Heavy Industries and Public Enterprises Boards / Undertakings / PSU Closing in 0 days TDR #28856665

Hiring Of Services For Shafting Engineering Jobs For Y 12652 Y 12653 And Y 12654 Of P17a Ships

Issued by Boards / Undertakings / PSU · MDL, Mumbai, Maharashtra
Tender Value
Ref. Documents
Estimated cost
Bid Submission
06 Sep 2021
0 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
MDL, Mumbai → Maharashtra
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Hiring Of Services For Shafting Engineering Jobs For Y 12652 Y 12653 And Y 12654 Of P17a Ships

BOQ

Name of Work: Hiring of services for Shafting Engineering Jobs for Y-12652, Y-12653 & Y-12654 of P17A ships.
Sl. No. Item Description
1Preliminary LoS (Line of Sight) (P&S) Re confirm the ‘Ship Centreline’, ‘Ship Baseline’ and ‘Longitudinal Positions’. For YD-12652
2Measuring and marking (P&S)Measure and mark the longitudinal and transverse position of the respective reference points on the Shaft Line Theoretical Axis for the following item• Propeller Centre• A-Bracket• P-Bracket• Stern Tube•Thrust Block•Gear Box• Gas Turbine• Diesel EngineFor YD-12652
3First Line of Sight (LoS) (P&S)Establish Initial Line of Sight using Laser or optical telescope, with reference to target station of Propeller centre and at FR 49.5 target station. For YD-12652
4Gear box seat installation in Diesel Engine room Compartment (P&S)Installation of gear box foundation (seat) with reference to the line of sight and as per mdl drawing , OEM and MSI documentsFor YD-12652
5Thrust block seat installation in AMR-I compartment (P&S)Installation of Thrust blockFoundation(Seat) with reference to the Line of Sight and as per MDL drawing , OEM and MSI documentsFor YD-12652
6Gas Turbine seat installation in GTR compartment (P&S)Installation of Gas TurbineFoundation(Seat) with reference to the Line of Sight and as per MDL drawing , OEM and MSI documentsFor YD-12652
7Diesel Engine seat installation in DER compartment (P&S)Installation of Diesel EngineFoundation(Seat) with reference to the Line of Sight and as per MDL drawing , OEM and MSI documentsFor YD-12652
8Re-confirmation of Propulsion Equipment Foundation seat before and after welding (P&S)Second line of sight to be carried out to reconfirm the position of Propulsion equipment Foundation seatbefore and after weldingFor YD-12652
9Gear box foundation drilling and Shipping –inn Opening and Equipment lowering and securing (P&S)Shipping –inn Opening and Equipment lowering of propulsion related equipment such as CPP & Shafting items, Gear box, Diesel Engine, Gas Turbine and after securing of the same.For YD-12652
10Re-confirmation of all Shafting Target Points(P&S)Second line of sight to be carried out to reconfirm the effect of welding and shipping in of equipment.For YD-12652
11Conduct LoS (Line of Sight)with Stern Drop Measurement and errection of temporary shaft support (P&S)Re confirms the ‘Ship Centreline’, ‘Ship Baseline’ and ‘Longitudinal Positions’. For measurement of Stern Drop.Erection of temporary Shaft supportsPosition temporary supports and align on LoS as per MSI document.For YD-12652
12Initial Positioning/ Fit Up of Stern tube, A- Bracket, P-BracketInitial Positioning/Fit Up of ‘Stern Tube’, ‘A-Bracket’ and ‘P-Bracket’ as per the ‘Line of Sight’ after Stern-drop measurement and closing of all Shipping-in openingFor YD-12652
13Control welding, NDT checksand thermal stress relievingof Stern tube, A- Bracket, P-Bracket (P&S)Controlled welding and thermal stress relievingof Stern tube, A- Bracket, P-Bracket and intermittent readings to be monitored to avoid welding distortionFor YD-12652
14Line of Sightusing Optical / Laser (P&S)Line of sight is done to check the position of “A” Bracket, Stern Tube, “P” bracket and Temporary supports and Equipment with respect to shaft lineFor YD-12652
15Measurementof Chock height Measurement and analysis of Chock heightfor Gear box, Thrust block, Stern tube bearings, P-Bracket bearings, A-Bracket bearings and finalisation of Final LoSFor YD-12652
16FinalLoS (P&S)Final LoSforBearings alignment of A-Bkt, P-Bkt, Stern tube, Thrust block, Gear boxFor YD-12652
17Resin Chocking of Bearings and bolting of bearing housing (P&S)Resin chockingis for A-Bracket, P-Bracket, Stern tube bearing housing and Shaft sighting for reconfirming of LoS, drilling, tapping and boltingFor YD-12652
18Embarkation Outboard Shafting and InstallationEmbarkation of Stern tube shaft, deep sea seal, OKF Flange coupling,Emergency Pitch Setting Device (EPSD), OKC (Sleeve) coupling, Propeller shaftFor YD-12652
19Alignment and Installation of OKC sleeve coupling, EPSD and OKF flange coupling,Alignment and Installation of OKC sleeve coupling, EPSD and OKF flange coupling,For YD-12652
20Measurement of Bearing clearances (P&S)Bearing clearance and Poker Gauge Readings A-Bracket, P-Bracket, Stern tube bearingsFor YD-12652
21Installation of Deep sea seal and Testing (P&S)Installation of Deep sea seal, Air pressure test andHydro test and run-in alignmentFor YD-12652
22Installation of ‘Rope Guard’, ’Net Cutter, and ‘Faring Cones’ and shaft turning device. (P&S)Installation of ‘Rope Guard’, ’Net Cutter, and ‘Faring Cones’ and shaft turning deviceFor YD-12652
23Gap and Sag alignment (P&S)Gap and Sag alignment of TB Aft Flange wrt OKF Coupling, TB Fwd Flange wrt Intermediate Shaft Aft Flange, Intermediate Shaft Fwd Flange wrt GB Output Shaft FlangeFor YD-12652
24Setting the size ofDistance Ring (P&S)Measurement of final sizeofDistance Ring and to be machinedFor YD-12652
25Gear box tooth contact checks (P&S)MRG Tooth Contact Check 1: With ‘MRG Output Shaft’ disconnected from ‘IntermediateShaft’2. With ‘MRG Output Shaft’ connected from ‘IntermediateShaft’For YD-12652
26Final shaft coupling connection (P&S)Final connection of Shaft line to TB and MRGFor YD-12652
27Jack load test of Gear box, Thrust bearing and stern tube shaft (P&S)Jack load test of Gear box, Thrust bearing and stern tube shaft when MRG on Jack screwsFor YD-12652
28Main reduction gear Chock fasting (P&S)Gearbox base to be chock fasted a per MSI and OEM recommendation after satisfactoryand acceptance of OEMFor YD-12652
29Thrust bearing chocking (P&S)Final chocking of TBFor YD-12652
30Final Jack load checks and MRG tooth contact checks (P&S)Final jack load checks and MRG Teeth Contact Check 3 (Final): With ‘MRG Output Shaft’ connected with‘Intermediate Shaft’ and Chocking to FoundationFor YD-12652
31Alignment and Installationof Gas Turbine (P&S)Alignment and Installationof Gas Turbine For YD-12652
32Alignment and Installationof Diesel Engine (P&S)Alignment and InstallationofMain Diesel EngineFor YD-12652
33Installation of Torsion meter, Oil distribution box, Earthing device. (P&S)Balance Installation Activities: including ‘Shaft Brake’, ‘Bulkhead Seal’, ‘Torsion Meter’, ‘Earthing device’ and ‘CPP Oil Distribution Box’.For YD-12652
34Bearing Jack load test after Propeller blade installation (P&S)Bearing Jack load test after Propeller blade installation and feathering checks of CPP SystemFor YD-12652
35Installation of Bulkhead Seals (P&S)Installation of Bulkhead Seals at Fr.#56 & Fr.#65For YD-12652
36Installation of Steering Gear system (P&S)Marking and structural opening as per reference MDL drawing for installation and welding of Rudder Cartridge with Hull plate. Installation of Rudder stock, Hydraulic power pack, tiller, and final alignmentFor YD-12652
37Installation of Steering Gear RamfoundationSeat and Ram base beddingInstallation of Ram Foundation seat bedding and Carryout separatelyRam base bedding.For YD-12652
38Alignment and calibration ofRudder with Tiller assembly arrangement.Alignment and calibration ofRudder with Tiller arrangementFor YD-12652
39Preliminary LoS (Line of Sight) (P&S) Re confirm the ‘Ship Centreline’, ‘Ship Baseline’ and ‘Longitudinal Positions’. For YD-12653
40Measuring and marking (P&S)Measure and mark the longitudinal and transverse position of the respective reference points on the Shaft Line Theoretical Axis for the following item• Propeller Centre• A-Bracket• P-Bracket• Stern Tube•Thrust Block•Gear Box• Gas Turbine• Diesel EngineFor YD-12653
41First Line of Sight (LoS) (P&S)Establish Initial Line of Sight using Laser or optical telescope, with reference to target station of Propeller centre and at FR 49.5 target station. For YD-12653
42Gear box seat installation in Diesel Engine room Compartment (P&S)Installation of gear box foundation (seat) with reference to the line of sight and as per mdl drawing , OEM and MSI documentsFor YD-12653
43Thrust block seat installation in AMR-I compartment (P&S)Installation of Thrust blockFoundation(Seat) with reference to the Line of Sight and as per MDL drawing , OEM and MSI documentsFor YD-12653
44Gas Turbine seat installation in GTR compartment (P&S)Installation of Gas TurbineFoundation(Seat) with reference to the Line of Sight and as per MDL drawing , OEM and MSI documentsFor YD-12653
45Diesel Engine seat installation in DER compartment (P&S)Installation of Diesel EngineFoundation(Seat) with reference to the Line of Sight and as per MDL drawing , OEM and MSI documentsFor YD-12653
46Re-confirmation of Propulsion Equipment Foundation seat before and after welding (P&S)Second line of sight to be carried out to reconfirm the position of Propulsion equipment Foundation seatbefore and after weldingFor YD-12653
47Gear box foundation drilling and Shipping –inn Opening and Equipment lowering and securing (P&S)Shipping –inn Opening and Equipment lowering of propulsion related equipment such as CPP & Shafting items, Gear box, Diesel Engine, Gas Turbine and after securing of the same.For YD-12653
48Re-confirmation of all Shafting Target Points(P&S)Second line of sight to be carried out to reconfirm the effect of welding and shipping in of equipment.For YD-12653
49Conduct LoS (Line of Sight)with Stern Drop Measurement and errection of temporary shaft support (P&S)Re confirms the ‘Ship Centreline’, ‘Ship Baseline’ and ‘Longitudinal Positions’. For measurement of Stern Drop.Erection of temporary Shaft supportsPosition temporary supports and align on LoS as per MSI document.For YD-12653
50Initial Positioning/ Fit Up of Stern tube, A- Bracket, P-BracketInitial Positioning/Fit Up of ‘Stern Tube’, ‘A-Bracket’ and ‘P-Bracket’ as per the ‘Line of Sight’ after Stern-drop measurement and closing of all Shipping-in openingFor YD-12653
51Control welding, NDT checksand thermal stress relievingof Stern tube, A- Bracket, P-Bracket (P&S)Controlled welding and thermal stress relievingof Stern tube, A- Bracket, P-Bracket and intermittent readings to be monitored to avoid welding distortionFor YD-12653
52Line of Sightusing Optical / Laser (P&S)Line of sight is done to check the position of “A” Bracket, Stern Tube, “P” bracket and Temporary supports and Equipment with respect to shaft lineFor YD-12653
53Measurementof Chock height Measurement and analysis of Chock heightfor Gear box, Thrust block, Stern tube bearings, P-Bracket bearings, A-Bracket bearings and finalisation of Final LoSFor YD-12653
54FinalLoS (P&S)Final LoSforBearings alignment of A-Bkt, P-Bkt, Stern tube, Thrust block, Gear boxFor YD-12653
55Resin Chocking of Bearings and bolting of bearing housing (P&S)Resin chockingis for A-Bracket, P-Bracket, Stern tube bearing housing and Shaft sighting for reconfirming of LoS, drilling, tapping and boltingFor YD-12653
56Embarkation Outboard Shafting and InstallationEmbarkation of Stern tube shaft, deep sea seal, OKF Flange coupling,Emergency Pitch Setting Device (EPSD), OKC (Sleeve) coupling, Propeller shaftFor YD-12653
57Alignment and Installation of OKC sleeve coupling, EPSD and OKF flange coupling,Alignment and Installation of OKC sleeve coupling, EPSD and OKF flange coupling,For YD-12653
58Measurement of Bearing clearances (P&S)Bearing clearance and Poker Gauge Readings A-Bracket, P-Bracket, Stern tube bearingsFor YD-12653
59Installation of Deep sea seal and Testing (P&S)Installation of Deep sea seal, Air pressure test andHydro test and run-in alignmentFor YD-12653
60Installation of ‘Rope Guard’, ’Net Cutter, and ‘Faring Cones’ and shaft turning device. (P&S)Installation of ‘Rope Guard’, ’Net Cutter, and ‘Faring Cones’ and shaft turning deviceFor YD-12653
61Gap and Sag alignment (P&S)Gap and Sag alignment of TB Aft Flange wrt OKF Coupling, TB Fwd Flange wrt Intermediate Shaft Aft Flange, Intermediate Shaft Fwd Flange wrt GB Output Shaft FlangeFor YD-12653
62Setting the size ofDistance Ring (P&S)Measurement of final sizeofDistance Ring and to be machinedFor YD-12653
63Gear box tooth contact checks (P&S)MRG Tooth Contact Check 1: With ‘MRG Output Shaft’ disconnected from ‘IntermediateShaft’2. With ‘MRG Output Shaft’ connected from ‘IntermediateShaft’For YD-12653
64Final shaft coupling connection (P&S)Final connection of Shaft line to TB and MRGFor YD-12653
65Jack load test of Gear box, Thrust bearing and stern tube shaft (P&S)Jack load test of Gear box, Thrust bearing and stern tube shaft when MRG on Jack screwsFor YD-12653
66Main reduction gear Chock fasting (P&S)Gearbox base to be chock fasted a per MSI and OEM recommendation after satisfactoryand acceptance of OEMFor YD-12653
67Thrust bearing chocking (P&S)Final chocking of TBFor YD-12653
68Final Jack load checks and MRG tooth contact checks (P&S)Final jack load checks and MRG Teeth Contact Check 3 (Final): With ‘MRG Output Shaft’ connected with‘Intermediate Shaft’ and Chocking to FoundationFor YD-12653
69Alignment and Installationof Gas Turbine (P&S)Alignment and Installationof Gas Turbine For YD-12653
70Alignment and Installationof Diesel Engine (P&S)Alignment and InstallationofMain Diesel EngineFor YD-12653
71Installation of Torsion meter, Oil distribution box, Earthing device. (P&S)Balance Installation Activities: including ‘Shaft Brake’, ‘Bulkhead Seal’, ‘Torsion Meter’, ‘Earthing device’ and ‘CPP Oil Distribution Box’.For YD-12653
72Bearing Jack load test after Propeller blade installation (P&S)Bearing Jack load test after Propeller blade installation and feathering checks of CPP SystemFor YD-12653
73Installation of Bulkhead Seals (P&S)Installation of Bulkhead Seals at Fr.#56 & Fr.#65For YD-12653
74Installation of Steering Gear system (P&S)Marking and structural opening as per reference MDL drawing for installation and welding of Rudder Cartridge with Hull plate. Installation of Rudder stock, Hydraulic power pack, tiller, and final alignmentFor YD-12653
75Installation of Steering Gear RamfoundationSeat and Ram base beddingInstallation of Ram Foundation seat bedding and Carryout separatelyRam base bedding.For YD-12653
76Alignment and calibration ofRudder with Tiller assembly arrangement.Alignment and calibration ofRudder with Tiller arrangementFor YD-12653
77Preliminary LoS (Line of Sight) (P&S) Re confirm the ‘Ship Centreline’, ‘Ship Baseline’ and ‘Longitudinal Positions’. For YD-12654
78Measuring and marking (P&S)Measure and mark the longitudinal and transverse position of the respective reference points on the Shaft Line Theoretical Axis for the following item• Propeller Centre• A-Bracket• P-Bracket• Stern Tube•Thrust Block•Gear Box• Gas Turbine• Diesel EngineFor YD-12654
79First Line of Sight (LoS) (P&S)Establish Initial Line of Sight using Laser or optical telescope, with reference to target station of Propeller centre and at FR 49.5 target station. For YD-12654
80Gear box seat installation in Diesel Engine room Compartment (P&S)Installation of gear box foundation (seat) with reference to the line of sight and as per mdl drawing , OEM and MSI documentsFor YD-12654
81Thrust block seat installation in AMR-I compartment (P&S)Installation of Thrust blockFoundation(Seat) with reference to the Line of Sight and as per MDL drawing , OEM and MSI documentsFor YD-12654
82Gas Turbine seat installation in GTR compartment (P&S)Installation of Gas TurbineFoundation(Seat) with reference to the Line of Sight and as per MDL drawing , OEM and MSI documentsFor YD-12654
83Diesel Engine seat installation in DER compartment (P&S)Installation of Diesel EngineFoundation(Seat) with reference to the Line of Sight and as per MDL drawing , OEM and MSI documentsFor YD-12654
84Re-confirmation of Propulsion Equipment Foundation seat before and after welding (P&S)Second line of sight to be carried out to reconfirm the position of Propulsion equipment Foundation seatbefore and after weldingFor YD-12654
85Gear box foundation drilling and Shipping –inn Opening and Equipment lowering and securing (P&S)Shipping –inn Opening and Equipment lowering of propulsion related equipment such as CPP & Shafting items, Gear box, Diesel Engine, Gas Turbine and after securing of the same.For YD-12654
86Re-confirmation of all Shafting Target Points(P&S)Second line of sight to be carried out to reconfirm the effect of welding and shipping in of equipment.For YD-12654
87Conduct LoS (Line of Sight)with Stern Drop Measurement and errection of temporary shaft support (P&S)Re confirms the ‘Ship Centreline’, ‘Ship Baseline’ and ‘Longitudinal Positions’. For measurement of Stern Drop.Erection of temporary Shaft supportsPosition temporary supports and align on LoS as per MSI document.For YD-12654
88Initial Positioning/ Fit Up of Stern tube, A- Bracket, P-BracketInitial Positioning/Fit Up of ‘Stern Tube’, ‘A-Bracket’ and ‘P-Bracket’ as per the ‘Line of Sight’ after Stern-drop measurement and closing of all Shipping-in openingFor YD-12654
89Control welding, NDT checksand thermal stress relievingof Stern tube, A- Bracket, P-Bracket (P&S)Controlled welding and thermal stress relievingof Stern tube, A- Bracket, P-Bracket and intermittent readings to be monitored to avoid welding distortionFor YD-12654
90Line of Sightusing Optical / Laser (P&S)Line of sight is done to check the position of “A” Bracket, Stern Tube, “P” bracket and Temporary supports and Equipment with respect to shaft lineFor YD-12654
91Measurementof Chock height Measurement and analysis of Chock heightfor Gear box, Thrust block, Stern tube bearings, P-Bracket bearings, A-Bracket bearings and finalisation of Final LoSFor YD-12654
92FinalLoS (P&S)Final LoSforBearings alignment of A-Bkt, P-Bkt, Stern tube, Thrust block, Gear boxFor YD-12654
93Resin Chocking of Bearings and bolting of bearing housing (P&S)Resin chockingis for A-Bracket, P-Bracket, Stern tube bearing housing and Shaft sighting for reconfirming of LoS, drilling, tapping and boltingFor YD-12654
94Embarkation Outboard Shafting and InstallationEmbarkation of Stern tube shaft, deep sea seal, OKF Flange coupling,Emergency Pitch Setting Device (EPSD), OKC (Sleeve) coupling, Propeller shaftFor YD-12654
95Alignment and Installation of OKC sleeve coupling, EPSD and OKF flange coupling,Alignment and Installation of OKC sleeve coupling, EPSD and OKF flange coupling,For YD-12654
96Measurement of Bearing clearances (P&S)Bearing clearance and Poker Gauge Readings A-Bracket, P-Bracket, Stern tube bearingsFor YD-12654
97Installation of Deep sea seal and Testing (P&S)Installation of Deep sea seal, Air pressure test andHydro test and run-in alignmentFor YD-12654
98Installation of ‘Rope Guard’, ’Net Cutter, and ‘Faring Cones’ and shaft turning device. (P&S)Installation of ‘Rope Guard’, ’Net Cutter, and ‘Faring Cones’ and shaft turning deviceFor YD-12654
99Gap and Sag alignment (P&S)Gap and Sag alignment of TB Aft Flange wrt OKF Coupling, TB Fwd Flange wrt Intermediate Shaft Aft Flange, Intermediate Shaft Fwd Flange wrt GB Output Shaft FlangeFor YD-12654
100Setting the size ofDistance Ring (P&S)Measurement of final sizeofDistance Ring and to be machinedFor YD-12654
101Gear box tooth contact checks (P&S)MRG Tooth Contact Check 1: With ‘MRG Output Shaft’ disconnected from ‘IntermediateShaft’2. With ‘MRG Output Shaft’ connected from ‘IntermediateShaft’For YD-12654
102Final shaft coupling connection (P&S)Final connection of Shaft line to TB and MRGFor YD-12654
103Jack load test of Gear box, Thrust bearing and stern tube shaft (P&S)Jack load test of Gear box, Thrust bearing and stern tube shaft when MRG on Jack screwsFor YD-12654
104Main reduction gear Chock fasting (P&S)Gearbox base to be chock fasted a per MSI and OEM recommendation after satisfactoryand acceptance of OEMFor YD-12654
105Thrust bearing chocking (P&S)Final chocking of TBFor YD-12654
106Final Jack load checks and MRG tooth contact checks (P&S)Final jack load checks and MRG Teeth Contact Check 3 (Final): With ‘MRG Output Shaft’ connected with‘Intermediate Shaft’ and Chocking to FoundationFor YD-12654
107Alignment and Installationof Gas Turbine (P&S)Alignment and Installationof Gas Turbine For YD-12654
108Alignment and Installationof Diesel Engine (P&S)Alignment and InstallationofMain Diesel EngineFor YD-12654
109Installation of Torsion meter, Oil distribution box, Earthing device. (P&S)Balance Installation Activities: including ‘Shaft Brake’, ‘Bulkhead Seal’, ‘Torsion Meter’, ‘Earthing device’ and ‘CPP Oil Distribution Box’.For YD-12654
110Bearing Jack load test after Propeller blade installation (P&S)Bearing Jack load test after Propeller blade installation and feathering checks of CPP SystemFor YD-12654
111Installation of Bulkhead Seals (P&S)Installation of Bulkhead Seals at Fr.#56 & Fr.#65For YD-12654
112Installation of Steering Gear system (P&S)Marking and structural opening as per reference MDL drawing for installation and welding of Rudder Cartridge with Hull plate. Installation of Rudder stock, Hydraulic power pack, tiller, and final alignmentFor YD-12654
113Installation of Steering Gear RamfoundationSeat and Ram base beddingInstallation of Ram Foundation seat bedding and Carryout separatelyRam base bedding.For YD-12654
114Alignment and calibration ofRudder with Tiller assembly arrangement.Alignment and calibration ofRudder with Tiller arrangementFor YD-12654

AI Tender Summary

OUR REF NO 28856665
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE Ref. Documents
LAST DATE 06-09-2021
Authority
Authority Name Mazagon Dock Limited
Work Description Hiring Of Services For Shafting Engineering Jobs For Y 12652 Y 12653 And Y 12654 Of P17a Ships
Basic Detail
Tender No 8000001026
Bidding Type Tender
Location
City MDL, Mumbai
State Maharashtra
Key Dates
Publish Date 13 Aug 2021
Submission Date 06 Sep 2021
Open Date 07 Sep 2021
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD Ref. Documents
Exemption Not Available
Document List
b35fedf8-4432-4eed-b386-90df69fdae6c.html
Bidder_contact_details.xls
BOQ_96317.xls
Tender8000001026.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 13, 2021
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 06, 2021
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Sep 07, 2021

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

b35fedf8-4432-4eed-b386-90df69fdae6c.html

xls

Bidder_contact_details.xls

xls

BOQ_96317.xls

pdf

Tender8000001026.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders