Third Party Inspection For 1400Mt Horton Sphere Statutory Testing And Thermo Well Removal Works At Indane Bottling Plant, Erode Third Party Inspection For 1400Mt Horton Sphere Statutory Testing And Thermo Well Removal Works At Indane Bottling Plant, Ero, Services-Tamil Nadu
TDR : 28915282
Tender Notice
BOQ
Expired
Services
Tamil Nadu
Third Party Inspection For 1400Mt Horton Sphere Statutory Testing And Thermo Well Removal Works At Indane Bottling Plant, Erode Third Party Inspection For 1400Mt Horton Sphere Statutory Testing And Thermo Well Removal Works At Indane Bottling Plant, Ero
Name of Work:Third Party Inspection for 1400MT Horton sphere Statutory Testing and Thermo well removal works at Indane Bottling Plant, Erode
Sl. No.
Item Description
1
PART-A: Third Party Inspection for statutory testing of 1x1400MT Horton sphereThird partyinspection services for statutory testing of Horton Sphere including the scope of jobs of 1.Visual inspection of Horton Sphere, 2.Internal /external inspectionof theentire surface of the Horton Sphere to detect for deterioration. 3. Witnessing, Guiding, Supervising, interpretation and analysis ofNDTas perscope of work given in the schedule 4.Witnessing Hydrostatic test and witnessing leg settlement during progressivewater filling5. Preparation of detailed report containingobservations, recommendations and certification as per SMPV rules and OISD, including submission of certificate of control and uploading in online to comply with PESO
2
PART-B: Third Party Inspection for Thermowell removal work for 1x1400MT Horton sphere1.Certification of QAP and WPS for thermowell work2.Verification and witnessing thermowell works as per QAP and WPS 3.Verification of inward pipe material and consumables along with test certificates4.Certification/verification of welder qualification.5.Witnessing and certification of complete process and NDT works mentioned in M/s PDIL procedure document (4004006437-IOCL-IAP 01)6. Providing Control certificate forHorton sphere as per PESO requirement7. Approval of as built Horton Sphere drawing and submission to PESO for final approval.8. Preparation of detailed report containingobservations, recommendations and certification as per SMPV rules and OISD, including submission of certificate of control, uploading in online to comply with PESO.
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.