Emergent Restoration And Mitigation Measure For Breach Closing To The Kuia Right Embankment At Khanpur
Tender Value
86 Lakhs
Estimated cost
Bid Submission
31 Aug 2021
0 days left
EMD
1.72 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
LABPUR → West Bengal
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Emergent Restoration And Mitigation Measure For Breach Closing To The Kuia Right Embankment At Khanpur
BOQ
| Sl. No. | Item Description |
| 1 | Earthwork in excavation in all kinds of soil for making embankments,repairs to the embankment, closing breaches etc. as per profile including supply and transporting the Earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary anddepositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of,NB :- easurement to be taken on the basis of stack measurement / prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking.b) Beyond 1.00 km and upto 2.00 km |
| 2 | c) Beyond 2.00 km and upto 3.00 km |
| 3 | d) Beyond 3.00 km and upto 4.00 km |
| 4 | Earthwork from borrow pits over existing embankment or for repairs to embankment, closing breaches etc. within an initial lead of 30 metre and lift of 1.50 metre including breaking clods and depositing the same in layers not exceeding 25 cm. and rough dressing etc. complete as per profile. |
| 5 | Extra rate over Item No.2 for all kinds of soil for every additional lead of 30 metres or part thereof beyond the initial lead of 30 metres.one additional lead |
| 6 | Two additional lead |
| 7 | Tthree additional lead |
| 8 | Turfing with chorkata or durba grass sods 5 cm. to 8 cm. thick in slope,crest berm etc. of embankments, canals and drainage channels etc.within a lead of 150 metre and all lifts including fine dressing, watering,ramming, guarding etc. complete. (sods will have to be arranged by the contractor at his own cost. Payment to be made on the grown grassonly). |
| 9 | Supplying Jhaw / Eucalyptus bullah piles at work site, including dressing and making one end pointed.iii) 15.00 cm. average dia.Note: Diameter of pile to be measured at a distance of 1.5m from the thicker end. |
| 10 | iii) 12.5 cm. average dia.Note: Diameter of pile to be measured at a distance of 1.5m from the thicker end. |
| 11 | Supplying, fitting and fixing M.S iron shoe to Jhaw / Eucalyptus bullah piles including necessary cleats, nails etc. complete. a) For bullahs above 10 cm & up to 20 cm av. Diameter |
| 12 | Labour for driving Jhaw / Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles.2) For string staging under specific instruction of Engineer-in-charge orfor driving from pontoon or boats, the rate will be enhanced by ` 4.00 per meter. Rate Per Mtr Driving from boat = 115+4 =Rs.119.00iii) c) 15.00 cm. dia bullah. |
| 13 | ii) c) 12.5 cm. dia bullah. |
| 14 | Extra rate 2) For string staging under specific instruction of Engineer-in-charge or for driving from pontoon or boats, the rate will be enhanced by 4.00 per meter. |
| 15 | Supplying, fitting and fixing with iron nails half split bullah wailing pieces and cross pieces etc. complete with cost of all materials and carriage to site.(a) Width of thinner end above 10 cm. and less than 15 cm.(i) Jhaw / Eucalyptus. |
| 16 | Splicing (as per drawing and direction of the Engineer-in-charge) in position 150 mm. to 250 mm. dia. of individual bullah with 2 Nos. 1250 mm. x 75 mm. x 10 mm. M.S. flat and 4 Nos. half rings made of(700 x 75 x 6) mm. M.S. flat fitted and fixed with 4 Nos. 12 mm. dia. bolts with nuts and washers. Flat bars are to be fitted and fixed with 3 Nos. 20 mm. dia. through bolts with nuts and washers including cost of supply and carriage of all materials, making necessary scaffolding, stagging etc. drilling holes complete (splicing is to be done on position after the bottom bullah is driven as per necessity). Length of lap of bullah should be provided as five times the diameter of bullah or 90 cm. whichever is greater. |
| 17 | Supply of Fine Sand (Grading Zone III as per IS: 383-1970) stacked at site. |
| 18 | Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg). |
| 19 | Labour charges for filling empty cement gunny bag / polythene bag(capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,( tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials). NB:- Volume of earth/ sand filled bags should not be less than 0.028 cum/ bag. |
| 20 | Dumping in position earth / sand filled gunny / poly bags (capacity 50 kg) within a lead of 30 metre inclusive of all lifts. |
| 21 | Coal tarring with 5% pitch including cost of material and labour complete as per direction of the Engineer-in-charge a) One Coat |
| 22 | Extra rate for puddling earth in layer of 15 cm. including watering and ramming, if necessary, all complete as per the direction of the Engineering- charge . |
| 23 | Pumping out water from ponds or tanks (Payment if permitted will be made on the quantity of water calculated on the basis of initial water level and final level on consideration being made for any water that may have been added through percolation or otherwise) |
AI Tender Summary
Tender Timeline
Aug 11, 2021
11:30 IST
Tender Published
Tender notice published.
CompletedAug 31, 2021
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedSep 03, 2021
Bid Opening Date
Technical bids will be opened and evaluated.