mort&H Gradation & Vg-30 Grade Asphalt For Mixing @ 5.0% By Weight Of Total Mix For Binder Including Heating The Aggregate And Asphalt By Batch Mix Plant And Spreading The Same By Paver Finisher And Consolidation With Vibratory Roller Including Providing All Materials, Equipments, Tools And Plants, Oil, Kerosene, Fire Wood, Labour Charges Etc. Complete Excluding The Cost Of Asphalt Supply By Depp. (A) Lead Up To 25 Km 27. Providing And Laying 25 Mm Thick Compacted Semi Dense Bituminous Concrete Using Stone Chips As Per Mort&H Gradation & Vg-30 Grade Asphalt For Mixing @ 5.0% By Weight Of Total Mix For Binder Including Heating The Aggregate And Asphalt By Batch Mix Plant And Spreading The Same By Paver Finisher And Consolidation With Vibratory Roller Including Providing All Materials, Equipments, Tools And Plants, Oil, Kerosene, Fire Wood, Labour Charges Etc. Complete Excluding The Cost Of Asphalt Supply By Depp.(B) Lead Up To 25 To 50 Km 28. Providing And Laying 25 Mm Thick Compacted Semi Dense Bituminous Concrete Using Stone Chips As Per Mort&H Gradation & Vg-30 Grade Asphalt For Mixing @ 5.0% By Weight Of Total Mix For Binder Including Heating The Aggregate And Asphalt By Batch Mix Plant And Spreading The Same By Manual Means And Consolidation With Vibratory Roller Including Providing All Materials, Equipments, Tools And Plants, Oil, Kerosene, Fire Wood, Labour Charges Etc. Complete Excluding The Cost Of Asphalt Supply By Depp. (A) Lead Up To 25 Km 29. Providing And Laying 25 Mm Thick Compacted Semi Dense Bituminous Concrete Using Stone Chips As Per Mort&H Gradation & Vg-30 Grade Asphalt For Mixing @ 5.0% By Weight Of Total Mix For Binder Including Heating The Aggregate And Asphalt By Batch Mix Plant And Spreading The Same By Manual Means And Consolidation With Vibratory Roller Including Providing All Materials, Equipments, Tools And Plants, Oil, Kerosene, Fire Wood, Labour Charges Etc. Complete Excluding The Cost Of Asphalt Supply By Depp. (B) Lead Up To 25 To 50 Km 30. Providing And Laying 25 Mm Thick Compacted Semi Dense Bituminous Concrete Using Stone Chips As Per Mort&H Gradation & Vg-30 Grade Asphalt For Mixing @ 5.0% By Weight Of Total Mix For Binder Including Tack Coat Of Vg - 30 2.5 Kg. / 10 Sq.M. On Existing B.T. Surface For Binder Including Heating The Aggregate And Asphalt By Drum Mix Plant And Spreading The Same By Paver Finisher And Consolidation With Vibratory Roller Including Providing All Materials, Equipments, Tools And Plants, Oil, Kerosene, Fire Wood, Labour Charges Etc. Complete Excluding The Cost Of Asphalt Supply By Depp. (A) Lead Up To 25 Km 31. Providing And Laying 25 Mm Thick Compacted Semi Dense Bituminous Concrete Using Stone Chips As Per Mort&H Gradation & Vg-30 Grade Asphalt For Mixing @ 5.0% By Weight Of Total Mix For Binder Including Tack Coat Of Vg - 30 2.5 Kg. / 10 Sq.M. On Existing B.T. Surface For Binder Including Heating The Aggregate And Asphalt By Drum Mix Plant And Spreading The Same By Paver Finisher And Consolidation With Vibratory Roller Including Providing All Materials, Equipments, Tools And Plants, Oil, Kerosene, Fire Wood, Labour Charges Etc. Complete Excluding The Cost Of Asphalt Supply By Depp. (B) Lead Up To 25 To 50 Km 32. Providing And Laying 25 Mm Thick Compacted Semi Dense Bituminous Concrete Using Stone Chips As Per Mort&H Gradation & Vg-30 Grade Asphalt For Mixing @ 5.0% By Weight Of Total Mix For Binder Including Tack Coat Of Vg - 30 2.5 Kg. / 10 Sq.M. On Existing B.T. Surface For Binder Including Heating The Aggregate And Asphalt By Drum Mix Plant And Spreading The Same By Manual Means And Consolidation With Vibratory Roller Including Providing All Materials, Equipments, Tools And Plants, Oil, Kerosene, Fire Wood, Labour Charges Etc. Complete Excluding The Cost Of Asphalt Supply By Depp.(A) Lead Up To 25 Km 33. Providing And Laying 25 Mm Thick Compacted Semi Dense Bituminous Concrete Using Stone Chips As Per Mort&H Gradation & Vg-30 Grade Asphalt For Mixing @ 5.0% By Weight Of Total Mix For Binder Including Tack Coat Of Vg - 30 2.5 Kg. / 10 Sq.M. On Existing B.T. Surface For Binder Including Heating The Aggregate And Asphalt By Drum Mix Plant And Spreading The Same By Manual Means And Consolidation With Vibratory Roller Including Providing All Materials, Equipments, Tools And Plants, Oil, Kerosene, Fire Wood, Labour Charges Etc. Complete Excluding The Cost Of Asphalt Supply By Depp.(B) Lead Up To 25 To 50 Km 34. Providing And Laying 25 Mm Thick Compacted Semi Dense Bituminous Concrete Using Stone Chips As Per Mort&H Gradation & Asphalt Grade 60/70 (Vg-30) Grade Asphalt For Mixing @ 5.0 % By Weight Of Total Mix Including Heating The Aggregate And Asphalt By Drum Mix Plant And Spreading The Same By Paver Finisher And Consolidation With Vibratory Roller Including Providing All Materials, Equipments, Tools And Plants, Oil, Kerosene, Fire Wood, Labour Charges Etc. Complete (A) Lead Up To 25 Km 35. Providing And Laying 25 Mm Thick Compacted Semi Dense Bituminous Concrete Using Stone Chips As Per Mort&H Gradation & Asphalt Grade 60/70 (Vg - 30) Grade Asphalt For Mixing @ 5.0 % By Weight Of Total Mix Including Heating The Aggregate And Asphalt By Drum Mix Plant And Spreading The Same By Paver Finisher And Consolidation With Vibratory Roller Including Providing All Materials, Equipments, Tools And Plants, Oil, Kerosene, Fire Wood, Labour Charges Etc. Complete (B) Lead Up To 25 To 50 Km 36. Providing And Laying 25 Mm Thick Compacted Semi Dense Bituminous Concrete Using Stone Chips As Per Mort&H Gradation & Asphalt Grade 60/70 (Vg - 30) Grade Asphalt For Mixing @ 5.0 % By Weight Of Total Mix Including Heating The Aggregate And Asphalt By Drum Mix Plant And Spreading The Same By Manual Means And Consolidation With Vibratory Roller Including Providing All Materials, Equipments, Tools And Plants, Oil, Kerosene, Fire Wood, Labour Charges Etc. Complete (A) Lead Up To 25 Km 37. Providing And Laying 25 Mm Thick Compacted Semi Dense Bituminous Concrete Using Stone Chips As Per Mort&H Gradation & Asphalt Grade 60/70 (Vg - 30) Grade Asphalt For Mixing @ 5.0 % By Weight Of Total Mix Including Heating The Aggregate And Asphalt By Drum Mix Plant And Spreading The Same By Manual Means And Consolidation With Vibratory Roller Including Providing All Materials, Equipments, Tools And Plants, Oil, Kerosene, Fire Wood, Labour Charges Etc. Complete (B) Lead Up To 25 To 50 Km 38. Providing And Laying 25 Mm Thick Compacted Semi Dense Bituminous Concrete Using Stone Chips As Per Mort&H Gradation & Vg-30 Grade Asphalt For Mixing @ 5.0% By Weight Of Total Mix Including Tack Coat Of Vg - 30 2.5 Kg. / 10 Sq.M. On Existing B.T. Surface For Binder Including Heating The Aggregate And Asphalt By Drum Mix Plant And Spreading The Same By Paver Finisher And Consolidation With Vibratory Roller Including Providing All Materials, Equipments, Tools And Plants, Oil, Kerosene, Fire Wood, Labour Charges Etc. Complete (A) Lead Up To 25 Km 39. Providing And Laying 25 Mm Thick Compacted Semi Dense Bituminous Concrete Using Stone Chips As Per Mort&H Gradation & Vg-30 Grade Asphalt For Mixing @ 5.0% By Weight Of Total Mix For Binder Including Tack Coat Of Vg - 30 2.5 Kg. / 10 Sq.M. On Existing B.T. Surface For Binder Including Heating The Aggregate And Asphalt By Drum Mix Plant And Spreading The Same By Paver Finisher And Consolidation With Vibratory Roller Including Providing All Materials, Equipments, Tools And Plants, Oil, Kerosene, Fire Wood, Labour Charges Etc. Complete (B) Lead Up To 25 To 50 Km 40. Providing And Laying 25 Mm Thick Compacted Semi Dense Bituminous Concrete Using Stone Chips As Per Mort&H Gradation & Vg-30 Grade Asphalt For Mixing @ 5.0% By Weight Of Total Mix Including Tack Coat Of Vg - 30 2.5 Kg. / 10 Sq.M. On Existing B.T. Surface For Binder Including Heating The Aggregate And Asphalt By Drum Mix Plant And Spreading The Same By Manual Means And Consolidation With Vibratory Roller Including Providing All Materials, Equipments, Tools And Plants, Oil, Kerosene, Fire Wood, Labour Charges Etc. Complete (A) Lead Up To 25 Km 41. Providing And Laying 25 Mm Thick Compacted Semi Dense Bituminous Concrete Using Stone Chips As Per Mort&H Gradation & Vg-30 Grade Asphalt For Mixing @ 5.0% By Weight Of Total Mix For Binder Including Tack Coat Of Vg - 30 2.5 Kg. / 10 Sq.M. On Existing B.T. Surface For Binder Including Heating The Aggregate And Asphalt By Drum Mix Plant And Spreading The Same By Manual Means And Consolidation With Vibratory Roller Including Providing All Materials, Equipments, Tools And Plants, Oil, Kerosene, Fire Wood, Labour Charges Etc. Complete (B) Lead Up To 25 To 50 Km 42. Providing And Laying Bituminous Base Course 37.50 Mm Thick Compacted In Single Layer With Tack Coat Of Asphalt Vg-30 Grade At The Rate Of 2.5 Kg/10 Sqmt And Using B.T. Chips Of Required Gradation And Asphlat Vg-30 Grade For Mixing @ 1.99 % By Weight Of Total Mix Including Heating The Aggregate And Asphalt By Drum Mix Paint And Spreading The Same By Paver Finisher And Consolidation With Vibrator Roller Including Providing All Materials, Equipements, Tools, And Plants Oil, Kerosene, Firewood, Labour Charges Etc. Comp. Excluding The Cost Of Asphalt Supply By Deptt. @ Hajira Depo. & Carting The Same By The Agency. (A) Lead Up To 25 Km 43. Providing And Laying Bituminous Base Course 37.50 Mm Thick Compacted In Single Layer With Tack Coat Of Asphalt Vg-30 Grade At The Rate Of 2.5 Kg/10 Sqmt And Using B.T. Chips Of Required Gradation And Asphlat Vg-30 Grade For Mixing @ 1.99 % By Weight Of Total Mix Including Heating The Aggregate And Asphalt By Drum Mix Paint And Spreading The Same By Paver Finisher And Consolidation With Vibrator Roller Including Providing All Materials, Equipements, Tools, And Plants Oil, Kerosene, Firewood, Labour Charges Etc. Comp. Excluding The Cost Of Asphalt Supply By Deptt. @ Hajira Depo. & Carting The Same By The Agency. (B) Lead Up To 25 To 50 Km 44. Providing And Laying Bituminous Grout 37.50 Mm Thick Compacted In Single Layer With Tack Coat Of Asphalt Vg-30 Grade At The Rate Of 2.5 Kg/10 Sqmt And Using B.T. Chips Of Required Gradation And Asphlat Vg-30 Grade For Mixing @ 1.99 % By Weight Of Total Mix Including Heating The Aggregate And Asphalt By Drum Mix Paint And Spreading The Same By Manual Means And Consolidation With Vibrator Roller Including Providing All Materials, Equipements, Tools, And Plants Oil, Kerosene, Firewood, Labour Charges Etc. Comp. Excluding The Cost Of Asphalt Supply By Deptt. @ Hajira Depo. & Carting. (A) Lead Up To 25 Km 45. Providing And Laying Bituminous Grout 37.50 Mm Thick Compacted In Single Layer With Tack Coat Of Asphalt Vg-30 Grade At The Rate Of 2.5 Kg/10 Sqmt And Using B.T. Chips Of Required Gradation And Asphlat Vg-30 Grade For Mixing @ 1.99 % By Weight Of Total Mix Including Heating The Aggregate And Asphalt By Drum Mix Paint And Spreading The Same By Manual Means And Consolidation With Vibrator Roller Including Providing All Materials, Equipements, Tools, And Plants Oil, Kerosene, Firewood, Labour Charges Etc. Comp. Excluding The Cost Of Asphalt Supply By Deptt. @ Hajira Depo. & Carting. (B) Lead Up To 25 To 50 Km 46. Providing And Laying 37.5 Mm Thick Compacted B.M.With B.T. Aggregate As Per Mort&H Specification And Asphalt Grade 60/70 (Vg-30) For Tack Coat At 2.5 Kg./10Sq.Mt. With Mechanical Sprayer And Bitumen Grade 60/70 (Vg-30) For Mixing At The Rate 34.0Kg/M.T. I.E. 3.4 % Of Total Mix Including Heating The Aggregate And Asphalt By Drum Mix Plant And Spreading The Same By Censor Paver Finisher And Consolidation With Vibratory Roller Including Providing All Materials, Equipments, Tools And Plants, Oil, Kerosene, Fire Wood, Labour Charges Etc. Complete. Excluding The Cost Of Asphalt Supply By Deptt. @ Hajira Depo. & Carting The Same By The Agency. (A) Lead Up To 25 Km 47. Providing And Laying 37.5 Mm Thick Compacted B.M.With B.T. Aggregate As Per Mort&H Specification And Asphalt Grade 60/70 (Vg-30) For Tack Coat At 2.5 Kg./10Sq.Mt. With Mechanical Sprayer And Bitumen Grade 60/70 (Vg-30) For Mixing At The Rate 34.0Kg/M.T. I.E. 3.4 % Of Total Mix Including Heating The Aggregate And Asphalt By Drum Mix Plant And Spreading The Same By Censor Paver Finisher And Consolidation With Vibratory Roller Including Providing All Materials, Equipments, Tools And Plants, Oil, Kerosene, Fire Wood, Labour Charges Etc. Complete. Excluding The Cost Of Asphalt Supply By Deptt. @ Hajira Depo. & Carting The Same By The Agency. (B) Lead Up To 25 To 50 Km 48. Providing And Laying 37.5 Mm Thick Compacted B.M.With B.T. Aggregate As Per Mort&H Specification And Asphalt Grade 60/70 (Vg-30) For Tack Coat At 2.5 Kg./10Sq.Mt. With Mechanical Sprayer And Bitumen Grade 60/70 (Vg-30) For Mixing At The Rate 34.0Kg/M.T. I.E. 3.4 % Of Total Mix Including Heating The Aggregate And Asphalt By Drum Mix Plant And Spreading The Same By Manual Means And Consolidation With Vibratory Roller Including Providing All Materials, Equipments, Tools And Plants, Oil, Kerosene, Fire Wood, Labour Charges Etc. Complete. Excluding The Cost Of Asphalt Supply By Deptt. @ Hajira Depo. & Carting The Same By The Agency. (A) Lead Up To 25 Km 49. Providing And Laying 37.5 Mm Thick Compacted B.M.With B.T. Aggregate As Per Mort&H Specification And Asphalt Grade 60/70 (Vg-30) For Tack Coat At 2.5 Kg./10Sq.Mt. With Mechanical Sprayer And Bitumen Grade 60/70 (Vg-30) For Mixing At The Rate 34.0Kg/M.T. I.E. 3.4 % Of Total Mix Including Heating The Aggregate And Asphalt By Drum Mix Plant And Spreading The Same By Manual Means And Consolidation With Vibratory Roller Including Providing All Materials, Equipments, Tools And Plants, Oil, Kerosene, Fire Wood, Labour Charges Etc. Complete. Excluding The Cost Of Asphalt Supply By Deptt. @ Hajira Depo. & Carting The Same By The Agency. (B) Lead Up To 25 To 50 Km 50. Providing And Laying 37.5Mm Thick Compacted B.M.With B.T. Aggregate As Per Mort&H Specification And Asphalt Grade 60/70 (Vg-30) For Tack Coat At 2.5 Kg./10Sq.Mt. With Mechanical Sprayer And Bitumen Grade 60/70 (Vg-30) For Mixing At The Rate 34.0Kg/M.T. I.E. 3.4 % Of Total Mix Including Heating The Aggregate And Asphalt By Drum Mix Plant And Spreading The Same By Censor Paver Finisher And Consolidation With Vibratory Roller Including Providing All Materials, Equipments, Tools And Plants, Oil, Kerosene, Fire Wood, Labour Charges Etc. Complete. (A) Lead Up To 25 Km 51. Providing And Laying 37.5Mm Thick Compacted B.M.With B.T. Aggregate As Per Mort&H Specification And Asphalt Grade 60/70 (Vg-30) For Tack Coat At 2.5 Kg./10Sq.Mt. With Mechanical Sprayer And Bitumen Grade 60/70 (Vg-30) For Mixing At The Rate 34.0Kg/M.T. I.E. 3.4 % Of Total Mix Including Heating The Aggregate And Asphalt By Drum Mix Plant And Spreading The Same By Censor Paver Finisher And Consolidation With Vibratory Roller Including Providing All Materials, Equipments, Tools And Plants, Oil, Kerosene, Fire Wood, Labour Charges Etc. Complete. (B) Lead Up To 25 To 50 Km 52. Providing And Laying 37.5Mm Thick Compacted B.M.With B.T. Aggregate As Per Mort&H Specification And Asphalt Grade 60/70 (Vg-30) For Tack Coat At 2.5 Kg./10Sq.Mt. With Mechanical Sprayer And Bitumen Grade 60/70 (Vg-30) For Mixing At The Rate 34.0Kg/M.T. I.E. 3.4 % Of Total Mix Including Heating The Aggregate And Asphalt By Drum Mix Plant And Spreading The Same By Manual Means And Consolidation With Vibratory Roller Including Providing All Materials, Equipments, Tools And Plants, Oil, Kerosene, Fire Wood, Labour Charges Etc. Complete.(A) Lead Up To 25 Km 53. Providing And Laying 37.5Mm Thick Compacted B.M.With B.T. Aggregate As Per Mort&H Specification And Asphalt Grade 60/70 (Vg-30) For Tack Coat At 2.5 Kg./10Sq.Mt. With Mechanical Sprayer And Bitumen Grade 60/70 (Vg-30) For Mixing At The Rate 34.0Kg/M.T. I.E. 3.4 % Of Total Mix Including Heating The Aggregate And Asphalt By Drum Mix Plant And Spreading The Same By Manual Means And Consolidation With Vibratory Roller Including Providing All Materials, Equipments, Tools And Plants, Oil, Kerosene, Fire Wood, Labour Charges Etc. Complete.(B) Lead Up To 25 To 50 Km 54. Providing And Laying 20Mm Thick Compacted Mix Seal Coat By Using Stone Chips As Per Mort & H Gradation & Vg.-30 Grade Asphalt For Mixing @ 5.09% By Weight Of Total Mix Including Heating The Aggregate And Asphalt By Drum Mix Paint And Spreading The Same By Paver Finisher And Consolidation With Vibrator Roller Including Providing All Materials, Equipements, Tools, And Plants Oil, Kerosene, Firewood, Labour Charges Etc. Comp. Excluding The Cost Of Asphalt Supply By Deptt. @ Hajira Depo. & Carting The Same By The Agency. (A) Lead Up To 25 Km 55. Providing And Laying 20Mm Thick Compacted Mix Seal Coat By Using Stone Chips As Per Mort & H Gradation & Vg.-30 Grade Asphalt For Mixing @ 5.09% By Weight Of Total Mix Including Heating The Aggregate And Asphalt By Drum Mix Paint And Spreading The Same By Paver Finisher And Consolidation With Vibrator Roller Including Providing All Materials, Equipements, Tools, And Plants Oil, Kerosene, Firewood, Labour Charges Etc. Comp. Excluding The Cost Of Asphalt Supply By Deptt. @ Hajira Depo. & Carting The Same By The Agency. (B) Lead Up To 25 To 50 Km 56. Providing And Laying 20Mm Thick Compacted Mix Seal Coat By Using Stone Chips As Per Mort & H Gradation & Vg.-30 Grade Asphalt For Mixing @ 5.09% By Weight Of Total Mix Including Heating The Aggregate And Asphalt By Drum Mix Paint And Spreading The Same By Manual Means And Consolidation With Vibrator Roller Including Providing All Materials, Equipements, Tools, And Plants Oil, Kerosene, Firewood, Labour Charges Etc. Comp. Excluding The Cost Of Asphalt Supply By Deptt. @ Hajira Depo. & Carting The Same By The Agency. (A) Lead Up To 25 Km 57. Providing And Laying 20Mm Thick Compacted Mix Seal Coat By Using Stone Chips As Per Mort & H Gradation & Vg.-30 Grade Asphalt For Mixing @ 5.09% By Weight Of Total Mix Including Heating The Aggregate And Asphalt By Drum Mix Paint And Spreading The Same By Manual Means And Consolidation With Vibrator Roller Including Providing All Materials, Equipements, Tools, And Plants Oil, Kerosene, Firewood, Labour Charges Etc. Comp. Excluding The Cost Of Asphalt Supply By Deptt. @ Hajira Depo. & Carting The Same By The Agency. (B) Lead Up To 25 Km To 50 Km 58. Providing And Laying 20Mm Thick Compacted Mix Seal Coat By Using Stone Chips As Per Mort & H Gradation & Vg.-30 Grade Asphalt For Mixing @ 5.09% By Weight Of Total Mix Including Tack Coat Of Vg.- 30 2.5Kg./10 Sq.M. On Existing B.T. Surface For Binder Including Heating The Aggregate And Asphalt By Drum Mix Paint And Spreading The Same By Paver Finisher And Consolidation With Vibrator Roller Including Providing All Materials, Equipements, Tools, And Plants Oil, Kerosene,Firewood, Labour Charges Etc. Comp. Excluding The Cost Of Asphalt Supply By Deptt. @ Hajira Depo. & Carting The Same By The Agency. (A) Lead Up To 25 Km 59. Providing And Laying 20Mm Thick Compacted Mix Seal Coat By Using Stone Chips As Per Mort & H Gradation & Vg.-30 Grade Asphalt For Mixing @ 5.09% By Weight Of Total Mix Including Tack Coat Of Vg.- 30 2.5Kg./10 Sq.M. On Existing B.T. Surface For Binder Including Heating The Aggregate And Asphalt By Drum Mix Paint And Spreading The Same By Paver Finisher And Consolidation With Vibrator Roller Including Providing All Materials, Equipements, Tools, And Plants Oil, Kerosene,Firewood, Labour Charges Etc. Comp. Excluding The Cost Of Asphalt Supply By Deptt. @ Hajira Depo. & Carting The Same By The Agency. (B) Lead Up To 25 Km To 50 Km 60. Providing And Laying 20Mm Thick Compacted Mix Seal Coat By Using Stone Chips As Per Mort & H Gradation & Vg.-30 Grade Asphalt For Mixing @ 5.09% By Weight Of Total Mix Including Tack Coat Of Vg.- 30 2.5Kg./10 Sq.M. On Existing B.T. Surface For Binder Including Heating The Aggregate And Asphalt By Drum Mix Paint And Spreading The Same By Manual Means And Consolidation With Vibrator Roller Including Providing All Materials, Equipements, Tools, And Plants Oil, Kerosene, Firewood, Labour Charges Etc. Comp. Excluding The Cost Of Asphalt Supply By Deptt @ Hajira Depo. & Carting The Same By The Agency. (A) Lead Up To 25 Km 61. Providing And Laying 20Mm Thick Compacted Mix Seal Coat By Using Stone Chips As Per Mort & H Gradation & Vg.-30 Grade Asphalt For Mixing @ 5.09% By Weight Of Total Mix Including Tack Coat Of Vg.- 30 2.5Kg./10 Sq.M. On Existing B.T. Surface For Binder Including Heating The Aggregate And Asphalt By Drum Mix Paint And Spreading The Same By Manual Means And Consolidation With Vibrator Roller Including Providing All Materials, Equipements, Tools, And Plants Oil, Kerosene, Firewood, Labour Charges Etc. Comp. Excluding The Cost Of Asphalt Supply By Deptt @ Hajira Depo. & Carting The Same By The Agency. (B) Lead Up To 25 Km To 50 Km 62. Providing And Laying 20Mm Thick Compacted Mix Seal Coat By Using Stone Chips As Per Mort & H Gradation & Vg.-30 Grade Asphalt For Mixing @ 5.09% By Weight Of Total Mix Including Heating The Aggregate And Asphalt By Drum Mix Paint And Spreading The Same By Paver Finisher And Consolidation With Vibrator Roller Including Providing All Materials, Equipements, Tools, And Plants Oil, Kerosene, Firewood, Labour Charges Etc. Comp. (A) Lead Up To 25 Km 63. Providing And Laying 20Mm Thick Compacted Mix Seal Coat By Using Stone Chips As Per Mort & H Gradation & Vg.-30 Grade Asphalt For Mixing @ 5.09% By Weight Of Total Mix Including Heating The Aggregate And Asphalt By Drum Mix Paint And Spreading The Same By Paver Finisher And Consolidation With Vibrator Roller Including Providing All Materials, Equipements, Tools, And Plants Oil, Kerosene, Firewood, Labour Charges Etc. Comp. (B) Lead Up To 25 Km To 50 Km 64. Providing And Laying 20Mm Thick Compacted Mix Seal Coat By Using Stone Chips As Per Mort & H Gradation & Vg.-30 Grade Asphalt For Mixing @ 5.09% By Weight Of Total Mix Including Heating The Aggregate And Asphalt By Drum Mix Paint And Spreading The Same By Manual Means And Consolidation With Vibrator Roller Including Providing All Materials, Equipment, Tools, And Plants Oil, Kerosene, Firewood, Labour Charges Etc. Comp. (A) Lead Up To 25 Km 65. Providing And Laying 20Mm Thick Compacted Mix Seal Coat By Using Stone Chips As Per Mort & H Gradation & Vg.-30 Grade Asphalt For Mixing @ 5.09% By Weight Of Total Mix Including Heating The Aggregate And Asphalt By Drum Mix Paint And Spreading The Same By Manual Means And Consolidation With Vibrator Roller Including Providing All Materials, Equipment, Tools, And Plants Oil, Kerosene, Firewood, Labour Charges Etc. Comp. (B) Lead Up To 25 Km To 50 Km 66. Providing And Laying 20Mm Thick Compacted Mix Seal Coat By Using Stone Chips As Per Mort & H Gradation & Vg.-30 Grade Asphalt For Mixing @ 5.09% By Weight Of Total Mix Including Tack Coat Of Vg.- 30 2.5Kg./10 Sq.M. On Existing B.T. Surface For Binder Including Heating The Aggregate And Asphalt By Drum Mix Paint And Spreading The Same By Paver Finisher And Consolidation With Vibrator Roller Including Providing All Materials, Equipements, Tools, And Plants Oil, Kerosene, Firewood, Labour Charges Etc. Comp. (A) Lead Up To 25 Km 67. Providing And Laying 20Mm Thick Compacted Mix Seal Coat By Using Stone Chips As Per Mort & H Gradation & Vg.-30 Grade Asphalt For Mixing @ 5.09% By Weight Of Total Mix Including Tack Coat Of Vg.- 30 2.5Kg./10 Sq.M. On Existing B.T. Surface For Binder Including Heating The Aggregate And Asphalt By Drum Mix Paint And Spreading The Same By Paver Finisher And Consolidation With Vibrator Roller Including Providing All Materials, Equipements, Tools, And Plants Oil, Kerosene, Firewood, Labour Charges Etc. Comp. (B) Lead Up To 25 Km To 50 Km 68. Providing And Laying 20Mm Thick Compacted Mix Seal Coat By Using Stone Chips As Per Mort & H Gradation & Vg.-30 Grade Asphalt For Mixing @ 5.09% By Weight Of Total Mix Including Tack Coat Of Vg.- 30 2.5Kg./10 Sq.M. On Existing B.T. Surface For Binder Including Heating The Aggregate And Asphalt By Drum Mix Paint And Spreading The Same By Paver Finisher And Consolidation With Vibrator Roller Including Providing All Materials, Equipements, Tools, And Plants Oil, Kerosene, Firewood, Labour Charges Etc. Comp. (A) Lead Up To 25 Km 69. Providing And Laying 20Mm Thick Compacted Mix Seal Coat By Using Stone Chips As Per Mort & H Gradation & Vg.-30 Grade Asphalt For Mixing @ 5.09% By Weight Of Total Mix Including Tack Coat Of Vg.- 30 2.5Kg./10 Sq.M. On Existing B.T. Surface For Binder Including Heating The Aggregate And Asphalt By Drum Mix Paint And Spreading The Same By Paver Finisher And Consolidation With Vibrator Roller Including Providing All Materials, Equipements, Tools, And Plants Oil, Kerosene, Firewood, Labour Charges Etc. Comp. (B) Lead Up To 25 Km To 50 Km 70. Providing And Applying Asphalt Painting On B.T. Surface With Mechanical Sprayer Using Bitumen 60/70 (Vg-30) At The Rate Of 5.00 Kg/10 Sq.Mt. & Spreading Stone Dust On Painting Surface At The Rate Of 0.03 Cu.M./10 Sq.Mt. And Rolling With Smooth Wheeled And Pneumatic Roller And Brushing Etc. Complete. (A) Lead Up To 25 Km 71. Providing And Applying Asphalt Painting On B.T. Surface With Mechanical Sprayer Using Bitumen 60/70 (Vg-30) At The Rate Of 5.00 Kg/10 Sq.Mt. & Spreading Stone Dust On Painting Surface At The Rate Of 0.03 Cu.M./10 Sq.Mt. And Rolling With Smooth Wheeled And Pneumatic Roller And Brushing Etc. Complete. (B) Lead Up To 25 Km To 50 Km 72. Providing And Applying Asphalt Painting On B.T. Surface With Mechanical Sprayer Using Bitumen 60/70 (Vg-30) At The Rate Of 5.00 Kg/10 Sq.Mt. & Spreading Stone Dust On Painting Surface At The Rate Of 0.03 Cu.M./10 Sq.Mt. And Rolling With Smooth Wheeled And Pneumatic Roller And Brushing Etc. Complete. Excluding The Cost Of Asphalt Supply By Deptt. @ Hajira Depo. & Carting The Same By The Agency. (A) Lead Up To 25 Km 73. Providing And Applying Asphalt Painting On B.T. Surface With Mechanical Sprayer Using Bitumen 60/70 (Vg-30) At The Rate Of 5.00 Kg/10 Sq.Mt. & Spreading Stone Dust On Painting Surface At The Rate Of 0.03 Cu.M./10 Sq.Mt. And Rolling With Smooth Wheeled And Pneumatic Roller And Brushing Etc. Complete. Excluding The Cost Of Asphalt Supply By Deptt. @ Hajira Depo. & Carting The Same By The Agency. (B) Lead Up To 25 Km To 50 Km 74. Providing & Laying 75 Mm Thick Compacted Built Up Spray Grout Base Course In Two Layers With Bitumen Grade 80/100 At Rate Of 15 Kg. Per 10 Sqmt With 0.50 Cum Stone Aggregate For First Layer And 15 Kg Of Bitumen And 0.50 Cum Stone Aggregate Per 10 Sqmt. Of Road Surface For Second Layer And Using 0.13 Cum Of Key Aggregate Per 10 Sqmt Including Consolidation With Vibratory Roller And Tack Coat Using Asphalt 80/100 At Rate Of 2.50 Kg/10 Sqmt Etc. Complete Including The Cost Of Asphalt And Stone Aggregate. (A) Lead Up To 25 Km 75. Providing & Laying 75 Mm Thick Compacted Built Up Spray Grout Base Course In Two Layers With Bitumen Grade 80/100 At Rate Of 15 Kg. Per 10 Sqmt With 0.50 Cum Stone Aggregate For First Layer And 15 Kg Of Bitumen And 0.50 Cum Stone Aggregate Per 10 Sqmt. Of Road Surface For Second Layer And Using 0.13 Cum Of Key Aggregate Per 10 Sqmt Including Consolidation With Vibratory Roller And Tack Coat Using Asphalt 80/100 At Rate Of 2.50 Kg/10 Sqmt Etc. Complete Including The Cost Of Asphalt And Stone Aggregate. (B) Lead Up To 25 Km To 50 Km 76. Providing & Laying 37.5 Mm Thick Compacted Built Up Spray Grout Base Course In Single Layer With Bitumen Grade 80/100 At Rate Of 15 Kg. Per 10 Sqmt With 0.50 Cum Stone Aggregate Per 10 Sqmt. Of Road Surface And Using 0.13 Cum Of Key Aggregate Per 10 Sqmt Including Consolidation With Vibratory Roller And Tack Coat Using Asphalt 80/100 At Rate Of 2.50 Kg/10 Sqmt Etc. Complete Including The Cost Of Asphalt And Stone Aggregate Etc. Complete. (A) Lead Up To 25 Km 77. Providing & Laying 37.5 Mm Thick Compacted Built Up Spray Grout Base Course In Single Layer With Bitumen Grade 80/100 At Rate Of 15 Kg. Per 10 Sqmt With 0.50 Cum Stone Aggregate Per 10 Sqmt. Of Road Surface And Using 0.13 Cum Of Key Aggregate Per 10 Sqmt Including Consolidation With Vibratory Roller And Tack Coat Using Asphalt 80/100 At Rate Of 2.50 Kg/10 Sqmt Etc. Complete Including The Cost Of Asphalt And Stone Aggregate Etc. Complete. (B) Lead Up To 25 Km To 50 Km 78. Providing And Laying Wet Mix Macadam Base Course 300 Mm Thick In Two Layers As Per Morth Specification Using Machine Crushed B.T. Chips As Per Required Gradation, Mixing With Required Optimum Quantity Of Water, Conveying The Mix To Site Of Work, Spreading In To Grade And Camber With Paver/Mechanical Means And Consolidation Each Layer With Vibratory Roller To Aschieve The Desired Density Including Cost Of Material Labour Plant And Equipment Etc. Complete. (A) Lead Up To 25 Km 79. Providing And Laying Wet Mix Macadam Base Course 300 Mm Thick In Two Layers As Per Morth Specification Using Machine Crushed B.T. Chips As Per Required Gradation, Mixing With Required Optimum Quantity Of Water, Conveying The Mix To Site Of Work, Spreading In To Grade And Camber With Paver/Mechanical Means And Consolidation Each Layer With Vibratory Roller To Aschieve The Desired Density Including Cost Of Material Labour Plant And Equipment Etc. Complete. (B) Lead Up To 25 Km To 50 Km 80. Construction Of Granular Sub-Base 200 Mm Thick In Two Layers By Providing Coarse Graded Machine Crushed Material Satisfying Most Specification Of Grading I (B.T. Stone Aggregate 53Mm To 26.5 Mm 35% ,26.5Mm To 4.75 Mm - 45% And 2.36 Mm Below - 20 % ) Including Spreading In Uniform Layer With Motor Grader On Prepared Surface, Mixing By Mix In Place Method With Rotavator At Omc And Compacting With Vibratory Roller To Achieve The Desired Density Etc. Complete (A) Lead Up To 25 Km 81. Construction Of Granular Sub-Base 200 Mm Thick In Two Layers By Providing Coarse Graded Machine Crushed Material Satisfying Most Specification Of Grading I (B.T. Stone Aggregate 53Mm To 26.5 Mm 35% ,26.5Mm To 4.75 Mm - 45% And 2.36 Mm Below - 20 % ) Including Spreading In Uniform Layer With Motor Grader On Prepared Surface, Mixing By Mix In Place Method With Rotavator At Omc And Compacting With Vibratory Roller To Achieve The Desired Density Etc. Complete (B) Lead Up To 25 Km To 50 Km 82. Construction Of Granular Sub-Base 100 Mm Thick By Providing Machine Crushed B.T. Material Satisfying Mort&H Specification (Fifth Revision) Of Grading V Including Spreading In Uniform Layer With Motor Grader On Prepared Surface, Mixing By Mix In Place Method With Rotavator At Omc And Compacting With Vibratory Roller To Achieve The Desired Density Etc. Complete. (A) Lead Up To 25 Km 83. Construction Of Granular Sub-Base 100 Mm Thick By Providing Machine Crushed B.T. Material Satisfying Mort&H Specification (Fifth Revision) Of Grading V Including Spreading In Uniform Layer With Motor Grader On Prepared Surface, Mixing By Mix In Place Method With Rotavator At Omc And Compacting With Vibratory Roller To Achieve The Desired Density Etc. Complete. (B) Lead Up To 25 Km To 50 Km 84. Providing And Laying Quarry Spall Of Approved Quality Including Spreading, Watering Consolidation With Vibratory Roller Including Loading And Unloading Etc. Complete.

Key Value

Document Fees
INR 900 /-
EMD
INR 25000.0 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail