Building Work Construction Of New Division Office Building (First Floor) At Barpali Irrigation Division Barpali.
Tender Value
59.86 Lakhs
Estimated cost
Bid Submission
31 Aug 2021
0 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Barpali → Odisha
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Building Work Construction Of New Division Office Building (First Floor) At Barpali Irrigation Division Barpali.
BOQ
| Sl. No. | Item Description |
| 1 | Rigid and smooth centering & shuttering for reinforced cement concrete works including false & dismantalling After casting and curing for spcified days clearing the debries clear from work site with with all leads lifts ,deliftsincluding cost,convyance and royality of all materials to site, T&P sundried etc, complete as per direction of Engineer-in-charge |
| 2 | Plinth Bend,Column & Footing |
| 3 | RCC Lintel (First Floor) |
| 4 | RCC Slab & Chajja (First Floor) |
| 5 | RCC Beam & Column (Ground Floor) |
| 6 | RCC Beam & Column (First Floor) |
| 7 | RCCStairs(First Floor) |
| 8 | Earthwork Excavation in foundation in hard soil or gravelly soil within initial lead of 50m and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per direction of the Engineer-in-charge. |
| 9 | Filling in foundation and plinth with sand of approved qaulity with all leads ,lifts ,delifts . Well watered and rammed including cost ,conveyance royality cess & all taxes of allmaterials T&P etc,complete as per direction of Engineer-in-Charge |
| 10 | Cement concrete (1:3:6) with 4cm size hard granite metal size form free weathered skinincluding cost ,conveyance royality cess & all taxes of allmaterials T&P etc,Ramming watering curing as per approval drwaing and the specification with all leads, Lifts Delifts etc,completed as directed by the Engineer-in -Charge |
| 11 | Reinforced Cement concrete (1:2:4) with 12mm size hard granite metal size form free weathered skinincluding cost ,conveyance royality cess & all taxes of allmaterials T&P etc,Ramming watering curing as per approval drwaing and the specification with all leads, Lifts Delifts etc,completed as directed by the Engineer-in -Charge. |
| 12 | Random rubble H.G. stone masonry in lime mortar (1:6) in foundation and plinth |
| 13 | Reinforced Cement concrete (1:1 1/2:3) with 20mm size hard granite metal size form free weathered skinincluding cost ,conveyance royality cess & all taxes of allmaterials T&P etc,Ramming watering curing as per approval drwaing and the specification with all leads, Lifts Delifts etc,completed as directed by the Engineer-in -Charge. |
| 14 | Ground Floor |
| 15 | First Floor |
| 16 | Supplying ,fitting and placing uncoated HYSD bar reinforcement complete as per drwaing anf technical speicification including cost,convyance and royality of all materials to site, T&P sundried etc, complete as per direction of Engineer-in-charge |
| 17 | Ground Floor |
| 18 | First Floor |
| 19 | Fly Ash Brick (25cmx12cmx 8Cm) having rushed strength not less tahn 75Kg/Cm2 with dimentional tolerance +_8 percent masonary in cement mortar (1:6) in super structureincluding cost,convyance and royality of all materials to site, T&P sundried etc, complete as per direction of Engineer-in-charge. |
| 20 | Ground Floor |
| 21 | First Floor |
| 22 | 12mm thick C.P. in CM(1:6) inside wall of the brick work masonary finish smooth including racking jointincluding cost,convyance and royality of all materials to site, T&P sundried etc, complete as per direction of Engineer-in-charge. |
| 23 | Ground Floor |
| 24 | First Floor |
| 25 | 16mm thick C.P. in CM(1:6) inside wall of the brick work masonary finish smooth including racking jointincluding cost,convyance and royality of all materials to site, T&P sundried etc, complete as per direction of Engineer-in-charge. |
| 26 | Ground Floor |
| 27 | First Floor |
| 28 | 2.5cm thick gradingconcrete (1:2:2) on roof slab with 6mm size hard granite chips for new work, |
| 29 | Fixing Vetrified tiles(Ivory) of 600mm x600mm size in floor, treads or steps and landing on 25mm thick bed of cement mortar( 1:1) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing etc.completed.(First Floor) |
| 30 | Supplying, fitting & fixing of Ceramictiles in dadoes, skirting and risers of steps of size 300mmx 300mm of approved make confirming to IS:13755 laid on 12 mm thick cement mortar (1:3) (1 cement : 3 course sand) jointed with slurry mixed with pigment to match the shades of the tiles etc. complete including cost of all materials, labour T&P etc. required for the work all complete as per direction of the Engineer-in-charge (First Floor) |
| 31 | Dressed seasoned Sal wood work framed and fixed( wrought and put up ) in Choukaths of Door frame ,Windows and beam |
| 32 | Supplying, fitting, fixing up window (sliding type) made up aluminum Section 151-154,151-155as windows frame, section No. 151-155,151-153 and 151-167 as shutter frame with 5mm thick black glass as panel fitted with rubber beading including locking arrangement including all fitting including cost of materials all taxes labour, T&P etc. complete as per direction of Engineer-in-charge. |
| 33 | Supplying, fitting and fixing of stainless steel of 304 grade in hand railing using 50 mm dia of 2 mm thick circular pipe with Balustrade of size 32 mm x 32mm x 2mm @ 0.90 mtr C/C and stainless square pipe bracing of size 32mmx32mmx2mm in 3rows in stair case as per approved design and specification, buffing, polishing etc. with the cost, conveyance taxses of all material, cost of all labour etc. complete in all respect. |
| 34 | Proding fitting & fixing of false ceilling with Aluminium anodised T Section No. 3215 with 2\"-0\" center to center, L section No. 1705 upto 15 micron on 4 walls to be fixed by means of steel screw and PVC plug and the Aluminium grid 2\"-0\"x2\"-0\" suspended from ceilling etc. complete |
| 35 | Finishing wall with water proofing cement paint of approved shade on new work two coat to give an even shade excluding cost of paint. |
| 36 | Ground Floor |
| 37 | First Floor |
| 38 | Painting two coats with approved enamel paints of approved colour, shade over a coat ofprimer including sand papering, polishing the surface, cost, conveyances, taxes of all materials and cost of all labour with T&P etc, complete as per specification & direction of Engineer-in-charge. (Iron work) |
| 39 | Ground Floor |
| 40 | First Floor |
| 41 | Painting two coats with approved enamel paints of approved colour, shade over a coat ofprimer including sand papering, polishing the surface, cost, conveyances, taxes of all materials and cost of all labour with T&P etc, complete as per specification & direction of Engineer-in-charge. (Wood work) |
| 42 | First Floor |
| 43 | Finishing wall surface with Cement based wall putty (water based) of approved make and finished smooth & even surface to receive painting including cost of scaffolding etc. with cost of all materials, labour T&P etc. complete. (First Floor) |
| 44 | Wall painting 2 coats with plastic emulsion paint of approved shade on new work to give an even shade including cost of paint etc complete.(First Floor) |
| 45 | Supplying of M.S.Grills, collapsible gates made out of M.S. Angle frame, M.S. Flat, Sheetetc of approved section & design, electrically welded properly with all necessary locking arrengement, and 1 coat red oxide primer including cost of all materials, labour T&P, carriage of materials to site etc. complete. (Ground floor & First Floor) |
| 46 | 25mm thick piasal wood or local teak woodfalse pannel shutter complete with Iron fittings & wooden hinges cleats etc . fixd in position including all labour charges but excluding the cost of iron fittings. |
| 47 | Filling in foundation and plinth with earth of approved qaulity with all leads ,lifts ,delifts . Well watered and rammed including cost ,conveyance royality cess & all taxes of allmaterials T&P etc,complete as per direction of Engineer-in-Charge |
| 48 | Supplying ,Fitting and fixing PVC Door including all accessories etc,complete as per direction of EIC |
AI Tender Summary
Tender Timeline
Aug 14, 2021
11:30 IST
Tender Published
Tender notice published.
CompletedAug 31, 2021
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedSep 02, 2021
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents