| 1 | Dismantling of brick work or stone work in lime or cement mortor including stacking of materials as per direction of Engineer in-charge. |
| 2 | Excavation in foundation soil (Loam clayor sand)including left up to 1:50M (5FT) and lead up to 30M (100FT) & including filling watering and ramming of excavated earth into the foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer in-charge up to a distance of 30M (100FT) from the foundation trenches. |
| 3 | Class M-150 brick work in 1:6 cement with coarse sand of 2.25 FM mortor in foundation and plinth including the supply of all materials labour and T&P etc. required for proper completion of the work. |
| 4 | Providing and laying in cement concrete 1:5:10 cement, fine sand and brick aggregate 40MM nominal size and curring complete including cost of from work in foundation and floor. |
| 5 | RCC work with cement approved coarse sand and 2cm (3/4”) gauge approved stone ballast in the proportion of 1:2:4 in raft foundation & footing excluding supply of reinforcement and its bending the same with 24BWG including wire and necessary centering and shuttering and also including supply of all materials, labour T&P etc. required for proper completion of the work strength of the concrete shall not be less than M-150 |
| 6 | Same us item No. 5 above but RCC column. |
| 7 | Class M-150 brick work 1:6 cement with coarse sand mortor in super structure including necessary cutting and moulding of brick work as required and also including honey combed brick work (thickness of wall not to be less than 1 brick.) |
| 8 | Same us item No. 5 above but in lintal & bands. |
| 9 | 12MM thick plaster with cement mortor in proportion of 1:6 cement &coarse and of 2.25 FM including supply of all materials, labour and T&P etc. required for proper completion for the work. |
| 10 | Mild steel or iron in plain work such as rein-forced concrete or reinforced brick work (when not wrought to include in overall rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of its wastage bend, hooks and authorized overlapping shall be measured (excluding cost ofreinforcement) |
| 11 | Finishing walls with water proof cement paint 2 coats of approved make and quality on previously old treated surface to give and even shade including supply of all materials, labour and T&P etc, required for proper completion of the work. |
| 12 | Mild steel or iron work of heavy sizes such as column, trusses, portals, crane, gantries, built up gates, door frame, record racks, roof work rain water gutter of MS plates, wind ties etc. as per drawing supply including hoisting, welding as required drilling holes including cost of approved welding rods charges of all steels, T&P etc. such as electric welding machines, winches, chain pulley block drill machine and steel wire/manila ropes etc. including all bolts and nuts (excluding foundation bolts) and labour and T&P etc. required for proper completion of the work (excluding tested steel confirming to I.S.I 226-1958) with one coat of red oxide metal primer (labour rate only) |
| 13 | Providing laying barbed iron wire fencing including fixing it to post after stretching it including labour and T&P etc, required for proper completion of the work also including supply of wire and excluding supply of post (labour rate only) |
| 14 | Painting or varnishing 2 coats on previously paited surface including supply of all materials, labour and T&P etc, required for proper completion of the work. |
| 15 | Removal & disposal of malwa such as old refuse bagasse deposited around the damaged boundary wall both side including all labour T&P etc, with all cartage as per direction of engineer in-charge. |