| 1 | ERACTION, TESTING & COMMISSIONING ETC |
| 2 | ERECTION OF STRUCTURE - 220/132/33KV GANTRIES, BUSBAR, EQUIPMENT (IN MT)-Erectionofstructuresincludingfixing&alignmentoftemplates for grouted / bolted type structure foundations,tighteningofnuts&boltswashers etc & including alignment & leveling of structure. |
| 3 | ERECTION OF 132KV CB- Erection on structures and alignment, shifting of breaker upto the place and placement of all 3 circuit breaker poles on structure and alignment. Complete assembly of circuit breaker including erection of control cabinet & mechanism box, interconnecting piping work, erection of all accessories for the equipment. |
| 4 | ERECTION OF 132 KV CT-Shifting on current X’mer upto civil foundation and placement on structure and fixing of junction box including all accessoriesetc. |
| 5 | ERECTION OF 132 KV ISOLATOR(3 Phase) - Shifting upto civil foundation & Placement of complete isolator in all 3 phases of 132 KV Isolator structure including shifting within s/s premises. Erection / Mounting of mechanism box, interconnection, piping alignment of contacts & all associated activities with P. I. |
| 6 | ERECTION OF 132 KV ISOLATOR(1 Phase) - Shifting upto civil foundation & Placement of complete isolator 1 phases of 132 KV Isolator structure including shifting within s/s premises. Erection / Mounting of mechanism box, interconnection, piping alignment of contacts & all associated activities with P. I. |
| 7 | ERECTION OF 132 KV LA-Shifting & placement of 132 KVLA\"s on structure including all accessories, making all interconnections checking & installation of insulator base and surge counters. |
| 8 | ERECTION OF 132 KV C & R PANEL-Unloading /Shifting up to control room (including storage if required) and placement complete with all relays & accessories.The placement of C&R panel to be done on MS channel frame and MS Channel frame will suitable grouted in control room as per drawing.The cutting,welding & fabrication of of MS channel frame is to be done as per drawing.Proper alignment of C&R panel to be done.The earthing of C&R Panel to be done.Making of all interconnections for the control & relay panel on terminal block as per drawing including all AC & DC connections. |
| 9 | ERECTION OF 132 KV PT-Shifting of PT upto civil foundation and placement on structure and fixing of junction box including all accessoriesetc. |
| 10 | Erection of Solid Core Insulator with PI Structure |
| 11 | Erection of Junction Box |
| 12 | Erection of 33/0.4 KV 200 KVA Station Xmer |
| 13 | Erection of 33 KV DP along with LA and DO Fuse |
| 14 | Erection of 33 KV Isolator (3 Phase) |
| 15 | Erection of 33 KV PT-Shifting of current X’mer upto civil foundation and placement on structure and fixing of junction box including all accessoriesetc. |
| 16 | Erection of 33 KV VCB-Shifting of breaker upto the place and placement ofon structure and alignment. Complete assembly of circuit breaker including erection of control cabinet & mechanism box, interconnecting piping work, erection of all accessories for the equipment. |
| 17 | Erection of 33 KV CT-Shifting of current X’mer upto civil foundation and placement on structure and fixing of junction box including all accessoriesetc. |
| 18 | Erection of 33 KV LA |
| 19 | Erection of LT Distributin box |
| 20 | CABLE LAYING-Laying of copper cables (armoured/unarmoured) on racks/cable trays/ angle support overhead racks conduits including dressing of cables with accessories for copper conductor & armoured control cables. |
| 21 | 2 Core 2.5 Sq mm Unarmoured |
| 22 | 4 Core 2.5 Sq mm Unarmoured |
| 23 | 8 Core 2.5 Sq mm Unarmoured |
| 24 | 12 Core 2.5 Sq mm Unarmoured |
| 25 | 19 Core 2.5 Sq mm Unarmoured |
| 26 | CABLE TERMINATION-Cable terminations including fixing of cable glands, lugs etc. for each type of control/ power cables, including terminations at both ends. I.R. value between cores and I.R. value with respect to its armouring is to be verified. The continuity of all cores is also to be verified. Both work to be done before connecting cable to the terminal block. Making suitable hole in bottom/side plate of C&R panel, AC/DC Board, Marshaling box, CT/PT sec box and CB mechanism box for fixing cable glands in addition to cable gland holes already provided. The hole should be free from burrs. Fixing all cables in respective cable glands and refixing gland plate to its original place. All cable identification plate is to be provided on both ends of each cable. Stripping of outer insulation cover , armouring etc. of cable, fixing ferrules on each core at both ends.Stripping all cores to suitable length, making eye, crimping terminal lugs (as the case may be ) and fixing it to terminal block as per drawing followed by proper bending/ dressing of all cores. |
| 27 | 2 Core 2.5 Sq mm Unarmoured |
| 28 | 4 Core 2.5 Sq mm Unarmoured |
| 29 | 8 Core 2.5 Sq mm Unarmoured |
| 30 | 12 Core 2.5 Sq mm Unarmoured |
| 31 | 19 Core 2.5 Sq mm Unarmoured |
| 32 | M S FLATE LAYING |
| 33 | MS Flat for Earthing (65X8) |
| 34 | MS Flat for Earthing (50X6) |
| 35 | Earthing Rods (25 mm X 3000 mm) |
| 36 | Preparation of earthing pits (1.5 X 1.5 X 3 Mtrs.) |
| 37 | STRINGING & JUMPERING |
| 38 | Twin Zebra Conductor |
| 39 | Single Zebra Conductor |
| 40 | Overhead Earth Wire |
| 41 | DISMENTALING |
| 42 | DISMENTALING OF TRANSFORMER-Dismantling of unit of 33/0.4 KV StationTransformer from existing foundation and shift to spare safe place. |
| 43 | Dismentling of 132 KV Isolator from existing structure and shift to spare safe place |
| 44 | Dismentling of 132 KV PT from existing structure and shift to spare safe place |
| 45 | Dismentling of 132 KV LA from existing structure and shift to spare safe place |
| 46 | Dismentling of 33 KV Isolator from existing structure and shift to spare safe place |
| 47 | Dismentling of 33 KV LA from existing foundation and shift to spare safe place |
| 48 | Dismentling of 33 KV CT from existing structure and shift to spare safe place |
| 49 | Dismentling of 33 KV CBfrom existing structure and shift to spare safe place |
| 50 | Dismentling of 33 KV DO Set completefrom existing structure and shift to spare safe place |
| 51 | Dismentling of LT Distribution Boxfrom existing foundation and shift to spare safe place |
| 52 | Dismentling of Junction Box from existing foundation and shift to spare safe place |
| 53 | Dismentling of Structure - 220/132/33KV gantries, Busbar, Equipments from existing foundation and shift to spare safe place |