Name of Work: REPAIRING OF I.P.S. AND PAVER BLOCK FOOTPATH AT ANIL ROY ROAD, DOVERLN & OTHER PLACES IN WD NO-86.
Sl. No.
Item Description
1
TAKING-OUT AND RE-LAYING OF EXISTING INTERLOCKING PAVER BLOCKS IN FOOT-PATH OR PASSAGE ETC. OVER 20-40 MM THICK MEDIUM YELLOW SAND BED WITH TRUE TO LINE, LEVELLING, PROPER COMPACTION WITH VIBRATER ETC. WITH JOINTING WITH KERB/EDGE TO BE MADE WITH CEMENT CONCRETE (1:2:4) ETC. AS PER THE DIRECTION OF THE ENGINEER-IN-CHARGE. INCLUDING COST OF TAKING OUT AND USING 20% NEW SAND AND ALL MATERIALS, LABOUR ETC COMPLETE.
2
BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 1.Surface Dressing of the ground in any kind of soil including removing vegetation inequalities not exceeding 15 cm depth and disposal of the rubbish within a lead upto 75 m as directed.
3
BUILDING WORKS(P) SOLING, EDGING AND METALLING??(2)Labour for laying soiling with departmental bricks including carriage of departmental bricks within a lead of 150 metres preparation of bed as necessary with brick joints properly filled in and packed with brick joints properly filled in and packed with local sand or powdered earth and including necessary cushion of similar materials below the soling (and in between layers when more than one layer is used)(The item included the cost of obtaining local sand or powdered earth)(a) Single brick flat soling (thickness 75 mm)
4
BUILDING WORKS(P) SOLING, EDGING AND METALLING??(1)Brick soling with picked jhama bricks including preparation of bed as necessary with brick joints properly filled in and packed with powdered earth and including necessary cushion of similar material below the soling (and in between layers when more than one layer is used) completes as per direction.(a) Single brick flat soling (thickness 75 mm.)
5
35mm thick Cement Concrete Pavement (1:2:4) in floor/footpath etc. with graded stone chips 11.2mm down,properly leveled with 3mm thick screen on top by cement slurry [email protected] cement per Sqm. Rounding off corners, chequering as required including taking necessary protective measure complete in Gr.floor/footpath.
6
ORDINARY CEMENT CONCRETE (MIX 1;3;6) WITH GRADED STONE CHIPS (20 MMNOMINAL SIZE ) EXCLUDING SHUTTERING AND AND REINFORCEMENT , IF ANY IN GROUND FLOOR AS PER RELEVANT IS CODES
7
SUPPLYING AND LAYING IN THE SPECIFIED PATTERN OF INTERLOCKING CONCRETE BLOCK PAVEMENT(ICBP) WITH CONCRETE BLOCKS WITH CONCRETE GRADE AS SPECIFIED ( AS PER TABLE 1 OF IS 15658:2006) MANUFACTURED FROM RIS LICENSEE MANUFACTURER, WITH SPACER NIB(SMALL PROTRUDING PROFILES ON THE VERTICAL FACE OF A PAVER BLOCK USED AS A DEVICE FOR KEEPING MINIMUM JOINT GAP IN BETWEEN THE PAVING BLOCKS AS PER CL NO 3.26 OF IS 15658) AND OF SPECIFIED SIZE AND SHAPE WITH ASPECT RATIO (THE RATIO OF LENGTH TO THICKNESS OF A PAVERBLOCK AS PER CL NO 3.3 OIS: 15658)AS PER TABLE 2 OF IS: 15658 WITH FLEXURAL STRENGTH / BREAKING LOAD AS PER ANNEXURE G OF IS:15658ON THE PREPARED BASE COURSE OF SPECIFIED CBR AS PER TABLE 1 OF IRC SP 63 (2018)OR ELSE AS MENTIONED IN DESIGN AND DRAWING WITH A CUSHION OF COMPACTED HEDDING SAND OF 25-35 MM THICK(GRADING OF THE BEDDING SAND AS PER CLAUSE 6.5.1OF IRC SP 63) AND FILLING THE GAPS BETEEN PAVER BLOCKS WITH JOINT FILLING SAND ( THE GRANDING OF THE JOINT FILLING SAND WILL BE AS PER CLAUSE 6.5.2 OF IRC SP 63) AND COMPLETTING EDGES WITH CUT BLOCK AS PER CL NO 8.7 OF IRC SP-63 (2018) WITH PROPER CONFINEMENT OF HEDDING AND JOINT FILLING SAND COMPACTION, LEVELLING AND UP THE EDGE GAP,50 MM THICK, (II)COLOURED DECORATIVE
8
Raising manhole cover and frame with CBW (1:4), 250mm thick up to 100mm high with 20mm thick sand and cement plaster including finishing with neat cement after cutting the asphaltum pavement and taking out and re-fixing the existing manhole cover and frame with cement concrete (1:1.5:3) with stone chips all round the frame surface including removal of surplus spoils.
9
Raising cover and frame of Special Inspection Pit with CBW (1:4), 250 mm thick up to 100mm high with 20mm thick sand and cement plaster (1:4) including finishing with neat cement after cutting the asphaltum pavement taking out and re-fixing the existing cover and frame with cement concrete (1:1.5:3) with stone chips all round the frame surface including removal of surplus spoils.
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.