Hiring Of Services For Shafting Engineering Jobs For Y 12652 Y 12653 And Y 12654 Of P17a Ships
Tender Value
Ref. Documents
Estimated cost
Bid Submission
06 Sep 2021
0 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
MDL, Mumbai → Maharashtra
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Hiring Of Services For Shafting Engineering Jobs For Y 12652 Y 12653 And Y 12654 Of P17a Ships
BOQ
| Sl. No. | Item Description |
| 1 | Preliminary LoS (Line of Sight) (P&S) Re confirm the ‘Ship Centreline’, ‘Ship Baseline’ and ‘Longitudinal Positions’. For YD-12652 |
| 2 | Measuring and marking (P&S)Measure and mark the longitudinal and transverse position of the respective reference points on the Shaft Line Theoretical Axis for the following item• Propeller Centre• A-Bracket• P-Bracket• Stern Tube•Thrust Block•Gear Box• Gas Turbine• Diesel EngineFor YD-12652 |
| 3 | First Line of Sight (LoS) (P&S)Establish Initial Line of Sight using Laser or optical telescope, with reference to target station of Propeller centre and at FR 49.5 target station. For YD-12652 |
| 4 | Gear box seat installation in Diesel Engine room Compartment (P&S)Installation of gear box foundation (seat) with reference to the line of sight and as per mdl drawing , OEM and MSI documentsFor YD-12652 |
| 5 | Thrust block seat installation in AMR-I compartment (P&S)Installation of Thrust blockFoundation(Seat) with reference to the Line of Sight and as per MDL drawing , OEM and MSI documentsFor YD-12652 |
| 6 | Gas Turbine seat installation in GTR compartment (P&S)Installation of Gas TurbineFoundation(Seat) with reference to the Line of Sight and as per MDL drawing , OEM and MSI documentsFor YD-12652 |
| 7 | Diesel Engine seat installation in DER compartment (P&S)Installation of Diesel EngineFoundation(Seat) with reference to the Line of Sight and as per MDL drawing , OEM and MSI documentsFor YD-12652 |
| 8 | Re-confirmation of Propulsion Equipment Foundation seat before and after welding (P&S)Second line of sight to be carried out to reconfirm the position of Propulsion equipment Foundation seatbefore and after weldingFor YD-12652 |
| 9 | Gear box foundation drilling and Shipping –inn Opening and Equipment lowering and securing (P&S)Shipping –inn Opening and Equipment lowering of propulsion related equipment such as CPP & Shafting items, Gear box, Diesel Engine, Gas Turbine and after securing of the same.For YD-12652 |
| 10 | Re-confirmation of all Shafting Target Points(P&S)Second line of sight to be carried out to reconfirm the effect of welding and shipping in of equipment.For YD-12652 |
| 11 | Conduct LoS (Line of Sight)with Stern Drop Measurement and errection of temporary shaft support (P&S)Re confirms the ‘Ship Centreline’, ‘Ship Baseline’ and ‘Longitudinal Positions’. For measurement of Stern Drop.Erection of temporary Shaft supportsPosition temporary supports and align on LoS as per MSI document.For YD-12652 |
| 12 | Initial Positioning/ Fit Up of Stern tube, A- Bracket, P-BracketInitial Positioning/Fit Up of ‘Stern Tube’, ‘A-Bracket’ and ‘P-Bracket’ as per the ‘Line of Sight’ after Stern-drop measurement and closing of all Shipping-in openingFor YD-12652 |
| 13 | Control welding, NDT checksand thermal stress relievingof Stern tube, A- Bracket, P-Bracket (P&S)Controlled welding and thermal stress relievingof Stern tube, A- Bracket, P-Bracket and intermittent readings to be monitored to avoid welding distortionFor YD-12652 |
| 14 | Line of Sightusing Optical / Laser (P&S)Line of sight is done to check the position of “A” Bracket, Stern Tube, “P” bracket and Temporary supports and Equipment with respect to shaft lineFor YD-12652 |
| 15 | Measurementof Chock height Measurement and analysis of Chock heightfor Gear box, Thrust block, Stern tube bearings, P-Bracket bearings, A-Bracket bearings and finalisation of Final LoSFor YD-12652 |
| 16 | FinalLoS (P&S)Final LoSforBearings alignment of A-Bkt, P-Bkt, Stern tube, Thrust block, Gear boxFor YD-12652 |
| 17 | Resin Chocking of Bearings and bolting of bearing housing (P&S)Resin chockingis for A-Bracket, P-Bracket, Stern tube bearing housing and Shaft sighting for reconfirming of LoS, drilling, tapping and boltingFor YD-12652 |
| 18 | Embarkation Outboard Shafting and InstallationEmbarkation of Stern tube shaft, deep sea seal, OKF Flange coupling,Emergency Pitch Setting Device (EPSD), OKC (Sleeve) coupling, Propeller shaftFor YD-12652 |
| 19 | Alignment and Installation of OKC sleeve coupling, EPSD and OKF flange coupling,Alignment and Installation of OKC sleeve coupling, EPSD and OKF flange coupling,For YD-12652 |
| 20 | Measurement of Bearing clearances (P&S)Bearing clearance and Poker Gauge Readings A-Bracket, P-Bracket, Stern tube bearingsFor YD-12652 |
| 21 | Installation of Deep sea seal and Testing (P&S)Installation of Deep sea seal, Air pressure test andHydro test and run-in alignmentFor YD-12652 |
| 22 | Installation of ‘Rope Guard’, ’Net Cutter, and ‘Faring Cones’ and shaft turning device. (P&S)Installation of ‘Rope Guard’, ’Net Cutter, and ‘Faring Cones’ and shaft turning deviceFor YD-12652 |
| 23 | Gap and Sag alignment (P&S)Gap and Sag alignment of TB Aft Flange wrt OKF Coupling, TB Fwd Flange wrt Intermediate Shaft Aft Flange, Intermediate Shaft Fwd Flange wrt GB Output Shaft FlangeFor YD-12652 |
| 24 | Setting the size ofDistance Ring (P&S)Measurement of final sizeofDistance Ring and to be machinedFor YD-12652 |
| 25 | Gear box tooth contact checks (P&S)MRG Tooth Contact Check 1: With ‘MRG Output Shaft’ disconnected from ‘IntermediateShaft’2. With ‘MRG Output Shaft’ connected from ‘IntermediateShaft’For YD-12652 |
| 26 | Final shaft coupling connection (P&S)Final connection of Shaft line to TB and MRGFor YD-12652 |
| 27 | Jack load test of Gear box, Thrust bearing and stern tube shaft (P&S)Jack load test of Gear box, Thrust bearing and stern tube shaft when MRG on Jack screwsFor YD-12652 |
| 28 | Main reduction gear Chock fasting (P&S)Gearbox base to be chock fasted a per MSI and OEM recommendation after satisfactoryand acceptance of OEMFor YD-12652 |
| 29 | Thrust bearing chocking (P&S)Final chocking of TBFor YD-12652 |
| 30 | Final Jack load checks and MRG tooth contact checks (P&S)Final jack load checks and MRG Teeth Contact Check 3 (Final): With ‘MRG Output Shaft’ connected with‘Intermediate Shaft’ and Chocking to FoundationFor YD-12652 |
| 31 | Alignment and Installationof Gas Turbine (P&S)Alignment and Installationof Gas Turbine For YD-12652 |
| 32 | Alignment and Installationof Diesel Engine (P&S)Alignment and InstallationofMain Diesel EngineFor YD-12652 |
| 33 | Installation of Torsion meter, Oil distribution box, Earthing device. (P&S)Balance Installation Activities: including ‘Shaft Brake’, ‘Bulkhead Seal’, ‘Torsion Meter’, ‘Earthing device’ and ‘CPP Oil Distribution Box’.For YD-12652 |
| 34 | Bearing Jack load test after Propeller blade installation (P&S)Bearing Jack load test after Propeller blade installation and feathering checks of CPP SystemFor YD-12652 |
| 35 | Installation of Bulkhead Seals (P&S)Installation of Bulkhead Seals at Fr.#56 & Fr.#65For YD-12652 |
| 36 | Installation of Steering Gear system (P&S)Marking and structural opening as per reference MDL drawing for installation and welding of Rudder Cartridge with Hull plate. Installation of Rudder stock, Hydraulic power pack, tiller, and final alignmentFor YD-12652 |
| 37 | Installation of Steering Gear RamfoundationSeat and Ram base beddingInstallation of Ram Foundation seat bedding and Carryout separatelyRam base bedding.For YD-12652 |
| 38 | Alignment and calibration ofRudder with Tiller assembly arrangement.Alignment and calibration ofRudder with Tiller arrangementFor YD-12652 |
| 39 | Preliminary LoS (Line of Sight) (P&S) Re confirm the ‘Ship Centreline’, ‘Ship Baseline’ and ‘Longitudinal Positions’. For YD-12653 |
| 40 | Measuring and marking (P&S)Measure and mark the longitudinal and transverse position of the respective reference points on the Shaft Line Theoretical Axis for the following item• Propeller Centre• A-Bracket• P-Bracket• Stern Tube•Thrust Block•Gear Box• Gas Turbine• Diesel EngineFor YD-12653 |
| 41 | First Line of Sight (LoS) (P&S)Establish Initial Line of Sight using Laser or optical telescope, with reference to target station of Propeller centre and at FR 49.5 target station. For YD-12653 |
| 42 | Gear box seat installation in Diesel Engine room Compartment (P&S)Installation of gear box foundation (seat) with reference to the line of sight and as per mdl drawing , OEM and MSI documentsFor YD-12653 |
| 43 | Thrust block seat installation in AMR-I compartment (P&S)Installation of Thrust blockFoundation(Seat) with reference to the Line of Sight and as per MDL drawing , OEM and MSI documentsFor YD-12653 |
| 44 | Gas Turbine seat installation in GTR compartment (P&S)Installation of Gas TurbineFoundation(Seat) with reference to the Line of Sight and as per MDL drawing , OEM and MSI documentsFor YD-12653 |
| 45 | Diesel Engine seat installation in DER compartment (P&S)Installation of Diesel EngineFoundation(Seat) with reference to the Line of Sight and as per MDL drawing , OEM and MSI documentsFor YD-12653 |
| 46 | Re-confirmation of Propulsion Equipment Foundation seat before and after welding (P&S)Second line of sight to be carried out to reconfirm the position of Propulsion equipment Foundation seatbefore and after weldingFor YD-12653 |
| 47 | Gear box foundation drilling and Shipping –inn Opening and Equipment lowering and securing (P&S)Shipping –inn Opening and Equipment lowering of propulsion related equipment such as CPP & Shafting items, Gear box, Diesel Engine, Gas Turbine and after securing of the same.For YD-12653 |
| 48 | Re-confirmation of all Shafting Target Points(P&S)Second line of sight to be carried out to reconfirm the effect of welding and shipping in of equipment.For YD-12653 |
| 49 | Conduct LoS (Line of Sight)with Stern Drop Measurement and errection of temporary shaft support (P&S)Re confirms the ‘Ship Centreline’, ‘Ship Baseline’ and ‘Longitudinal Positions’. For measurement of Stern Drop.Erection of temporary Shaft supportsPosition temporary supports and align on LoS as per MSI document.For YD-12653 |
| 50 | Initial Positioning/ Fit Up of Stern tube, A- Bracket, P-BracketInitial Positioning/Fit Up of ‘Stern Tube’, ‘A-Bracket’ and ‘P-Bracket’ as per the ‘Line of Sight’ after Stern-drop measurement and closing of all Shipping-in openingFor YD-12653 |
| 51 | Control welding, NDT checksand thermal stress relievingof Stern tube, A- Bracket, P-Bracket (P&S)Controlled welding and thermal stress relievingof Stern tube, A- Bracket, P-Bracket and intermittent readings to be monitored to avoid welding distortionFor YD-12653 |
| 52 | Line of Sightusing Optical / Laser (P&S)Line of sight is done to check the position of “A” Bracket, Stern Tube, “P” bracket and Temporary supports and Equipment with respect to shaft lineFor YD-12653 |
| 53 | Measurementof Chock height Measurement and analysis of Chock heightfor Gear box, Thrust block, Stern tube bearings, P-Bracket bearings, A-Bracket bearings and finalisation of Final LoSFor YD-12653 |
| 54 | FinalLoS (P&S)Final LoSforBearings alignment of A-Bkt, P-Bkt, Stern tube, Thrust block, Gear boxFor YD-12653 |
| 55 | Resin Chocking of Bearings and bolting of bearing housing (P&S)Resin chockingis for A-Bracket, P-Bracket, Stern tube bearing housing and Shaft sighting for reconfirming of LoS, drilling, tapping and boltingFor YD-12653 |
| 56 | Embarkation Outboard Shafting and InstallationEmbarkation of Stern tube shaft, deep sea seal, OKF Flange coupling,Emergency Pitch Setting Device (EPSD), OKC (Sleeve) coupling, Propeller shaftFor YD-12653 |
| 57 | Alignment and Installation of OKC sleeve coupling, EPSD and OKF flange coupling,Alignment and Installation of OKC sleeve coupling, EPSD and OKF flange coupling,For YD-12653 |
| 58 | Measurement of Bearing clearances (P&S)Bearing clearance and Poker Gauge Readings A-Bracket, P-Bracket, Stern tube bearingsFor YD-12653 |
| 59 | Installation of Deep sea seal and Testing (P&S)Installation of Deep sea seal, Air pressure test andHydro test and run-in alignmentFor YD-12653 |
| 60 | Installation of ‘Rope Guard’, ’Net Cutter, and ‘Faring Cones’ and shaft turning device. (P&S)Installation of ‘Rope Guard’, ’Net Cutter, and ‘Faring Cones’ and shaft turning deviceFor YD-12653 |
| 61 | Gap and Sag alignment (P&S)Gap and Sag alignment of TB Aft Flange wrt OKF Coupling, TB Fwd Flange wrt Intermediate Shaft Aft Flange, Intermediate Shaft Fwd Flange wrt GB Output Shaft FlangeFor YD-12653 |
| 62 | Setting the size ofDistance Ring (P&S)Measurement of final sizeofDistance Ring and to be machinedFor YD-12653 |
| 63 | Gear box tooth contact checks (P&S)MRG Tooth Contact Check 1: With ‘MRG Output Shaft’ disconnected from ‘IntermediateShaft’2. With ‘MRG Output Shaft’ connected from ‘IntermediateShaft’For YD-12653 |
| 64 | Final shaft coupling connection (P&S)Final connection of Shaft line to TB and MRGFor YD-12653 |
| 65 | Jack load test of Gear box, Thrust bearing and stern tube shaft (P&S)Jack load test of Gear box, Thrust bearing and stern tube shaft when MRG on Jack screwsFor YD-12653 |
| 66 | Main reduction gear Chock fasting (P&S)Gearbox base to be chock fasted a per MSI and OEM recommendation after satisfactoryand acceptance of OEMFor YD-12653 |
| 67 | Thrust bearing chocking (P&S)Final chocking of TBFor YD-12653 |
| 68 | Final Jack load checks and MRG tooth contact checks (P&S)Final jack load checks and MRG Teeth Contact Check 3 (Final): With ‘MRG Output Shaft’ connected with‘Intermediate Shaft’ and Chocking to FoundationFor YD-12653 |
| 69 | Alignment and Installationof Gas Turbine (P&S)Alignment and Installationof Gas Turbine For YD-12653 |
| 70 | Alignment and Installationof Diesel Engine (P&S)Alignment and InstallationofMain Diesel EngineFor YD-12653 |
| 71 | Installation of Torsion meter, Oil distribution box, Earthing device. (P&S)Balance Installation Activities: including ‘Shaft Brake’, ‘Bulkhead Seal’, ‘Torsion Meter’, ‘Earthing device’ and ‘CPP Oil Distribution Box’.For YD-12653 |
| 72 | Bearing Jack load test after Propeller blade installation (P&S)Bearing Jack load test after Propeller blade installation and feathering checks of CPP SystemFor YD-12653 |
| 73 | Installation of Bulkhead Seals (P&S)Installation of Bulkhead Seals at Fr.#56 & Fr.#65For YD-12653 |
| 74 | Installation of Steering Gear system (P&S)Marking and structural opening as per reference MDL drawing for installation and welding of Rudder Cartridge with Hull plate. Installation of Rudder stock, Hydraulic power pack, tiller, and final alignmentFor YD-12653 |
| 75 | Installation of Steering Gear RamfoundationSeat and Ram base beddingInstallation of Ram Foundation seat bedding and Carryout separatelyRam base bedding.For YD-12653 |
| 76 | Alignment and calibration ofRudder with Tiller assembly arrangement.Alignment and calibration ofRudder with Tiller arrangementFor YD-12653 |
| 77 | Preliminary LoS (Line of Sight) (P&S) Re confirm the ‘Ship Centreline’, ‘Ship Baseline’ and ‘Longitudinal Positions’. For YD-12654 |
| 78 | Measuring and marking (P&S)Measure and mark the longitudinal and transverse position of the respective reference points on the Shaft Line Theoretical Axis for the following item• Propeller Centre• A-Bracket• P-Bracket• Stern Tube•Thrust Block•Gear Box• Gas Turbine• Diesel EngineFor YD-12654 |
| 79 | First Line of Sight (LoS) (P&S)Establish Initial Line of Sight using Laser or optical telescope, with reference to target station of Propeller centre and at FR 49.5 target station. For YD-12654 |
| 80 | Gear box seat installation in Diesel Engine room Compartment (P&S)Installation of gear box foundation (seat) with reference to the line of sight and as per mdl drawing , OEM and MSI documentsFor YD-12654 |
| 81 | Thrust block seat installation in AMR-I compartment (P&S)Installation of Thrust blockFoundation(Seat) with reference to the Line of Sight and as per MDL drawing , OEM and MSI documentsFor YD-12654 |
| 82 | Gas Turbine seat installation in GTR compartment (P&S)Installation of Gas TurbineFoundation(Seat) with reference to the Line of Sight and as per MDL drawing , OEM and MSI documentsFor YD-12654 |
| 83 | Diesel Engine seat installation in DER compartment (P&S)Installation of Diesel EngineFoundation(Seat) with reference to the Line of Sight and as per MDL drawing , OEM and MSI documentsFor YD-12654 |
| 84 | Re-confirmation of Propulsion Equipment Foundation seat before and after welding (P&S)Second line of sight to be carried out to reconfirm the position of Propulsion equipment Foundation seatbefore and after weldingFor YD-12654 |
| 85 | Gear box foundation drilling and Shipping –inn Opening and Equipment lowering and securing (P&S)Shipping –inn Opening and Equipment lowering of propulsion related equipment such as CPP & Shafting items, Gear box, Diesel Engine, Gas Turbine and after securing of the same.For YD-12654 |
| 86 | Re-confirmation of all Shafting Target Points(P&S)Second line of sight to be carried out to reconfirm the effect of welding and shipping in of equipment.For YD-12654 |
| 87 | Conduct LoS (Line of Sight)with Stern Drop Measurement and errection of temporary shaft support (P&S)Re confirms the ‘Ship Centreline’, ‘Ship Baseline’ and ‘Longitudinal Positions’. For measurement of Stern Drop.Erection of temporary Shaft supportsPosition temporary supports and align on LoS as per MSI document.For YD-12654 |
| 88 | Initial Positioning/ Fit Up of Stern tube, A- Bracket, P-BracketInitial Positioning/Fit Up of ‘Stern Tube’, ‘A-Bracket’ and ‘P-Bracket’ as per the ‘Line of Sight’ after Stern-drop measurement and closing of all Shipping-in openingFor YD-12654 |
| 89 | Control welding, NDT checksand thermal stress relievingof Stern tube, A- Bracket, P-Bracket (P&S)Controlled welding and thermal stress relievingof Stern tube, A- Bracket, P-Bracket and intermittent readings to be monitored to avoid welding distortionFor YD-12654 |
| 90 | Line of Sightusing Optical / Laser (P&S)Line of sight is done to check the position of “A” Bracket, Stern Tube, “P” bracket and Temporary supports and Equipment with respect to shaft lineFor YD-12654 |
| 91 | Measurementof Chock height Measurement and analysis of Chock heightfor Gear box, Thrust block, Stern tube bearings, P-Bracket bearings, A-Bracket bearings and finalisation of Final LoSFor YD-12654 |
| 92 | FinalLoS (P&S)Final LoSforBearings alignment of A-Bkt, P-Bkt, Stern tube, Thrust block, Gear boxFor YD-12654 |
| 93 | Resin Chocking of Bearings and bolting of bearing housing (P&S)Resin chockingis for A-Bracket, P-Bracket, Stern tube bearing housing and Shaft sighting for reconfirming of LoS, drilling, tapping and boltingFor YD-12654 |
| 94 | Embarkation Outboard Shafting and InstallationEmbarkation of Stern tube shaft, deep sea seal, OKF Flange coupling,Emergency Pitch Setting Device (EPSD), OKC (Sleeve) coupling, Propeller shaftFor YD-12654 |
| 95 | Alignment and Installation of OKC sleeve coupling, EPSD and OKF flange coupling,Alignment and Installation of OKC sleeve coupling, EPSD and OKF flange coupling,For YD-12654 |
| 96 | Measurement of Bearing clearances (P&S)Bearing clearance and Poker Gauge Readings A-Bracket, P-Bracket, Stern tube bearingsFor YD-12654 |
| 97 | Installation of Deep sea seal and Testing (P&S)Installation of Deep sea seal, Air pressure test andHydro test and run-in alignmentFor YD-12654 |
| 98 | Installation of ‘Rope Guard’, ’Net Cutter, and ‘Faring Cones’ and shaft turning device. (P&S)Installation of ‘Rope Guard’, ’Net Cutter, and ‘Faring Cones’ and shaft turning deviceFor YD-12654 |
| 99 | Gap and Sag alignment (P&S)Gap and Sag alignment of TB Aft Flange wrt OKF Coupling, TB Fwd Flange wrt Intermediate Shaft Aft Flange, Intermediate Shaft Fwd Flange wrt GB Output Shaft FlangeFor YD-12654 |
| 100 | Setting the size ofDistance Ring (P&S)Measurement of final sizeofDistance Ring and to be machinedFor YD-12654 |
| 101 | Gear box tooth contact checks (P&S)MRG Tooth Contact Check 1: With ‘MRG Output Shaft’ disconnected from ‘IntermediateShaft’2. With ‘MRG Output Shaft’ connected from ‘IntermediateShaft’For YD-12654 |
| 102 | Final shaft coupling connection (P&S)Final connection of Shaft line to TB and MRGFor YD-12654 |
| 103 | Jack load test of Gear box, Thrust bearing and stern tube shaft (P&S)Jack load test of Gear box, Thrust bearing and stern tube shaft when MRG on Jack screwsFor YD-12654 |
| 104 | Main reduction gear Chock fasting (P&S)Gearbox base to be chock fasted a per MSI and OEM recommendation after satisfactoryand acceptance of OEMFor YD-12654 |
| 105 | Thrust bearing chocking (P&S)Final chocking of TBFor YD-12654 |
| 106 | Final Jack load checks and MRG tooth contact checks (P&S)Final jack load checks and MRG Teeth Contact Check 3 (Final): With ‘MRG Output Shaft’ connected with‘Intermediate Shaft’ and Chocking to FoundationFor YD-12654 |
| 107 | Alignment and Installationof Gas Turbine (P&S)Alignment and Installationof Gas Turbine For YD-12654 |
| 108 | Alignment and Installationof Diesel Engine (P&S)Alignment and InstallationofMain Diesel EngineFor YD-12654 |
| 109 | Installation of Torsion meter, Oil distribution box, Earthing device. (P&S)Balance Installation Activities: including ‘Shaft Brake’, ‘Bulkhead Seal’, ‘Torsion Meter’, ‘Earthing device’ and ‘CPP Oil Distribution Box’.For YD-12654 |
| 110 | Bearing Jack load test after Propeller blade installation (P&S)Bearing Jack load test after Propeller blade installation and feathering checks of CPP SystemFor YD-12654 |
| 111 | Installation of Bulkhead Seals (P&S)Installation of Bulkhead Seals at Fr.#56 & Fr.#65For YD-12654 |
| 112 | Installation of Steering Gear system (P&S)Marking and structural opening as per reference MDL drawing for installation and welding of Rudder Cartridge with Hull plate. Installation of Rudder stock, Hydraulic power pack, tiller, and final alignmentFor YD-12654 |
| 113 | Installation of Steering Gear RamfoundationSeat and Ram base beddingInstallation of Ram Foundation seat bedding and Carryout separatelyRam base bedding.For YD-12654 |
| 114 | Alignment and calibration ofRudder with Tiller assembly arrangement.Alignment and calibration ofRudder with Tiller arrangementFor YD-12654 |
AI Tender Summary
Tender Timeline
Aug 13, 2021
11:30 IST
Tender Published
Tender notice published.
CompletedSep 06, 2021
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedSep 07, 2021
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents