}

Planning, Design, Engineering, Construction, Fabrication, Erection, Supply, Installation, Testing, Trial Run And Commissioning Of Coal Handling Plant For Nigahi On Turnkey Basis As Per Nit As Per Nit, NIGAHI OCP-Madhya Pradesh

Northern Coalfields Limited-NCL has published Planning, Design, Engineering, Construction, Fabrication, Erection, Supply, Installation, Testing, Trial Run And Commissioning Of Coal Handling Plant For Nigahi On Turnkey Basis As Per Nit As Per Nit. Submission Date for this Tender is 20-09-2021. Coal Handling Plant Tenders in NIGAHI OCP Madhya Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

28862339
Corrigendum : Planning, Design, Engineering, Construction, Fabrication, Erection, Supply, Installation, Testing, Trial Run And Commissioning Of Coal Handling Plant For Nigahi On Turnkey Basis As Per Nit As Per Nit
Open Tender
Indian
Madhya Pradesh
NIGAHI OCP
20-09-2021

Tender Details

Planning, Design, Engineering, Construction, Fabrication, Erection, Supply, Installation, Testing, Trial Run And Commissioning Of Coal Handling Plant For Nigahi On Turnkey Basis As Per Nit As Per Nit

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 19-Aug-2021 PRE BID MEETING VC LINK Other 06-09-2021
2 05-Sep-2021 EXTENSION OF DATE Date 20-09-2021

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
INR 652.76 Crore /-

BOQ Items

Name of the Work / Contract No:
Sl. No. Item Description
1A. WORK & SERVICES
2Detailed survey of the area, within the battery limits & submission of reports (complete work as per tender document)
3Sub soil exploration, field and laboratory testing of samples & submission of reports (complete work as per tender document)
4Design Engineering Cost
5Preparation and submission of system engineering drawings as per system requirements (As per system requirement)
6GA & detail engineering designs and drawings of all civil, structurals, developmental and infra-structural work included in the system and scope of works (complete details of the system)
7G.A. & detailed engineering designs and drawings including working and maintenance manuals of : i)All individual equipment ( Mechanical & Electricals)ii) Dust Control & Pressurisation system.iii) Fire-fighting and plant cleaning system. iv) Chutes & Liners v)Communication system vi) Power Supply System vii)Illumination system.ix) Plant control system x) OHE System x) Any other system/unit to matchthe scope of work& requirement (complete details of the system)
8Documentation as per tender specification (Complete as per scope of work)
9B. CIVIL & STRUCTURAL WORKS
10I Civil and structural work
11Truck Receiving Steel Hopper ( 5x100Te2sets)
12Truck Receiving Platform with Ramp/Approach Road and Retaining wall
13Semi-mobile crusher with 150Te hopper : Truck Receiving Platform with Ramp/Approach Road, Retaining wall and supports
14Conveyor galleries with all supporting arrangement
15Transfer Houses, Drive House, Sampler House, Secondary sizer-cum-Transfer House
1615000 Te Over Ground Bunker With maintenance bay
174000 Te Silo with Lift Well
18II Developmental work and infra-structure
191. CHP Office complex
20CHP office
21Rest Shelter
22Canteen (25 seater)
23First Aid centre
24Security post/time office
25LMV/Car Parking Shed
26Scooter/motor cycle Shed
27Electrical maintenance cum testing room
282. Store Complex
29Store shed
30Store room
313. Electrical sub-stations
324. Lighting Mast
335. Internal Approach Cement Concrete Road 3.75m wide carriage-way
346. Drains, Culverts
357. Boundary wall with gate, Barbed wire fencing
368. Ground Water Reservoir with Pump House
379. Water Supply distribution
3810. Collection sumps and arrangement for conveying of Industrial Effluent to existing ETP
3911. Sewerage
4012. Site Development (includes OB removal, levelling and storm water drains, Landscaping and Arboriculture and other misc. items of work)
41C. PLANT & MACHINERY (SUPPLY)
42C.(a)SUPPLY : MECHANICAL
43A. CONVEYORS
44B. BELTING
45C. EQUIPMEMT
46Receiving Section Mechanical Equipment
47Mechanical equipment in secondary sizer section
48MechanicalEquipment in Storage Section
49Mechanical Equipment at Transfer house
50Mechanical equipment at Loading Complex
51Mechanical Equipment required for dovetailing in existing system with due modification.
52OHE Equipment including mechanical, electrical and civil requirement
53Other mechanical equipment
54Dust suppression system with piping & other accessories. Condition monitoring system, Safety & firefighting system , and other misc. equipment/utility for any more item required to complete the project
55C.(b)SUPPLY : ELECTRICAL
56ELECTRICAL
57Substation-A(SS-1) Power receiving arrangment from substation A(SS-1) with Lightning Arrester and Isolator with earth switch as required. 6.6/0.433 kV, 250KVA Distribution transformer-2nos. 6.6/0.230 V (L-L), 100 kVA Lighting Transformer-2nos. 220V Lead Acid Battery complete with Battery Charging unit.-1 no. 6.6 kV 3 Phase, 3 Wire Switchboard 1A & 1B (Indoor ) Comprising of Incomer VCB, Buscoupler VCB and Outgoing VCBs/VCPs complete with metering and protection as required 415V,Aluminium Bus-duct as required. MCC at Substation-E2 Comprising of Incomer ACB, Buscoupler ACBs and Outgoing ACBs/MCCB/SFU/ Contactor as required. 6.6 kV and 415 V Capacitor with Automatic power factor correction of required capacity Banks for power factor improvement as required. Two number of single circuitof 6.6 kVOverhead line comprising of AAAC ’Wolf’ equivalent Conductor for power supply as required. Fire detection, Alarm and Protection system.
58B Substation-B(SS-2) Power receiving arrangment from substation A(SS-1) with Lightning Arrester and Isolator with earth switch as required. 6.6/0.433 kV, 1000KVA Distribution transformer-2nos. 6.6/0.230 V (L-L), 100 kVALighting Transformer-2nos. 220V Lead Acid Battery complete with Battery Charging unit.-1 no. 6.6 kV 3 Phase, 3 Wire Switchboard 2A & 2B (Indoor ) Comprising of Incomer VCB, Buscoupler VCB and Outgoing VCBs/VCPs complete with metering and protection as required 415V,Aluminium Bus-duct as required. MCC at Substation-E2 Comprising of Incomer ACB, Buscoupler ACBs and Outgoing ACBs/MCCB/SFU/ Contactor as required. 6.6 kV and 415 V Capacitor with Automatic power factor correction of required capacity Banks for power factor improvement as required. Two number of single circuitof 6.6 kVOverhead line comprising of AAAC ’Wolf’ equivalent Conductor for power supply as required. Fire detection, Alarm and Protection system.
59C Substation-C(SS-3) Power receiving arrangment from substation A(SS-1) with Lightning Arrester and Isolator with earth switch as required. 6.6/0.433 kV,250KVA Distribution transformer-2 nos. 6.6/0.230 V (L-L), 100 KVA Lighting Transformer-2 nos. 220V Lead Acid Battery complete with Battery Charging unit.-1 no. 6.6 kV 3 Phase, 3 Wire Switchboard 3A & 3B (Indoor ) Comprising of Incomer VCB, Buscoupler VCB and Outgoing VCBs/VCPs complete with metering and protection as required 415V,Aluminium Bus-duct as required. MCC at Substation-C Comprising of Incomer ACB, Buscoupler ACBs and Outgoing ACBs/MCCB/SFU/ Contactor as required. 6.6 kV and 415 V Capacitor with Automatic power factor correction of required capacity Banks for power factor improvement as required. Two number of single circuitof 6.6 kVOverhead line comprising of AAAC ’Wolf’ equivalent Conductor for power supply as required. Fire detection, Alarm and Protection system.
60D Substation-D(SS-4) Power receiving arrangment from substation C(SS-3) with Lightning Arrester and Isolator with earth switch as required. 6.6/0.433 kV, 500KVA Distribution transformer-2 nos. 6.6/0.230 V (L-L), 100 KVA Lighting Transformer-2 nos. 220V Lead Acid Battery complete with Battery Charging unit.-1 no. 6.6 kV 3 Phase, 3 Wire Switchboard 4A(Indoor ) Comprising of Incomer VCB, Buscoupler VCB and Outgoing VCBs/VCPs, Metering and protection as required 415V,Aluminium Bus-duct as required. MCC at Substation-DComprising of Incomer ACB, Buscoupler ACBs and Outgoing ACBs/MCCB/SFU/ Contactor as required. 6.6 kV and 415 V Capacitor with Automatic power factor correction of required capacity Banks for power factor improvement as required. Two number of single circuitof 6.6 kVOverhead line comprising of AAAC ’Wolf’ equivalent Conductor for power supply as required. Fire detection, Alarm and Protection system.
61E Substation-E(SS-5) 6.6/0.433 kV, 400 KVA Distribution transformer-2 nos. 6.6/0.230 V (L-L), 100 KVA Lighting Transformer-2 nos. 220V Lead Acid Battery complete with Battery Charging unit.-1 no. 6.6 kV 3 Phase, 3 Wire Switchboard 5A&5B(Indoor ) Comprising of Incomer VCB, Buscoupler VCB and Outgoing VCBs/VCPs, Metering and protection as required 415V,Aluminium Bus-duct as required. MCC at Substation-E Comprising of Incomer ACB, Buscoupler ACBs and Outgoing ACBs/MCCB/SFU/ Contactor as required. 6.6 kV and 415 V Capacitor with Automatic power factor correction of required capacity Banks for power factor improvement as required. Three number of single circuitof 6.6 kVOverhead line comprising of AAAC ’Wolf’ equivalent Conductor for power supply as required. Fire detection, Alarm and Protection system.
62FSubstation-F(SS-6) Power receiving arrangment from substation E(SS-5) with Lightning Arrester and Isolator with earth switch as required. 6.6/0.433 kV, 315 KVA Distribution transformer-2 nos. 6.6/0.230 V (L-L), 100 KVA Lighting Transformer-2 nos. 220V Lead Acid Battery complete with Battery Charging unit.-1 no. 6.6 kV 3 Phase, 3 Wire Switchboard 6A&6B(Indoor ) Comprising of Incomer VCB, Buscoupler VCB and Outgoing VCBs/VCPs, Metering and protection as required 415V,Aluminium Bus-duct as required. MCC at Substation-F Comprising of Incomer ACB, Buscoupler ACBs and Outgoing ACBs/MCCB/SFU/ Contactor as required. 6.6 kV and 415 V Capacitor with Automatic power factor correction of required capacity Banks for power factor improvement as required. Three number of single circuitof 6.6 kVOverhead line comprising of AAAC ’Wolf’ equivalent Conductor for power supply as required. Fire detection, Alarm and Protection system.
63G Substation-G(SS-7) Power receiving arrangment from substation F (SS 6) with Lightning Arrester and Isolator with earth switch as required. 6.6/0.433 kV, 400 KVA Distribution transformer-2 nos. 6.6/0.230 V (L-L), 100 KVA Lighting Transformer-2 nos. 220V Lead Acid Battery complete with Battery Charging unit.-1 no. 6.6 kV 3 Phase, 3 Wire Switchboard 7A &7B(Indoor ) Comprising of Incomer VCB, Buscoupler VCB and Outgoing VCBs/VCPs, Metering and protection as required 415V,Aluminium Bus-duct as required. MCC at Substation-G Comprising of Incomer ACB, Buscoupler ACBs and Outgoing ACBs/MCCB/SFU/ Contactor as required. 6.6 kV and 415 V Capacitor with Automatic power factor correction of required capacity Banks for power factor improvement as required. Fire detection, Alarm and Protection system.
64H Substation-H(SS-8) Power receiving arrangment from substationG(SS 7) with Lightning Arrester and Isolator with earth switch as required. 6.6/0.433 kV, 750KVA Distribution transformer-2 nos. 6.6/0.230 V (L-L), 100 KVA Lighting Transformer-2 nos. 220V Lead Acid Battery complete with Battery Charging unit.-1 no. 6.6 kV 3 Phase, 3 Wire Switchboard 8A & 8B (Indoor ) Comprising of Incomer VCB, Buscoupler VCB and Outgoing VCBs/VCPs, Metering and protection as required 415V,Aluminium Bus-duct as required. MCC at Substation Comprising of Incomer ACB, Buscoupler ACBs and Outgoing ACBs/MCCB/SFU/ Contactor as required. 6.6 kV and 415 V Capacitor with Automatic power factor correction of required capacity Banks for power factor improvement as required. 6.6 kV Double Circuit Overhead line comprising of AAAC ’Wolf’ equivalent Conductor for power supplyas required. Fire detection, Alarm and Protection system. Three number of single circuitof 6.6 kVOverhead line comprising of AAAC ’Wolf’ equivalent Conductor for power supply as required.
65Cables Power Cables Control & Signalling Cables Lighting Cables & wires Communication Cables
66Earthing Plant Equipment Earthing Structures Earthing Earthing for Lightning Protection Tranformer neutral Earthing
67Welding Sockets and8 number of Electical & Diesel Welding Set
68PLC System for Control & Automation,Interlocks, Signalling and instrumentation of entire CHP.
69Remote and sequence control equipment & Accessories
70Cable Trays, Cable Racks, Cable Trenches, Cable Voults etc.
71Illumination System and Luminaires, Lighting poles & Towers, Lighting DBs etc.
72DG sets for Emergency Power Supply.-8 nos.
73Exhaust Fan, Ceiling Fan, Air Conditioner, insulating Mats etc.
74Computers and Peripherals
75Communication System
76Miscellaneous Equipment
77C1. ERECTION, INSTALLATION & COMMISSIONING
781. Erection of mechanical equipment
792. Erection of electrical equipment
803. Erection of other plant and machining etc.
814. Trial run, and commissioning of the plant
82C2 . OTHERS ITEM
831. Drinking water system consisting of tanks, pipes, valves, taps etc.
842. Plantcleaning system
853. Any other item left out for completion of the project
86C3 . MAINTENANCE AND TRAINING
87Operation of the plant for five years as described in Tender document
88Maintenance of the plant for four years as described in Tender document
89Training of the employerpersonnel as per tender document
90Total impact of GST for the purpose of CTC
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail