Construction Of Link Road G.P.S To Saman Kothi K. 0 / 0 To 1 / 0 Sh C / O R / Wall At Rd 0 / 050 To 0 / 060 0 / 145 To 0 / 155 C / O Causeway At Rd 0 / 620 To 0 / 630 P / L Gsb And Wmm In Km 0 / 0 To 0 / 300 0 / 310 To 0 / 620 0 / 630 To 1 / 0 And P
Tender Overview
Project Description
Construction Of Link Road G.P.S To Saman Kothi K. 0 / 0 To 1 / 0 Sh C / O R / Wall At Rd 0 / 050 To 0 / 060 0 / 145 To 0 / 155 C / O Causeway At Rd 0 / 620 To 0 / 630 P / L Gsb And Wmm In Km 0 / 0 To 0 / 300 0 / 310 To 0 / 620 0 / 630 To 1 / 0 And P / L Cement Concrete Pavement At Rd 0 / 300 To 0 / 310 Under Otmnp Head
BOQ
| Sl. No. | Item Description |
| 1 | Earth work in excavation for all type of road structure such as retaining walls ,breast walls, culverts, drains and parapets etcetera in all type of classification of soil comprising of ordinary soil . ordinaryrock, hard rock, chiseling/ wedging outof rock(where blasting is prohibited ) as per drawings and M.O.R.D technical specification clause 305-1 and as per direction of the Engineer-in- Charge including setting out, construction of shoring and bracing removal of stumps and other deleterious materials and disposal of materials upto any leads and lifts including dressing of sides and bottom and back filling in trenches with excavated suitable approved material to the original surface in layers not exceeding 150mm(one hundred fifty millimetre) compacted thickness including shoring and strutting and pumping and bailing out water ( surface and sub soil water) upto any depth and any quantum of water including cleaning of slush which may arise out during dewatering as per the direction of the Engineer-in- Charge including carriage of materials within all leads and lifts and other incidentals. The rates are inclusive octroi , royality , Malkana, toll tax,GSTor other taxes imposed by the Government |
| 2 | Back filling behind abutment wing wall and return wallwith granular materialcomplete as perdrawing and technical specification clause 1204.3.8including carriage of material within all leads and lifts and other incidentals. The rates are inclusive octroi , royality , Malkana, toll tax, , GST or other taxes imposed by the Government |
| 3 | Providing weep holes in brick masonry / stone masonry /plainand reinforcedconcrete abutment , wing wall ,return wall ,retaining andbreast wall with 110mm (one hundredten millimetre) dia PVC pipe (D-plast)/ Finolex/ Supremehaving working pressurenotless than 4 kg percentimeter square(FourKilogram percentimeter square )extending through the full widthof the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification clause 614, 709, 1204.3.7 as per direction of Engineer-in- Charge includingentire carriage of material within all leads and lifts and other incidentals The rates are inclusive octroi , royality , Malkana, toll tax,GST or other taxes imposed by the Government |
| 4 | Providingand laying mechanically mixed and vibrated cement concrete nominal mix1:3:6 (one cement :three Sand :six graded crushed stone aggregate 20mm (twenty millimetrenominal size)on ground or under water and curing completeincluding pumping or bailing out water, dewatering removal of slush as required at site which may arise at the time of laying underwater complete for all heights and depths including cost ofform workfor plain concrete in drain andchannel etc. open foundations complete as per drawing and technical specificationclause 802,803, 1202 &1203including carriage of material within all leads and lifts and other incidentals . The rates areinclusive octroi , royality , Malkana, toll tax, GST or other taxes imposed by the Government . |
| 5 | Providing and laying cement concrete 1:5:10(one cement : Five sand : ten gradedcrushed / broken stone aggregate 40mm (forty millimetre nominal size)and curing complete including the cost of form work with M.S platesfor plain concrete on ground or under water and curing completeincluding pumping or bailing out water, dewatering removal of slush as required at site which may arise at the time of laying underwater complete for all heights and depths.In retaining walls /breast wallsas per drawing and technical specifications clause 802,803,1202and 1203 and as per direction of Engineer-in- Chargeincludingentire carriage of material with in all leads and lifts and other incidentals .The rates areinclusive octroi , royality , Malkana, toll tax, GSTor other taxes imposed by the Government . |
| 6 | Stone soling properly hand packed filling intersties with spells and consolidating with power road rollerto the required gradientand camber including spreading watering and rolling of binding materials moorum or earth etc. complete as perdrawing and technical specification 100mm(one hundred millimeter ) spread thickness including material and labourincluding carriage of material within all leads and lifts and other incidentals The rate inclusive ofOctroi, Toll Tax , GSTor any other taxes imposed by the Government |
| 7 | Providingand laying mechanicallymixed and vibrated plain / reinforced cement concrete standarddesign mixed two obtain minimum can prersibestrength of M-25(M-twenty five) with nominal size using minimumcementcontents of 400kg (Four hundred kilogram) per cubic metregraded crushed stoneaggregate 20mm (twenty millimeter ) nominal size for plain/reinforcement concrete in open foundations complete upto any heightincluding form work withM.S plate completeas per drawing and technical specifications clause 802,803, 1202 &1203including carriage of material within all leads and lifts and other incidentals.The rates areinclusive octroi , royality , Malkana, toll tax, GSTor other taxes imposed by the Government |
| 8 | Preparationof sub grade by dressing to camber (earth work for the cutting involved for sub-grade to be paid for separately depending upon the classification of soil) completeas per HP.PWD specificationincluding carriage of material within all leads and lifts and other incidentals .The rateinclusive octroi , royality , Malkana, toll tax,GST or other taxes imposed by the Government . |
| 9 | Consolidation of sub grade with road roller includingmaking good the undulation etceterawith earth or quarry soil etceteraand re-rolling the sub-grade complete as per HP.PWD specificationincluding carriage of material within all leads and lifts and other incidentalsThe rates areinclusive octroi , royality , Malkana, toll tax,GST or other taxes imposed by the Government . |
| 10 | Construction ofgranularsub base by providing well graded material mixing in a mechanical mix plant atOMC carriage ofmixed material to work site upto allleads spreading in uniform layers with motor grader on prepared surface and compactedwith smooth wheel rollerto achieve the desired density, complete as per technical Specification Clause 401.By plant mix method for grading –I material including carriage of material within all leads and lifts and other incidentalsThe rates areinclusive octroi , royality , Malkana, toll tax,GST or other taxes imposed by the Government . |
| 11 | Providing and laying spreading and compacting stone aggregates to wet mix macadam 150mm(one hundred fifty millimetre) thick to be laid in two equal layers 75mm( seven five millimetre) each specification including premixing the material with water at OMC in mechanical mixer (pug Mill) carriage of mixed material by tipper to site laying in uniform layers in sub base / base course on a well prepared sub base and competing with smooth wheel roller of 80-100KN weight to achieve the desired density including lighting barricading and maintenance of diversion etc. as per table 400-11 &400-12 and Technical specification clause 406. carriage of materials within all leads and lifts and other incidentals. The rates are inclusive octroi , royality , Malkana, toll tax, GST or other taxes imposed by the Government . |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender