| 1 | Daily Sweeping, cleaning and moping of floors, steps, dado etc with broom sticks & wet clothes with phenyl water etc.,&Daily cleaning the dust from walls, roofs, corridors etc.&Daily cleaning toilet and wash basin with vim powder, phenyl, naphthalene balls as requiredAt Stage-I Power House complexNote: All the tools & tackles and required consumables is included in the item |
| 2 | Weekly Cleaning & mopping of each doors, windows, glass panes / glazings for fixed as well as open-able windows), MS grills etc. at Stage-I Power House complex, by soap / detergent water and rubbing with cloths etc.in all type of turbine floor and movement area surrounding of all the four units and & Weekly scraping & removing greasy soot from each wall, ceiling, floors etc.at turbine floor with dry coir ropes,jute bags and detergent as required.Note: All the tools & tackles and required consumables is included in the item |
| 3 | Weekly cleaning of each plinth area drains including each plinth surface area around departmental quarters at face-6 colony includingspraying bleaching powder on the top surface of drains inside and outside as necessary. Note: All the tools & tackles and required consumables (other than bleaching powder) are included in the item.Cost of bleaching powder to be paid through item no- 05 |
| 4 | Weekly cleaning of each plinth area drains including each plinth surface area around Stage-I Power House, Annex Building, Diesel Generator room, Auxiliary Transformer room and Pump House includingspraying bleaching powder on the top surface of drains inside and outside as necessary. Note: All the tools & tackles and required consumables (other than bleaching powder) are included in the item.Cost of bleaching powder to be paid through item no- 05 |
| 5 | Supply of bleaching power of approved quality at site. |
| 6 | Grass and jungle cutting to keep compound area clean around Stage-I Power House complex, Stage-I Switch Yard, Diesel Power House and surroundings etc. as necessary and removing the same as directed including all incidental charges for tools and tackles in this context. |
| 7 | Removing sludge from septic tank, soak well etc. by methor labour including disposal of the same outside the compound as directed.(a) Upto 20 users:-(i) Within a lead of 150 metre |
| 8 | Cleaning silt of inspection pit. |
| 9 | Making one set of scafolding only for replacing glass panels, painting, uprooting plant and another repairing works only with 10 cm dia bamboo as main posts at the rate of 1 metre centre to centre and 7.5 cm dia bamboo ties @ 0.75 metre apart fitting and fixing with necessary coir, nails etc . as per direction of the Engineer in Charge.(This item should be executed only after prior approval of the Engineer-incharge). Firstly, one number to be paid and then labour rate for shifting up to further nineteenth (19) times @ 10% each time to be considered. If necessary further after twenty times of total use, another one number new and labour rate for shifting to be considered accordingly.a) 3.90 metre height |
| 10 | b) Extra for additional 3.6 height or part therof. |
| 11 | Supply of labour for various works related to Sweeping & cleaning as directed by the Engineer,Cost complete in all respect. |