South Eastern Coalfields Limited-SECL has published Widening Of 29L Md2 Strata Bunker With Construction Of 04 Nos. Rcc Wall In Vi Top Seam To Increase Its Capacity To Match The Cm Production At Bangwar Ug Mine Of Sohagpur Area Widening Of 29L Md2 Strata Bunker With Construction Of 04 Nos. Rcc Wall In Vi To. Submission Date for this Tender is 03-09-2021. Bunker Tenders in Bangwar UG MIne of Sohagpur Area Madhya Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Item Description/ Heading Part (A) labour Cost |
2 | Cleaning removal of debris/stone from galleries and stacking withi 50m distance |
3 | Cutting in soft stonel byChisel & Hammer |
4 | Cutting of coal by using chisel/pick-axe |
5 | Reinforced cement concrete (1:2:4) inWall /roof ceiling of air crossing/stopping (any thickness)in u/g(Excluding centring, shuttering, reinforcement cutting, RCC (1:2:4) inwall/roof ceiling of air crossing/ stopping (any thickness) in u/g (Excluding centring, shuttering, reinforcementcutting, bending, placing inposition and binding etc allcomplete as well as cost of RCC materials) |
6 | 06mm Thick cement plaster ratio of 1:6 to RCC/PCC work in u/g including curing etc complete(exclusive cost of material) |
7 | Loading of all kinds of buildingmaterials into Tub at Incline/pit mouth on surface with lead of 50m |
8 | Transportaion of allkind of building materials from surface to u/g through haulageswith tramming & pushingcoupling & uncoupling etc for a distance 02 KM or part there of and bringing the empty tub to the surface |
9 | Lead for transportation ofmaterials by manualup to 75 mtr. |
10 | Centring, shuttering, finishing andreinforcement including cutting, bending, placing inposition and binding and strutting, propping etc complete. |
11 | Un-loading of all kinds of building materials from tubs at destination in u/g and stacking the same ³ |
12 | Drilling , Blasting & mucking manually in stone (drilling by power drill ) |
13 | Roof bolting in underground.. By power drill manually …etc Note- all material to be provided bySECL Mamagement . |
14 | Part-B Material Cost supply and stacking of building materialsCement |
15 | Sand - |
16 | Stone chips(20mm) |
17 | Steel rod(12mm) |
18 | Total impact of GST for the purpose of CTC |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail